engg.muhammad-ali

6
MUHAMMAD ALI D-33 Shah Faisal Town Malir Halt Karachi, Pakistan Ph(H): 021-34593388 Ph(M): 00966546619579 Email : [email protected] Objective: To join a challenging position in reputed organization where I can utilize my knowledge and efficiency for getting outstanding result for the organization. Educational Qualification Bachelor in Electronic Engineering from Pakistan Air Force Karachi Institute of Economic and Technology in Nov, 2008. Work Experience 3 Organization : Sendan International Co.Ltd KSA Department : Planning Service Department Designation : Assistant Instrument Engineer (QA/QC) Tenure : Currently Working Brief job Description: Preparation of inspection Test plan and Procedure for client Specification. Coordinating Quality audit and take appropriate corrective and preventive action for the closing out the NCR and CAR’s. Monitoring daily Instruments installation and testing activities and verifying that it complies with the project specification. Preparing daily documentation of the work progress.

Upload: muhammad-ali

Post on 12-Apr-2017

164 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engg.Muhammad-ali

MUHAMMAD ALI D-33 Shah Faisal Town Malir Halt Karachi, Pakistan Ph(H): 021-34593388Ph(M): 00966546619579Email : [email protected]

Objective: To join a challenging position in reputed organization where I can utilize my knowledge and efficiency for getting outstanding result for the organization.

Educational Qualification

Bachelor in Electronic Engineering from Pakistan Air Force Karachi Institute of Economic and Technology in Nov, 2008.

Work Experience 3

Organization : Sendan International Co.Ltd KSADepartment : Planning Service DepartmentDesignation : Assistant Instrument Engineer (QA/QC)Tenure : Currently WorkingBrief job Description:

Preparation of inspection Test plan and Procedure for client

Specification.

Coordinating Quality audit and take appropriate corrective and

preventive action for the closing out the NCR and CAR’s.

Monitoring daily Instruments installation and testing activities and

verifying that it complies with the project specification.

Preparing daily documentation of the work progress.

Coordinate with other discipline Quality control inspectors for

ensuring that all other discipline activities that require inspection

within the Instrumentation.

Responsible for the inspection of installation of Instruments,

Conduits and fittings (above and below ground), Cable trays/ladder

racks and Cables, Junction Boxes, Control Panels, Consoles,

wiring termination, impulse tubing as per the project specification.

Responsible for evaluating all Non-Conformities reported (NCR)

within the group, ensuring their correct specification and the

effectiveness of corrective and preventive action implemented.

Responsible to see that the assigned job is timely completed as per

the project schedule.

Page 2: Engg.Muhammad-ali

Responsible to verify the installation of the instruments by

performing inspections as per the Inspection and Test Plan (ITP)

and record the findings on the Quality Record (QR).

Confirming that the Calibration of the instruments match with the

specifications in the Instrument Data Sheet.

Tracking and recording of ‘Request for Inspections’ (RFI’s) and

work progress on site.

Generate NCR and submit to QA/QC Manager for corrective

actions/modifications and incorporating the same in as-built

drawings.

Review and making of RFI, ITP Surveillance reports and

inspection through the RFI and Making the punch list against the

incomplete of job.

Prepare Inspection format, field inspection checklists, Request for

inspection (RFI) and QA / QC Policy to be implemented during

the course of Erection.

Installation cabling, Megger test, termination, loop checking,

functional test of instrument from field to DCS through

marshalling cabinet.

Work Experience 2

Organization : Digitec SystemsDepartment : ProductionDesignation : Production ManagerTenure : 4 YearsBrief job Description:

Monitoring the production processes and adjusting schedules as needed.

Monitoring product standards and implementing quality-control programs.

Ensuring that health and safety guidelines are followed.

Supervising and motivating a team of workers.

Making sure that products are produced on time and are of good quality.

Implementation of 5S to make the production streamline.

Implementation of Kaizen and lean manufacturing.

Page 3: Engg.Muhammad-ali

Always focus on removing non value added steps to reduce the cycle time of each product.

Customer dealing and giving demonstration of different products.

Having a clear understanding of the following products:

S/No Products S/No Products1 Car / Bike Tracking device & LBS 8 DC & AC Power Supply2 RFID Car and Bike security system 9 Guard patrolling system3 GSM Tellular & ATS 10 Panic Switch4 Line Interactive & Online UPS 11 Auto Transfer Switch5 Biometric 12 G-Link Phone6 Car & Bike Wireless Lock 13 Anti-Jammers7 3 & 8 Zone Security Alarm Panel 14 Bike Auto Guard Security System

Work Experience 1

Organization : SalTec PowerlinkDepartment : Quality Assurance DepartmentDesignation : Quality Assurance EngineerTenure : 2 YearsBrief job Description:

Battery Testing (Dry & Wet Batteries) UPS Testing (Line Interactive & Online) Line Conditioner Testing Audit of the Product & Departments on weekly basis. Audit of Tools & Instruments on monthly basis. Final Inspection of the Products as per the quality standards and

procedures. Making of Statistical Reports regarding Product’s faults and take

the corrective & Preventive action Coordinate through vendor by feedback report. Coordinate through R&D and Vendor regarding Product

Improvement. Making of Final Inspection Check list for the Products. Inspection of the Electronics Items and perform the sampling as

per quantity. Making of Testing Procedures for different products. Making of Reports i-e Incident field return report, PCB

modification report, & Rework reports in case of damage / Scratches.

Worked on MRP Software Having a Clear concept about 5S, Kaizen & Lean Manufacturing.

Internship Experience

Organization : PARCO (PAK-ARAB Refinery)Department : SCADA, Safety & Security, Oil Movement, etcDesignation : Internee Student

Page 4: Engg.Muhammad-ali

Tenure : 25th June 07 to 3rd August 07Brief job Description:

Familiarization with Fire Fighting procedures i-e using of fire extinguisher, fire drill, and use of personal protective equipment.

Basic Concept of Electrical & Instrumentation Drawings. Having Clear understanding about the pigging process. Familiar with the SCADA process used for remote monitoring and

automation control system.

Computer Skills

Skills Proficiency levelORCAD V10(PCB designing software ) Very GoodMultisim V9.0(Simulation software) Very GoodLogo Comfort Very GoodMicrosoft Visio GoodMatlab V7.0 GoodMS Project GoodDiptrace 1.4 GoodComputer Aided Drawing (Auto CAD) Good

Activities

Description of Activities YearParticipated in All-inter Karachi Debate Contest in FAST University 2007Participated in Debate Declaration Contest in PAF-KIET 2007Participated in 5th Interuniversity Declamation Contest in PAF-KIET 2006

Professional Development

Workshops/ Seminars YearParticipated in Project Exhibition Fall2007 in PAF-KIET 2007Organizer of the 22nd IEEP Student Seminar in PAF-KIET 2006

Personal Information

Father’s Name : Muhammad SaeedMarital Status : SingleDate of Birth : 18th September 1986C.N.I.C : 42201-0695141-5Religion : IslamLanguage Competency : English, Urdu

Reference

Will be furnished upon request.