MUHAMMAD ALI D-33 Shah Faisal Town Malir Halt Karachi, Pakistan Ph(H): 021-34593388Ph(M): 00966546619579Email : Muhammadali162005@yahoo.com
Objective: To join a challenging position in reputed organization where I can utilize my knowledge and efficiency for getting outstanding result for the organization.
Educational Qualification
Bachelor in Electronic Engineering from Pakistan Air Force Karachi Institute of Economic and Technology in Nov, 2008.
Work Experience 3
Organization : Sendan International Co.Ltd KSADepartment : Planning Service DepartmentDesignation : Assistant Instrument Engineer (QA/QC)Tenure : Currently WorkingBrief job Description:
Preparation of inspection Test plan and Procedure for client
Specification.
Coordinating Quality audit and take appropriate corrective and
preventive action for the closing out the NCR and CAR’s.
Monitoring daily Instruments installation and testing activities and
verifying that it complies with the project specification.
Preparing daily documentation of the work progress.
Coordinate with other discipline Quality control inspectors for
ensuring that all other discipline activities that require inspection
within the Instrumentation.
Responsible for the inspection of installation of Instruments,
Conduits and fittings (above and below ground), Cable trays/ladder
racks and Cables, Junction Boxes, Control Panels, Consoles,
wiring termination, impulse tubing as per the project specification.
Responsible for evaluating all Non-Conformities reported (NCR)
within the group, ensuring their correct specification and the
effectiveness of corrective and preventive action implemented.
Responsible to see that the assigned job is timely completed as per
the project schedule.
Responsible to verify the installation of the instruments by
performing inspections as per the Inspection and Test Plan (ITP)
and record the findings on the Quality Record (QR).
Confirming that the Calibration of the instruments match with the
specifications in the Instrument Data Sheet.
Tracking and recording of ‘Request for Inspections’ (RFI’s) and
work progress on site.
Generate NCR and submit to QA/QC Manager for corrective
actions/modifications and incorporating the same in as-built
drawings.
Review and making of RFI, ITP Surveillance reports and
inspection through the RFI and Making the punch list against the
incomplete of job.
Prepare Inspection format, field inspection checklists, Request for
inspection (RFI) and QA / QC Policy to be implemented during
the course of Erection.
Installation cabling, Megger test, termination, loop checking,
functional test of instrument from field to DCS through
marshalling cabinet.
Work Experience 2
Organization : Digitec SystemsDepartment : ProductionDesignation : Production ManagerTenure : 4 YearsBrief job Description:
Monitoring the production processes and adjusting schedules as needed.
Monitoring product standards and implementing quality-control programs.
Ensuring that health and safety guidelines are followed.
Supervising and motivating a team of workers.
Making sure that products are produced on time and are of good quality.
Implementation of 5S to make the production streamline.
Implementation of Kaizen and lean manufacturing.
Always focus on removing non value added steps to reduce the cycle time of each product.
Customer dealing and giving demonstration of different products.
Having a clear understanding of the following products:
S/No Products S/No Products1 Car / Bike Tracking device & LBS 8 DC & AC Power Supply2 RFID Car and Bike security system 9 Guard patrolling system3 GSM Tellular & ATS 10 Panic Switch4 Line Interactive & Online UPS 11 Auto Transfer Switch5 Biometric 12 G-Link Phone6 Car & Bike Wireless Lock 13 Anti-Jammers7 3 & 8 Zone Security Alarm Panel 14 Bike Auto Guard Security System
Work Experience 1
Organization : SalTec PowerlinkDepartment : Quality Assurance DepartmentDesignation : Quality Assurance EngineerTenure : 2 YearsBrief job Description:
Battery Testing (Dry & Wet Batteries) UPS Testing (Line Interactive & Online) Line Conditioner Testing Audit of the Product & Departments on weekly basis. Audit of Tools & Instruments on monthly basis. Final Inspection of the Products as per the quality standards and
procedures. Making of Statistical Reports regarding Product’s faults and take
the corrective & Preventive action Coordinate through vendor by feedback report. Coordinate through R&D and Vendor regarding Product
Improvement. Making of Final Inspection Check list for the Products. Inspection of the Electronics Items and perform the sampling as
per quantity. Making of Testing Procedures for different products. Making of Reports i-e Incident field return report, PCB
modification report, & Rework reports in case of damage / Scratches.
Worked on MRP Software Having a Clear concept about 5S, Kaizen & Lean Manufacturing.
Internship Experience
Organization : PARCO (PAK-ARAB Refinery)Department : SCADA, Safety & Security, Oil Movement, etcDesignation : Internee Student
Tenure : 25th June 07 to 3rd August 07Brief job Description:
Familiarization with Fire Fighting procedures i-e using of fire extinguisher, fire drill, and use of personal protective equipment.
Basic Concept of Electrical & Instrumentation Drawings. Having Clear understanding about the pigging process. Familiar with the SCADA process used for remote monitoring and
automation control system.
Computer Skills
Skills Proficiency levelORCAD V10(PCB designing software ) Very GoodMultisim V9.0(Simulation software) Very GoodLogo Comfort Very GoodMicrosoft Visio GoodMatlab V7.0 GoodMS Project GoodDiptrace 1.4 GoodComputer Aided Drawing (Auto CAD) Good
Activities
Description of Activities YearParticipated in All-inter Karachi Debate Contest in FAST University 2007Participated in Debate Declaration Contest in PAF-KIET 2007Participated in 5th Interuniversity Declamation Contest in PAF-KIET 2006
Professional Development
Workshops/ Seminars YearParticipated in Project Exhibition Fall2007 in PAF-KIET 2007Organizer of the 22nd IEEP Student Seminar in PAF-KIET 2006
Personal Information
Father’s Name : Muhammad SaeedMarital Status : SingleDate of Birth : 18th September 1986C.N.I.C : 42201-0695141-5Religion : IslamLanguage Competency : English, Urdu
Reference
Will be furnished upon request.
top related