  • REPUBLIQUE DEMOCRATIQUE DU CONGO

    MINISTERE DU DEVELOPPEMENT RURAL

    SECRETARIAT GENERAL DU DEVELOPPEMENT RURAL

    SERVICE NATIONAL D’HYDRAULIQUE RURALE « SNHR »

    PROJET IDIOFA : RAPPORT SYNTHESE DES CALCULS HYDRAULIQUES

    DES RESEAUX D’ADDUCTION D’EAU

    Janvier 2020 (V-2)

  • 1

    TABLE DE MATIERES

    I. INTRODUCTION : ……………………………………………………………………………………………………………2

    II. TABLEAU 1 : DONNEES DE BASE : …………………………………………………………………………………..3

    III. TABLEAU 2 : ESTIMATION DE DEBIT :………………………………………………………………………………5

    IV. TABLEAU 3 : HAUTEUR GEOMETRIQUE DE REFOULEMENT : ………………………………………….6

    V. TABLEAU 4 : CALCULS HYDRAULIQUES : …………………………………………………………………………8

    ANNEXES : …………………………………………………………………………………………………………………. 12

  • 2

    I. INTRODUCTION

    La modernisation des systèmes d’approvisionnement en eau potable dans les milieux semi-

    urbains et ruraux poursuit à l’amélioration de la santé des populations par la limitation des

    risques de santé en leur apportant une eau saine en qualité et en quantité suffisante.

    Une installation d’adduction en eau potable (AEP) comprend une source d’approvisionnement

    (une source d’eau ou un puits ou un forage), une pompe et des infrastructures : château d’eau

    et réseau de tuyauteries terminés par des bornes fontaines.

    Dans le cadre de l’amélioration de l’approvisionnement en eau potable et de l’assainissement

    dans dix villages du territoire d’Idiofa, dans la province de Kwilu en RD Congo, 16 forages d’eau

    ont été exécutés. Parmi lesquels 11 ont réussis (forages positifs) et 5 ont échoués (forages

    négatifs) dont il faut à refaire.

    Le présent rapport n’est rien d’autre que les résultats des calculs hydrauliques de l’adduction

    d’eau, soit du forage au réservoir. La finalité est de connaitre : les caractéristiques nécessaires

    (débit et hauteur manométrique totale) pour le choix de la pompe à installer dans le forage

    pour refouler l’eau jusqu’au réservoir, le diamètre et la pression nominale (PN) du tuyau ainsi

    que la vitesse du fluide refoulé par la pompe appropriée.

  • 3

    II. TABLEAU 1 : DONNEES DE BASE

    FORAGE ADDUCTION D'EAU

    PROFONDEUR TUBAGE CONDUITE DE REFOULEMENT OBSERVATIONS

    N° d'ordre

    VILLAGE N° Prévue

    (m) Forée

    (m)

    Ø tuyau (mm)

    PN tuyau (bars)

    Ep. tuyau (mm)

    Alt. (m)

    Nppe – Tfge (m)

    Tfge - S.Rés (m)

    S.Rés - Rés (m)

    Lc (m)

    Alt. Rés. (m)

    1 INGUNDU 1 140 116 160 16 8 666 110 10 6 126 672 Forage réussi

    2 IMPINI INSI 1 160 181 160 16 8 696 175 7,5 6,2 188,7 702,2 Forage réussi

    2 160 152 160 16 8 696 146 7,5 6,2 159,7 702,2 Forage réussi

    3 KIPUKU

    1 220 220 160 16 8 650 214 15 6 235 656 Forage réussi

    3 220 203 160 16 8 650 197 12 6 215 656 Forage réussi

    4 220 216 160 16 8 650 210 12 6 228 656 Forage réussi

    4 MPUKULU 1 160 114 160 16 8 612 154 7,5 6 167,5 618 Forage à refaire

    5 MAYANDA MUSANDA

    1 160 132 160 16 8 562 154 20 6,2 180,2 568,2 Forage à refaire

    6 NKUTU MAYANDA

    1 160 144 160 16 8 585 154 23,8 6,2 184 591,2 Forage à refaire

    7 BANGA BANGA 1 140 18 160 16 8 461 134 6,5 6,2 146,7 467,2 Forage à refaire

    2 140 10 160 16 8 461 134 15 6,2 155,2 467,2 Forage à refaire

    8 KALANGA NGANDA

    1 160 150,5 160 16 8 557 144,5 5,5 6 156 563 Forage réussi

    2 160 151 160 16 8 557 145 6 6 157 563 Forage réussi

    9 INTSWEM LABUI 1 140 114 160 16 8 714 108 10 6 124 720 Forage réussi

    2 140 108 160 16 8 714 102 10 6 118 720 Forage réussi

    10 BWALENGE 1 70 80 160 16 8 654 74 7 6 87 660 Forage réussi

    16

  • 4

    RECAPITULATIF DES FORAGES

    FORAGES

    DESIGNATION Prévus Exécutés et réussis A refaire

    NOMBRE 16 11 5

    EXPLICATION DU TABLEAU 1

    Abréviations utilisées

    1. Ø : Diamètre en mm

    2. PN : Pression Nominale en bars

    3. Ep. : Epaisseur en mm

    4. Alt. : Altitude en m

    5. Nppe : Niveau de la pompe

    6. Tfge : Tête de forage

    7. S.rés : Support réservoir

    8. Rés. : Réservoir

    9. Lc : Longueur cumulée de la conduite en m

    10. Alt. Rés. : Altitude du réservoir

    Formules utilisées

    1. Nppe (Niveau de la pompe) = profondeur forée moins 6 mètres : pour les cas des

    forages réussis ;

    2. Nppe (Niveau de la pompe) = profondeur prévue moins 6 mètres : pour les cas des

    forages à refaire ;

    3. Lc (Longueur cumulée de la conduite) = distance (Nppe –Tfge) + distance (Tfge-S.rés.) +

    distance (S.rés. - Rés.)

    4. Altitude du réservoir (Alt. Rés.) = Altitude de forage + la hauteur du support du réservoir

    et le réservoir (dans le cas de ce projet, elle varie de 6 à 6,2 mètres) ;

  • 5

    III. TABLEAU 2: ESTIMATION DE DEBIT

    EXPLICATION DU TABLEAU 2

    1. Le niveau de la profondeur d’eau après test de pompage varie de 15 à 20 m par rapport

    à la profondeur forée (dans le cas de ce projet) ;

    2. Puissance (en KW) et le débit estimé (en m³/h) de la pompe ont été évalués en fonction

    des courbes caractéristiques du système fournies par le logiciel LORENTZ ;

    3. Profondeur d'eau prévisionnelle (m) = profondeur forée - 18 m ;

    4. Niveau d'installation de la pompe (m) = profondeur forée - 6 mètres : pour les cas des

    forages réussis ;

    5. Niveau d'installation de la pompe (m) = profondeur prévue - 6 mètres : pour les cas des

    forages à refaire ;

    6. Débit estimé (en L/s) = Débit estimé (en m³/h)*1000/3600.

    FORAGE

    PROFONDEUR POMPE SOLAIRE

    N° d'ordre

    VILLAGE N° Prévue (m)

    Forée (m)

    Eau prévisionnelle (m)

    Eau après test de

    pompage (m)

    Niveau d'installation (m)

    Puissance (KW)

    Débit estimé (m³/h)

    Débit estimé

    (L/s)

    1 INGUNDU 1 140 116 98 100 110 1,7 2,5 0,69

    2 IMPINI INSI 2 160 181 163 162 175 1,47 2,2 0,61

    160 152 134 137 146 1,47 2,3 0,64

    3 KIPUKU 3

    220 220 202 204 214 3,165 2 0,56

    220 203 185 188 197 3,165 2,6 0,72

    220 216 198 196 210 3,165 2,2 0,61

    4 MPUKULU 1 160 114 142 0 154 1,47 2,5 0,69

    5 MAYANDA MUSANDA

    1 160 132 142 0 154 1,47 2,45 0,68

    6 NKUTU MAYANDA

    1 160 144 142 0 154 1,47 2,4 0,67

    7 BANGA BANGA

    2 140 18 122 0 134 1,7 2,4 0,67

    140 10 122 0 134 1,7 2,4 0,67

    8 KALANGA NGANDA

    2 160

    150,5

    132,5 134 144,5 1,47 2,3 0,64

    160 151 133 132 145 1,47 2,3 0,64

    9 INTSWEM LABUI

    2 140 114 96 94 108 1,265 2,5 0,69

    140 108 90 91 102 1,265 2,6 0,72

    10 BWALENGE 1 70 80 62 60 74 0,811 2,6 0,72

  • 6

    IV. TABLEAU 3 : HAUTEUR GEOMETRIQUE DE REFOULEMENT

    FORAGE POMPE SOLAIRE RESERVOIR REFOUL.

    N° VILLAGE Nbre Prof.

    prévue (m)

    Prof. forée (m)

    Prof. Eau prévision

    nelle. (m)

    Prof. Eau après test

    de pompage

    (m)

    Alt. (m)

    Niveau d'installation (m)

    Puissance (KW)

    Débit estimé

    (m³/h)

    Débit estimé

    (L/s) Alt. (m) Alt. (m)

    Hauteur Géom.

    (m)

    1 INGUNDU 1 140 116 98 100 666 110 1,7 2,5 0,69 556 672 116

    2 IMPINI INSI 2 160 181 163 162 696 175 1,47 2,2 0,61 521 702,2 181,2

    160 152 134 137 696 146 1,47 2,3 0,64 550 702,2 152,2

    3 KIPUKU 3

    220 220 202 204 650 214 3,165 2 0,56 436 656 220

    220 203 185 188 650 197 3,165 2,6 0,72 453 656 203

    220 216 198 196 650 210 3,165 2,2 0,61 440 656 216

    4 MPUKULU 1 160 114 142 0 612 154 1,47 2,5 0,69 458 618 160

    5 MAYANDA MUSANDA

    1 160 132 142 0 562 154 1,47 2,45 0,68 408 568,2 160,2

    6 NKUTU MAYANDA

    1 160 144 142 0 585 154 1,47 2,4 0,67 431 591,2 160,2

    7 BANGA BANGA

    2 140 18 122 0 461 134 1,7 2,4 0,67 327 467,2 140,2

    140 10 122 0 461 134 1,7 2,4 0,67 327 467,2 140,2

    8 KALANGA NGANDA

    2 160 150,5 132,5 134 557 144,5 1,47 2,3 0,64 412,5 563 150,5

    160 151 133 132 557 145 1,47 2,3 0,64 412 563 151

    9 INTSWEM LABUI

    2 140 114 96 94 714 108 1,265 2,5 0,69 606 720 114

    140 108 90 91 714 102 1,265 2,6 0,72 612 720 108

    10 BWALENGE 1 70 80 62 60 654 74 0,811 2,6 0,72 580 660 80

    NB : Puissance (en KW) et le débit estimé (en m³/h) de la pompe ont été évalués en fonction des courbes caractéristiques du

    système fournies par le logiciel LORENTZ.

  • 7

    EXPLICATIONS DU TABLEAU 3

    1. Nbre : Nombre ;

    2. Prof. : profondeur ;

    3. Géom. : géométrique ;

    4. Profondeur d'eau prévisionnelle (m) = profondeur forée - 18 m ;

    5. Niveau d'installation de la pompe (m) = profondeur forée (exécutée) - 6 mètres : pour

    les cas des forages réussis ;

    6. Niveau d'installation de la pompe (m) = profondeur prévue - 6 mètres : pour les cas des

    forages à refaire ;

    7. Débit estimé (en L/s) = Débit estimé (en m³/h)*1000/3600 ;

    8. Altitude de la pompe solaire = Altitude de forage moins (-) le niveau d'installation de la

    pompe ;

    9. Altitude du réservoir (Elevation of Station II) = Altitude de forage plus (+) la hauteur du

    support du réservoir et le réservoir (dans ce projet, elle varie de 6 à 6,2 mètres) ;

    10. Hauteur géométrique de refoulement (Hgr)= Altitude du réservoir moins (-) Altitude

    de la pompe.

  • 8

    V. TABLEAU 4 : CALCULS HYDRAULIQUES

    Water Supply

    Design Sheet

    Nominal pressure required = 10 bars

    Maximum permissible speed, v = 1,0 m/s

    HGL @ StI - hl @ ST II = HGL @ STII

    Hazen-Williams equa, = hl = (1,21*1010*L)/d4,87*(Q/C)1,851

    hl = head loss, m; L = length of pipe section, m;

    or h1 = ((10,65x(Q1^1,851))xL/(C^1,851)x(d^4,871))

    Q = flow rate,l/s

    d = internal diameter of pipe, mm; Q1 = flow rate,m3/s

    Pipe roughness coefficient C = 150

    December, 2019

    Flow at First Section:

    REACH 1 2 3 4 5 6 7 8 9 10 11 12 13 14

    Point No.

    VILLAGE Section Station I Station

    II Q

    (L/s)

    Pipe Length

    (Metres)

    Cumulative Distance (Metres)

    Pipe Ø

    (mm)

    NP (bars)

    Inside Ø of Pipe (mm)

    Head Loss

    (Metres)

    HGL @ Station

    I

    Elevation of

    Station II

    HGL @ Station

    II

    Total Dynamic head

    Vel. (m/s)

    Pressure (m)

    Remark

    1 INGUNDU A B Pump at Borehole

    Storage tank Tank

    0,69 126 126 40 12,5 35,2 2,13 556 672 669,87 128,46 0,71 113,87

    2 IMPINI INSI

    A B Pump at Borehole

    Storage tank Tank

    0,61 188,7 188,7 40 25 31 4,71 521 702,2 697,49 196,24 0,81 176,49

    A B Pump at Borehole

    Storage tank Tank

    0,64 159,7 159,7 40 16 34 2,78 550 702,2 699,42 165,31 0,71 149,42

    3 KIPUKU

    A B Pump at Borehole

    Storage tank Tank

    0,56 235 235 40 25 31 5,01 436 656 650,99 235,34 0,74 214,99

    A B Pump at Borehole

    Storage tank Tank

    0,72 215 215 40 25 31 7,3 453 656 648,7 220,63 0,95 195,7

    A B Pump at Borehole

    Storage tank Tank

    0,61 228 228 40 25 31 5,7 440 656 650,3 232,03 0,81 210,3

    4 MPUKULU A B Pump at Borehole

    Storage tank Tank

    0,69 167,5 167,5 40 16 34 3,35 458 618 614,65 173,68 0,76 156,65

  • 9

    Flow at First Section:

    REACH 1 2 3 4 5 6 7 8 9 10 11 12 13 14

    Point No.

    VILLAGE Section Station I Station

    II Q

    (L/s)

    Pipe Length

    (Metres)

    Cumulative Distance (Metres)

    Pipe Ø

    (mm)

    NP (bars)

    Inside Ø of Pipe (mm)

    Head Loss

    (Metres)

    HGL @ Station

    I

    Elevation of

    Station II

    HGL @ Station

    II

    Total Dynamic head

    Vel. (m/s)

    Pressure (m)

    Remark

    5 MAYANDA MUSANDA

    A B Pump at Borehole

    Storage tank Tank

    0,68 180,2 180,2 40 16 34 3,51 408 568,2 564,69 174,04 0,75 156,69

    6 NKUTU MAYANDA

    A B Pump at Borehole

    Storage tank Tank

    0,67 184 184 40 16 34 3,49 431 591,2 587,71 174,02 0,74 156,71

    7 BANGA BANGA

    A B Pump at Borehole

    Storage tank Tank

    0,67 155,2 155.2 40 16 34 2,94 327 467,2 464,42 153,31 0,74 137,26

    A B Pump at Borehole

    Storage tank Tank

    0,67 155,2 155,2 40 16 34 2,94 327 467,2 464,26 153,47 0,74 137,26

    8 KALANGA NGANDA

    A B Pump at Borehole

    Storage tank Tank

    0,64 156 156 40 16 34 2,72 412,5 563 560,28 163,55 0,71 147,78

    A B Pump at Borehole

    Storage tank Tank

    0,64 157 157 40 16 34 2,73 412 563 560,27 164,06 0,71 148,27

    9 INTSWEM LABUI

    A B Pump at Borehole

    Storage tank Tank

    0,69 124 124 40 12,5 35,2 2,1 606 720 717,9 126,43 0,71 111,9

    A B Pump at Borehole

    Storage tank Tank

    0,72 118 118 40 12,5 35,2 2,16 612 720 717,84 120,49 0,74 105,84

    10 BWALENGE A B Pump at Borehole

    Storage tank Tank

    0,72 87 87 40 12.5 35,2 1,88 580 660 658,12 88,88 0,79 78.12

  • 10

    EXPLICATION DU TABLEAU 4

    Abréviations

    Section Station A B Station I Station I

    Aval (Profondeur ou niveau d'installation de la pompe)

    Amont (niveau fini du réservoir)

    Profondeur ou niveau d'installation de la pompe

    Niveau fini du réservoir

    Formules utilisées

    1. Pertes de charges (Head Loss), h1 = ((10,65x (Q1^1,851)) x L/(C^1,851) x (d^4,871)) en

    Mètres, avec :

    Q1 : débit (flow rate) en m3/s ;

    L : longueur de la conduite (Pipe Length) ou longueur totale de la conduite en m ;

    C : Coefficient de rugosité (Pipe roughness coefficient) de (of) HAZEN WILLIAMS ;

    d : diamètre intérieur de la conduite (Inside Ø of Pipe) en mm.

    2. Longueur ou distance cumulée (Cumulative Distance) en Mètres = Longueur du tuyau

    (Pipe Length) ;

    3. Diamètre intérieur de la conduite (Inside Ø of Pipe) en mm= Pipe Ø (mm) – Deux fois

    Epaisseur du tuyau ;

    4. Ligne piézométrique en station I (HGL @ Station I) = Altitude de la pompe solaire c’est-à-

    dire Altitude de forage moins (-) le niveau d'installation de la pompe ;

    5. Altitude du réservoir (Elevation of Station II) = Altitude de forage plus (+) la hauteur du

    support du réservoir et le réservoir (dans ce projet, elle varie de 6 à 6,2 mètres) ;

    6. Ligne piézométrique en station II (HGL @ Station II) = Altitude du réservoir (Elevation of

    Station II) moins les pertes de charge totales (Total Head Loss);

    7. Vitesse (Velocity) en m/s = (Q1/1000)/((3,14/4)x(d/1000)^2), avec :

    Q1 : débit (flow rate) en m³/s ;

    3,14 : Pi ;

    d : diamètre (Ø) intérieur de la conduite (Inside Ø of Pipe) en mm

    8. Pression (pressure) = Ligne piézométrique en station II (HGL @ Station II) moins Ligne

    piézométrique en station I (HGL @ Station I)

    9. Hauteur Manométrique Totale (Total Dynamic head) = Hgr + Jtot + Pr, avec :

    Hgr : hauteur géométrique de refoulement en m = Altitude du réservoir moins (-)

    Altitude de la pompe ;

    Jtot: Pertes de charges totales (Total Head Loss) c’est à dire linéaires et

    singulières.

  • 11

    En toute rigueur, les pertes de charge singulières doivent être calculées. Dans le cas d’une

    pompe immergée refoulant (pas de hauteur d’aspiration), ce terme est parfois négligé ou

    estimé arbitrairement de 5 à 10%. Dans ce projet, ce terme n’est pas pris en compte à cause de

    son insignifiance. C’est pour cela Jtot seront égales à h1.

    Pr : pression résiduelle à la sortie du tuyau de refoulement, elle vaut 1 bar, soit

    10,33 m de colonne d’eau dans les conditions normales de température et de

    pression.

    NB : La hauteur manométrique totale (Total Dynamic head) est la pression mesurée en m de

    colonne d’eau qu’une pompe devra imprimer à un volume de liquide pour assurer son transfert

    d’un point à un autre point géométriquement différent. Elle permet de déterminer le couple

    HMT- débit afin de choisir la pompe appropriée.

    Le facteur de sécurité n’intervient pas dans le calcul de La hauteur manométrique totale.

    Néanmoins, lors du choix de la pompe appropriée, la valeur de la HMT sera prise à la hausse par

    rapport à celle calculée dans le tableau 4.

    Choix du diamètre de la conduite

    Etant donné que les débits (flow rate) à véhiculer dans les conduites sont faibles, de l’ordre de

    2 à 2,6 m3/h ou de 0,56 à 0,72 l/s, il est inutile d’utiliser de grand diamètre pour le refoulement

    d’eau. Le choix de diamètre de 40 mm ne posera aucun problème pour le refoulement.

    En hydraulique :

    La diminution du diamètre de la conduite entraine la diminution de la pression et

    l’augmentation des pertes de charge, la hauteur manométrique totale ainsi que la

    vitesse.

    L’augmentation du diamètre de la conduite entraine l’augmentation de la

    pression et la diminution des pertes de charge, la hauteur manométrique totale

    ainsi que la vitesse.

  • 12

    ANNEXES : ABAQUES DES PRESSIONS NOMINALES ET EPAISSEURS DES TUBES EN FONCTION DIAMETRES

    1. Tuyaux pression AEP et branchement

    L'expérience dans ce domaine n'est plus à démontrer. Au fil des années, ITP a su convaincre les utilisateurs de l'Afrique occidentale et centrale par sa capacité à fournir des tuyaux pour des grands projets d'adduction d'eau potable (AEP) et pour des travaux de branchement. De la matière à la fabrication en passant par les différents tests de contrôle de qualité, du stockage à la livraison et la mise en œuvre des tuyaux fabriqués pour conduire l'eau partout et pour tous.

    Diamètre Nominal

    (mm)

    Epaisseurs nominales des Tubes

    PN 6 BARS PN 8BARS PN 10 BARS PN 12.5 BARS PN 16 BARS

    Epais

    Poids

    Kg/m Epais

    Poids

    Kg/m Epais

    Poids

    Kg/m Epais

    Poids

    Kg/m Epais

    Poids

    Kg/m 20

    1.5 0.136

    25

    1.5 0.174 1.9 0.214 32

    1.6 0.242 1.9 0.279 2.4 0.343

    40 1.5 0.286 1.6 0.306 1.9 0.354 2.4 0.437 3.0 0.533 50 1.6 0.386 2.0 0.468 2.4 0.554 3.0 0.687 3.7 0.818

    63 1.9 0.569 2.5 0.732 3.0 0.866 3.8 1.076 4.7 1.301

    75 2.2 0.780 2.9 1.005 3.6 1.231 4.5 1.511 5.6 1.818

    90 2.7 1.139 3.5 1.460 4.3 1.757 5.4 2.178 6.7 2.63

    110 2.6 1.352 3.4 1.753 4.2 2.122 5.3 2.6367 6.6 3.228

    125 3.0 1.791 3.9 2.262 4.8 2.747 6.0 3.400 7.4 4.020

    140 3.3 2.189 4.3 2.786 5.4 3.470 6.7 4.227 8.3 5.156

    160 3.8 2.843 4.9 3.620 6.2 4.523 7.7 5.543 8.3 5.943

    200 4.7 4.377 6.2 5.700 7.7 7.003 9.6 8.620 11.9 10.528

    225 5.3 5.540 6.9 7.128 8.6 8.792 10.8 10.898 13.4 13.346

    250 5.9 6.845 7.7 8.825 9.6 10.891 11.9 13.339 14.8 16.343

    315 7.4 10.777 9.7 13.974 12.1 17.262 15.0 21.204 18.7 25.982

  • 13

    2. TUBES PVC-U PRESSION : PAR SOTICI (Entreprise)

    DIMENSIONS DES TUBES

    Diamètre Extérieur (mm)

    Epaisseurs Nominales (mm)

    HN(1) PN6 PN10 PN16 PN25

    NF/ISO NF(2) DIN(3) NF EN(4) NF/ISO NF/ISO

    20 1 - - - - 1.5 2.3

    25 1.2 - 1.5 1.5 - 1.9 2.8

    32 - - 1.8 1.8 1.6 2.4 3.6

    40 - - 2.4 1.9 1.9 3.0 4.5

    50 - - 2.4 2.4 2.4 3.7 5.6

    63 - 2.0 3.0 3.0 3.0 4.7 7.1

    75 - 2.3 3.6 3.6 3.6 5.6 -

    90 - 2.8 4.3 4.3 4.3 6.7 -

    110 - 2.7 5.3 5.3 4.2 6.6 -

    125 - 3.1 6.0 6.0 4.8 7.4 -

    140 - 3.5 6.1 6.7 5.4 8.3 -

    160 - 3.8 6.2 7.7 6.2 9.5 -

    200 - 4.7 7.7 9.6 7.7 11.9 -

    225 - 5.3 8.6 10.8 8.6 13.4 -

    250 - 5.9 9.6 11.9 9.6 14.8 -

    280 - 6.9 10.7 13.4 10.7 16.6 -

    315 - 7.4 12.1 15.0 12.1 18.7 -

    355 - 8.7 13.6 - 13.6 21.1 -

    400 - 9.8 15.3 - 15.3 23.7 -

    450 - 11.0 17.2 - 17.2 26.7 -

    500 - 12.3 19.1 - 19.1 29.7 -

    560 - 13.7 21.4 - 21.4 - -

    630 - 15.4 24.1 - 24.1 - - (1)Hors normes

    (2)Selon la norme française NF T 54-016

    (3)Selon la norme allemande DIN 8062

    (4)Selon la nouvelle norme européenne NF EN ISO 1452 – 2 : 2010

    NB : Les lignes en jaune