    INSTRUCTION MANUAL FOR AIR SOURCE

    CIRCULATING HEAT PUMP WATER HEATERModel CCHP17.5II

    (220V /60Hz, three phase)

  • 7/30/2019 Manu Installation CCHP17

    2/20

    Product Manual

    1

    THIS MANUAL MUST BE READ AND

    UNDERSTAND BYA QUALIFIED PERSON OR PERSONS

    BEFORE INSTALLATION.

    CONTENTS

    INotes for Users--------------------------------------------------------02

    IIProducts Introduction------------------------------------------------02

    IIIPrinciple of Heat Pump----------------------------------------------04

    IVOperation Illustration------------------------------------------------05

    VInstalling Instruction-------------------------------------------------09

    VIDebugging and Running---------------------------------------------13

    VIIMaintenance--------------------------------------------------------15

    VIIICommon Faults and Debugging-----------------------------------16

    IXWarranty services---------------------------------------------------18

    XElectrical wiring Diagram--------------------------------------------19

  • 7/30/2019 Manu Installation CCHP17

    3/20

    Product Manual

    2

    I. Notes for users

    1. Thanks for choosing our heat pump. In order to avoid the damage of facilities, injury of

    operators and loss of possession, please read the instruction carefully before installation.

    2. Please pay more attentions to our latest products. The models and standards of our

    products gradually adjust with the progress of technology.

    3. If you have any questions about technology after you read the manual, please inquire the

    local agent as soon as possible.

    4. Installing warning:

    4.1 Please select whether the size of power supply matches with the power of the heat pump,

    and more details, please refer to the nameplate or the installation manual.

    4.2 Be sure to install the disconnected devices at least 3mm contact opening distance of the

    all pole.

    4.3 The unit must land on the ground. It is forbidden to use the unit without accessing to the

    ground. Do not connect the ground wire to the null wire or to the tap water pipe.

    4.4 make sure the dealer install the wires referring to the diagram.

    4.5 For the safety, no altering or mending the units privately.

    4.6 It may cause burn when the water temperature is over 52. Please mix the hot water with

    cold water before using.

    4.7 Avoid the damage of unit caused by against the fan, no inserting anything into the units.

    4.8 Do not remove fins or panel when you use hot water, in order to avoid accident or running

    in bad order.

    4.9 Please communicate with us immediately once the units sink into the water, and reuseuntil being checked by professional operator.

    4.10 No adjusting the switch, valve, controller inside the units unless professional.

    4.11 No adjusting the parameters unless professional.

    II. Products introduction:

    1. Unit features

    New-generation Water Heater

    Creatively applying the principle of reverse Carnot cycle, it is the latest generation waterheater after gas water heater, electric water heater and solar water heater.

    Widely Usage

    It is applying all the year around, without the limitation of weather. The ambient temperature

    ranges from -15-55. It can be used for hot water or heating.

    Safety and Reliable

    Water heating hour is only the transmission process of heat energy of actuating medium in

    system to eliminate the potential hazard of electric shock thoroughly without the contact

    between electricity and water.

    Durable and Stable

  • 7/30/2019 Manu Installation CCHP17

    4/20

    Product Manual

    3

    Heat pump life expectancy can reach as many as 10-15 years or above with its main parts

    adopting internationally famous brands.

    Intelligence

    Huge LCD display screen, menu interface; intelligent controlling automatically, everything isunder control. Intelligent defrosting system and reusable operations make it more suitable for

    multiple environments and better protect the machine.

    Environmental Friendly

    No waste heat, no waste water, no waste gas, zero release and none of pollutions, reduce

    global greenhouse effect.

    2. Air-source heat pump water heater technical performance parameter table:

    Model CCHP17.5II

    Rated heating capacity(KW) 19

    Rated produce hot water capacity (L/h) 408

    Rated outlet water temperature() 50 ~ 55

    Max outlet water temperature() 60

    Electricity

    parameter

    Rated power (KW) 4.8

    Rated Current (A) 8.5

    Maximum power (KW) 6.9

    Maximum-current(A) 11.8

    Refrigerante R22 (kg 2.9

    Unit Dimensions (mm) 820 x 820 x 1060

    Power Supply 220V ~ 3N/60HZ

    Heat exchange

    Type Efficient tube heat exchanger

    Pipe specification 2DN25

    Circle water flow (M3/h) 3.3

    Water pressure drop 50KPa

    Unit control type Microcomputer central processor (line control)

    Fan Form External rotor motor Alloy BladesUnit Control Microcomputer central processor ( line control )

    Protection function

    High pressure protectionLow pressure protection

    Anti-phase/Open phase protectionWater flow switch

    Freeze protection

    Suit Environment temperature () -10 ~ 43

    Unit weightKg 170

    Noise dB(A) 65

    Standard Test Conditions: Outdoor dry bulb temperature 20wet bulb temperature 15

    water inlet temperature 15water outlet temperature 55

  • 7/30/2019 Manu Installation CCHP17

    5/20

    Product Manual

    4

    The information above is for reference only, actual size in order to prevail in kind.

    III. Principle of Heat Pump

    Heat pump system schematic diagram:

    Operating Principle

    Air heat energy is a new generation hot water equipment, it successfully applies reverse

    Carnot principle by using electric energy to drive heat pump to make refrigerant constantly

    accomplish the thermodynamic cycle process of evaporation (absorption of the heat energy in

    air)-compression-condensation - throttling- evaporation through the components in heat

    pump equipment-evaporator, heat pump, condenser and expansion valve to transfer the heat

    energy in environment into water and large amounts of free heat energy in air into domestic

    water.

  • 7/30/2019 Manu Installation CCHP17

    6/20

    Product Manual

    5

    IV. Operating Illustration

    1. Operation panel

    2. Operation

    With the operation panel on power, the buzzer sounding, the monitor display, and its back

    light brightening slight, the feel touch keys are locked and be invalid with touching any keys

    of it.

    2.1 Lock moving

    With your fingers touching the "Power" key approximately 3 seconds and removing it until

    hearing "beep" sound at the same time seeing the backlight bright, the keypad is unlocked.

    There is not a symbol for locking. (Keys will be automatically locked without key operation

    about 60 seconds).

    2.2 On/off

    With your finger touching the "Power" key, if the panel is turned on, it will be shut down; if the

    panel is turned off, it will be start work.

    LCD display Touch key

    Unlock, on/ off

    increase, compulsory cooling

    Decrease, Compulsory

    defrosting

    Inquire, parameter setting,

    password setting

    Timer setting, timercancel, time setting

    Locking key displayTimer display,

    clock display

    Water Temperature,

    fault code, parameter

    display

    Output conditions

    Running mode

    Water level

    Brand display

  • 7/30/2019 Manu Installation CCHP17

    7/20

    Product Manual

    6

    2.3 Water tank temperature setting

    With your finger touching"" key, "setting temperature" sign begins to glitter and display the

    water tank setting temperature, and then using the finger touch the "" key, then the water

    tank setting temperature increased.

    With your finger touching the "" key, "setting temperature" sign began to glitter and display

    the setting temperature of the water tank, and touching the ""key, the setting temperature

    decreases. The temperature setting ranges from 20 degrees to 60 degrees (the maximum

    temperature can be set to 99 degrees, and you can acquire more details from the functional

    test table)

    2.4 Timer setting (you can set two time stage to choose the performance of the units)

    With your finger touching the "timer" keyentering the way of timer setting.

    Adjusting the timing of the first stage:

    Adjust timing on "hour", then touch "timer" key again, to adjust the timing on "minute".

    Then touch the "timer" key again, to adjust the timing off "hour", and touch the "timer"

    key again to adjust the timing off "minute".

    Adjusting the timing of the second stage:

    After the first stage timer setting, touch the "timer" key, to enter the second stage of the timer

    setting. Adjust the timing as the ways above.

    Exist the setting after finish all the timer setting. The panel will display the icon of the timer.

    Note:

    1. If only one timer stage needed, setting the first stage timer according to the

    above steps. White for the second stage timer setting, set the same time for timing

    on and off.

    2. If only setting the time in the first stage and not in the second, it will exist setting

    automatically after about 8 seconds.

    3. The timer key in the stage 1 and 2 are timing on/off key. While in the 3 and 4

    stage, the timer key is for water supply pump. If without water supply pump, this

    function is useless. However, during timer on/off setting, must occupy all the 4

    stages but no number request on stage 3 and 4.

    2.5 The timing cancellation

    With your finger touching the "timer" key more than 3 seconds and removing it until hearing

    "beep" sound, then the timer is cancelled.

    2.6 The clock settings

    With your finger touching the "timer" key more than 8 seconds and removing it until hearing "beep"

    sound, you enter the clock setting mode. First, adjusting the "hour"; then touching "timer" button,

    adjusting the "min"; and touching "timer" button again, completing the setting and exiting the

    mode.

  • 7/30/2019 Manu Installation CCHP17

    8/20

    Product Manual

    7

    Note: The clock can be set only in the case of timing setting out.

    2.7Compulsory defrosting

    When the system boots and the press starts, with your fingers touching the "" key more

    than 8 seconds, and removing your finger until hearing "beep" sound, then entering

    defrosting system. The defrosting will exit until the arrival of plate tube temperature or theend of the defrosting time.

    Parameter settings and inquiries

    A: Function Query:

    Under the state of heat pump running (switch on), with your fingers touch the "setting" key,

    the query code by A1 to A9, if it is single-system model, and then finger touch "setting" key to

    exist inquire. If it is dual-system model, and then finger touch "setting" button, the query code

    by b1 to b9, then finger touch "setting" button to exist. Accordingly stated as follows:

    B Function setting

    Under the state of heat pump running (switch on), touch setting button over 3 seconds, when youhear beeping, please remove your hand, the system will enter into setting state. After setting the

    parameters, your finger touching the Function key, enter the next parameter setting, until all the

    parameters having setted.

    Cod

    e

    Meaning( single

    system)

    Meaning( double

    system)Code

    Meaning

    (double system)

    A1 coil pipe temperature coil pipe temperature1 b1 coil pipe temperature2

    A2 Return gas temperature Return gas temperature1 b2Return gas

    temperature2

    A3 Exhaust temperature Exhaust temperature 1 b3 Exhaust temperature 2

    A4Environment

    temperature

    Environment

    temperatureb4

    Environment

    temperature

    A5Outlet water

    temperature

    Outlet water

    temperatureb5

    Outlet water

    temperature

    A6Return water

    temperature

    Return water

    temperatureb6

    Return water

    temperature

    A7 00 00 b7 00

    A8 Compressor current Compressor current 1 b8 Compressor current 2

    A9Expansion valve open

    angle

    Expansion valve open

    angle 1b9

    Expansion valve

    open angle 2

    Cod

    e

    Parameter name Adjustment

    range

    Initial value

    /

    /

    Water tank temperature setting 2060 55

    L1 bias between tank and display temperature 015 0

    L2 bias between compressor start and settemperature

    3

    18

    5

  • 7/30/2019 Manu Installation CCHP17

    9/20

    Product Manual

    8

    C Error code and alarm:

    Code Double system Single system Household unit

    1 Wrong phase Wrong phase

    2 lack of phase lack of phase

    3 water flow switch water flow switch

    4 High Pressure Switch 1 High Pressure Switch High Pressure Switch

    5 Low Pressure Switch 1 Low Pressure Switch Low Pressure Switch

    6 High Pressure Switch 2

    7 Low Pressure Switch 2

    8 Communication Communication Communication

    9 Limit time Limit time Limit time

    10High exhaust

    temperature1

    High exhaust

    temperature

    High exhaust

    temperature

    11High exhaust

    temperature2

    High exhaust

    temperature

    High exhaust

    temperature

    12

    Water tank

    temperature sensor

    broken

    Water tank

    temperature sensor

    broken

    Water tank

    temperature sensor

    broken13 Coil pipe1 temperature Coil pipe1 Coil pipe1

    L3 Set outlet water temperature 3599 55

    L4 Maximal water tank temperature 3099 60

    L5 Environment temperature

    allowing electric heater start

    035 0no electric

    heat

    L6 Return water temperature 3065 45

    L7 Supplement water temperature 2060 20(no

    supplement)

    L8 Compressor current 0-48A 0 (no testing)

    h1 Defrosting cycle 20-99minuter 50min

    h2 Permission temperature for defrosting -151 -3

    h3 Defrosting time 5-20min 8min

    h4 Defrosting quit temperature 140 15

    p1 Electric expansion valve adjust period 20-180 60s

    p2 Difference temperature between A1 and A2 -815 0

    p3 Permission for exhaust temperature protection 70135 92

    p4 Electric expansion valve open

    angel when defrosting

    6-55degree 32

    p5 Minimal electric expansion valve open angel 6-30degree 15

  • 7/30/2019 Manu Installation CCHP17

    10/20

    Product Manual

    9

    sensor broken temperature sensor

    broken

    temperature sensor

    broken

    14Coil pipe2 temperature

    sensor broken

    15

    Exhaust gas

    temperature sensor1

    broken

    Exhaust gas

    temperature sensor

    broken

    Exhaust gas

    temperature sensor

    broken

    16Exhaust gas

    temperature sensor2

    17Environment sensor

    broken

    Environment sensor

    broken

    Environment sensor

    broken

    18Return water sensor

    broken

    Return water sensor

    broken

    19 Input water sensor

    20Water level switch

    broken

    Water level switch

    broken

    21 High input temperature

    22Outlet water sensor1

    broken

    Outlet water sensor1

    broken

    23 Outlet water sensor2broken

    24Return gas sensor1

    broken

    Return gas sensor

    broken

    25Return gas sensor2

    broken

    26Water pressure sensor

    broken

    Water pressure

    sensor broken

    27Low cooling water

    temperature

    Low cooling water

    temperature

    V. Installing Instruction

    Specific installation requirements

    Specific installation requirements

    1. Equipment production base

  • 7/30/2019 Manu Installation CCHP17

    11/20

    Product Manual

    10

    1.1 Concrete foundation

    The base is made of concrete, good at shockproof, specific requirements:

    The surface of concrete base should be solid and smooth, load-bearing of support surface

    should be 2 times of the operation weight of the unit.

    When make concrete base, suggested the following treatment: place on the twisted steel

    which the diameter 9.5 mm, tie up with 10cm spacing and display upper and lower.

    When do concrete base on the concrete floor, the surface must be kept rough before

    construction, after cleaning up and supply enough water before constructing.

    The base station mixed by concrete with ratio of 1:2:4, to be solid, and buried the

    prescriptive size and quantity anchor bolt according the demand. The finished base should be

    kept smoothly.

    Concrete base station surface required waterproof treatment, drains shall be installed

    around and the slope should be larger than 0.5, the slope toward to the drain outlet.

    Concrete must be dry completely before installing the machines.

    In order to enable the device quietly operating, to avoid vibration and noise impact the floor,

    between the concrete base and machine base need be isolated by shockproof pad, and keep

    horizontal.

    To avoid tortility and rupture of the machines because of the displacement by long-running

    of the machine, The unit should take appropriate measures to limit fixed.

    Attention:

    a.) Concrete base's height from the ground should be more than 100mm

    b.) Concrete base's overall height more then 200mm

  • 7/30/2019 Manu Installation CCHP17

    12/20

    Product Manual

    11

    c.) Concrete base must be level, the level is 0.1%

    1.2. Jointing the support frame with channel steal, flange beam and angel iron,

    the support frame and the ground be fixed with screws.

    Note: Load support surface must be strong enough to withstand the load of unit movement,

    and without additional increases vibration and noise, to avoid affecting the surrounding

    environment

    2. Installing Notes:

    The place which is appropriate for installation is flexible, such as balcony, floor, basement and

    so on. In order to run reliably, you must take notes of these points:

    The unit should be installed by specialized personnel, and the installation requires to comply

    with the corresponding regulation of local government and relevant departments.

    Reserve enough space to connect water pipe and wire, consider the room for repair.

    After installation, check whether the unit is fixed well, whether base angle is installed with

    shockproof pad.

    Unit should be installed outdoor in well ventilated place, but also ease of maintenance, the

    distance between shelter at the outlet wind direction and the host ought to be no less than 1.8

    meters. Shown as follow:

    3. Installation system of heat pump water heater unit may be applied in many

    different forms, shown as below

  • 7/30/2019 Manu Installation CCHP17

    13/20

    Product Manual

    12

    water pump

    350mm

    suppling hot water

    hot water backwater

    hot water tank

    complement running watercomplementarywater pump

    water pumpcirculating

    spare electric heating

    supplying pumphot water

    sensor in the pipe

    Heat Pump Unit

    put temperature

    RemarkThe demand of accessories in the datted line depend on the fact of project .

    complementary heater in pipe

    solenpid

    side valve

    filterback-flou blockage valve

    manometerthermometer

    soft connecter

    4. Power of inspection equipment

    4.1 Before installation capacity must be check the power supply, power lines, and electrical

    switch specification to ensure compliance with the requirements of safe operation.

    4.2 Unit power from independent power control switch (with leakage production) connected

    the power department, to ensure power supply unit meet the requirements.

    5. Install water level switch

  • 7/30/2019 Manu Installation CCHP17

    14/20

    Product Manual

    13

    Remarks: the water level switch height can be based on user needs, self-regulation by the

    installer.

    VI. Debugging and Running

    1. The preparatory work before the trial operation

    1.1 Heat pump hot water units inspection

    Check whether the appearance of units or the machine pipeline system is damaged during

    transportation.

    Check whether there is air inside the unit water, if any, should emitting it using the exhaust

    valve in the units or on the pump.

    Check whether the fan blades interfere to the its fixed plate or its protecting network.

    1.2Checking Distribution System

    Check whether the power supply complies with the manual or the unit nameplate required.

    Check whether all the power and control circuits connect absolutely; The wires connects

    correctly according to the diagram; and whether grounding reliably, or all terminals solid.

  • 7/30/2019 Manu Installation CCHP17

    15/20

    Product Manual

    14

    1.3Checking piping system

    Checking whether the piping system, filling pipes, backwater pipes pressure gauge,

    thermograph, valves, level switches and other equipment is installed correctly.

    Checking whether the valves needed opening are open, and those needed closed close.

    Checking whether piping system keeps warm.

    2. Testing running

    Units operation must be professional to operate.

    Conduct an overall testing running, until a comprehensive inspection in entire system

    meeting the requirements,

    Connecting with the power and starting the heat pump, the main machine starts after 3

    minutes later. For the three-phase power supply units, checking whether the fan and the

    pump install correctly.

    Checking whether the unit meets the requirements, if does ,it can be put into normal use

    after running for a time (usually 3 days) after having been put into normal use.

    3. Normal performance

    Heating running processes: power-on----unit water pump running---- water switch

    testing----fan running----compressor running while the low level switch disconnects,

    replenishment solenoid valve turns on.

    Running control

    Water level controlling

    With the low water level switch disconnecting, the supply water solenoid is open and

    complements water, and the pump supplying water stops at the same time; Only with the

    high water level connecting, the pump supplying is open and after 2 minutes, the solenoid for

    complementing water closes.(replenishment open or not for 2 minutes at least).

    The water pump does not supply water, if the high water level disconnect and the water

    temperature in the tank is lower than set temperature (-5)it supplies water , when high

    water level connects after the replenishment valve close 2 minutes and the tank water

  • 7/30/2019 Manu Installation CCHP17

    16/20

    Product Manual

    15

    temperature is higher than set temperature(-2). When the supply pump stops, whatever

    conditions the host is in, the tank must be filled of water. (Replenishment open or not for 2

    minutes at least).

    Circulating pumps, compressors, and fans start to run unless the low water level switch

    connects, when the power is on for the first time.

    With unit running, the circulating pump is open ; While host stopping, it stops running after

    30 seconds later.

    When water supply pump turns on, backwater solenoid works simultaneouslyand inspect

    the backwater temperature 10 minutes later. When the backwater temperature is higher than

    the set temperature of 5, the backwater solenoid will stop. When it is lower than set the

    temperature of 10, the backwater valve is open to keep hot water for a long time in the

    supply water pipe. When water supply pump turns off, backwater solenoid stops working at

    the same time.

    The 4-ways valve is at the state of power-off while running normally, power-on for working

    unless defrosting.

    VII. Maintenance

    The heat pump is a more automatic equipment needing inspection regularly. If the

    maintenance is long-term and effective, the operation reliability and the service life

    will have an unexpected increase.

    1. Clearing the water filter regularly to ensure the pure water and avoiding the damage

    caused by its blocking.

    2. No adjusting any security protection setting on your own, for that has completed before

    leaving the factory.

    3. Always checking whether the power unit and electrical system wiring is solid, and there are

    abnormal movements between electrical components. If does, timely maintenance and

    replacement.

    4. Always checking whether the water supply o f water, the tank valve, liquid level controllers

    and exhaust device are working properly, so as to avoid causing air into the system reduced

    the water cycle to affecting the heat capacity of units and the reliability of its running.

    5. Checking whether the water pump or water valve working properly, water pipeline or pipe

    fittings leaking more often.

    6. Keeping units in the clean, dry and well-ventilated environment, also regular cleaning (1-2

  • 7/30/2019 Manu Installation CCHP17

    17/20

    Product Manual

    16

    months) of side air-heat exchanger for the good effect.

    7. Checking whether the components of units working properly, pneumatic pipe fittings

    existing oil, and refrigerant leaking more often.

    8. No putting odds around units in order to avoid blocking draft exit.

    9. Letting go the water, cutting off the power and setting a good protective cover, if the

    downtime is longer. A comprehensive inspection is necessary to conduct the units again.

    10. Please connecting with the local special maintenance department of our company for the

    repairs in time if you have no ways to the failures.

    11. The condenser cleaning

    Starting the circulating pump of units to clean the condenser for 3 hours by the hot phosphoric

    acid of 50 to 60 , whose concentration is 15%, and finally washing it 3 times with tap

    water. (Pipe installation proposes to set aside 3 interfaces, with the wire plug to seal an

    interface, to prepare to take over cleaning).No using corrosive fluid to clean the condenser.

    12. Clearing the tank after a period of time (typically for two months, according to the local

    water quality) for removing the water scale.

    VIII. Common Faults and debugging

    If there are problems with the units during their performance, please connect with

    the dealer, and the following table can be referred to.

    Fault conditionThe possible cause of the

    malfunctionTreatment measures

    Unit not

    operating

    Power failure

    Unit power cable loose Control Power Fuse Unit

    Disconnect the power

    switch, check the powersupply

    Pinpoint the cause and fix

    Replacement fuse

    Water

    pump

    operation but

    water not

    circulating or

    water pump

    noise Too

    Water systems water Water systems with air

    The end of all water

    system valves to

    open Dirty water filter

    Plugging Large

    Inspection system

    replenishment device, to

    the system replenishment

    Exclude water systems in

    the air water system valve

    open enough to

    Cleaning water filters

  • 7/30/2019 Manu Installation CCHP17

    18/20

  • 7/30/2019 Manu Installation CCHP17

    19/20

    Product Manual

    18

    IX. Warranty services

    1. Warranty certificate: the unit failure during the warranty period, users are required for the

    purchase invoice and warranty card for warranty, and the repair product's number must be

    same with the product number on the warranty card. If no invoice or warranty card, it is

    considered beyond the warranty period. Out of warranty products do not enjoy free

    warranty service, but the company can provide users with paid services.

    2. Damage caused by the following reasons will not be covered under free warranty:

    A. Damage caused in user installation, move and repair.

    B. Damaged caused in user transport, improper storage, or failure to use and maintenance

    according to instructions.

    C. Power supply does not meet the requirements of AC22010%V/50HZ,

    AC38010%V/50HZ, and natural disasters caused the failure

    D. Due to outdoor heat exchanger and water system not clean and irregular cleaning heat

    exchangers, filters, etc.

    E. The filter of cold water fill pipe and host inlet pipe are not installed correctly

    F. Serious beyond the water production capacity of the device, forced to run the machine

    caused the failure

    G. The number of products to repair does not match warranty card Product number.

    H. Warranty card altered

    I. No warranty card and purchase invoicesJ. Products beyond the warranty period

    X. Electrical wiring diagram Single-system electrical wiring diagram

    Water flow is not

    enough

    Check water systems,

    increased water flow

    Suction

    pressure is too

    low

    Dry filter plugging

    solenoid valve to open

    at the end

    Big buck through the

    heat exchanger

    Replace the filter drier

    Repair or replace the

    solenoid valve

    Check thermal expansion

    valve opening degree of

    appropriateness

    Compressor oil

    loss Insufficient lubrication Adding oil

  • 7/30/2019 Manu Installation CCHP17

    20/20

    Product Manual

    19