qestionnairre project
TRANSCRIPT
-
8/8/2019 Qestionnairre Project
1/19
-
8/8/2019 Qestionnairre Project
2/19
4. What qualifications do you hold? (Please mark all that apply)
A-level/City & Guilds MSc in FM
OND/DIPLOMA Other MA/MSc
HND/NVQ MBA
BA/BSc in FM Other BA/BSc/BEng
Master in F. M. MFM
5. Are you a member of any of the following professional bodies? (Please mark all that apply)
NIOB CORBON NSE
COREN NIA NIQS
IFMA IPM NIESV
6. In your view, do you understand Facility Management as the integration of the activities that enables the
physical environment, services and the people to function optimally to support and enhance the core activity
of the organisation?
Yes No Dont know
7. Doyou see FM as having a major contribution towards achieving the overall aims of maintenance of the
sport complex?
Yes No Dont know/unsure
8. If you answered Yes to 7 above, what is the significance of FM to maintenance?
Highly Significant Significant Averagely Significant Low Significance Not Significant
-
8/8/2019 Qestionnairre Project
3/19
MANAGEMENT SECTION:
SECTION 2: THE SPORT COMPLEX RATING USING FIFA MINIMUM BENCHMARKS.
9. PLEASE TICK AS APPROPRIATE AVAILABILITY OF THESE MINIMUM SERVICES REQUIRED BY
FEDERATION INTERNATIONALE DE FOOTBALL ASSOCIATIONS. (FIFA) IN THE SPORT COMPLEXES.
9b. Are funds usually available for overhead cost?
Yes No
9c. if yes to (9b.) how regular are the funds?
Very regular averagely regular fairly regular Low regular Not regular
MINIMUM FIFA BENCHMARKSREQUIRED IN THE SPORTCOMPLEX.
AVAILABILITY
Y
ES
N
O
1.UNSCALEABLE
FENCE(2.5M)
2.SURVEILLANCE CAMERA
3.TURNSTILES AT ENTRANCE
4.ADEQUATE ACCESS
5.SIGNS AND DIRECTIONS
6.OPENABLE FIRE PROOFED
ACCESS GATE7.COMFORTABLE SEATS
8.ROOF STRUCTURES OVER
SEATS
9.FACILITY FOR SEARCHING
AT ENTRANCE
10.SAFE FIELD OF PLAY
FROM SPECTATORS
11.EMERGENCY ACCESS
POINT
12.FIRE PROOFED AND
PRESSURE RESISTANTDOORS
13.EVACUATION ROUTES14.VEHICLE ENTRY POINT TO
FIELD OF PLAY
15.SEPARATE FANS SECTOR
FOR OPPOSING TEAMS.
16.EASY ACCESS TO PUBLIC
CONVINIENCE
17.ADEQUATE SECURITYROOM
18.ADEQUATE PARKING
SPACE
19.FIRST AID CENTRES
20.DETENTION RMS FOR 20
PEOPLES
21.POLICE SECURITY RM.
22.VIDEO CAMERAS WITH ZOOM
FACILITIES CONTROLLED FROM
POLICERM.
23.GIANT SCREEN BOARD
24.PUBLIC ADDRESS SYSTEM
25.INT.TEL.NETWORKS.
26.FIRE HYDRANT/
EXTINGUISHERS PTS.
27BUCKT OF SANDS AND FLAME
RETARDANT GLOVES IN THESTADIA.
28.REGULAR POWER SUPPLY
29.CHIEF SECURITY OFFICER.
30.DEMARCATION OF RESTRICTED
AREA FRM PUBLIC AREA.
31.SECURITY CHECKS AT
ENTRANCE.
32.PROHIBITION OF DRINKING
PUBS.
33. DISPLAY OF DETAIL STADIA
PLAN.
34.DISPLAY OF STADIA CODE OF
CONDUCT.
35. REGULAR WATER FLOW.
36.ADEQUATE STORAGE
37.MEDIA CENTRES.
38.COMFORT.VIP TERRACE
39.HOSPITALITY PARKING FORVIP.
-
8/8/2019 Qestionnairre Project
4/19
MAINTENANCE SECTION:
THE OPERATIONAL STATE OF THE SPORT COMPLEX
10. Please indicate the current level of the functional/physical condition of elements and services within the
sport complex against the SECTION of reference: .
(On a level of 1 to 5. - 5=Very Good, 4= Good, 3=Average, 2= Bad, 1=Very Bad)
BUILDINGELEMENTS/SERVICES IN THE
SPORT COMPLEX.
MAINBOWL
ADMIN.BUILDINGS
GYMNASTIC HALL
OFFICES &SHOPS.
INDOORSPORT
HALLS
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
1.FENCE
2.WALLS
3.CONCRETE STRUCTURES
4.MAIN BOWL
5.PITCH/FIELD
6.TRACKS
7.SEATS
8.ROOF STRUCTURES9.FLOOR SLAB
10.BEAMS/COLUMNS
11.GATES
12.DOORS
13.WINDOWS
14.CEILING
15.PAINTS/FINISHES
(INTERNAL)
16.PAINTS/FINISHES(EXTERNAL)
17.DRAINAGE
18.FLOOR FINISHINGS
19.FURNITURES20.FIXTURES
21.WASTE MANAGEMENT(DISPOSAL)
22.SANITARY
FITTINGS/FIXTURES
23.ELECTRICAL APPLIANCES
24.ELECTRONICS
25.MECHANICAL
APPLIANCES
26.RAILINGS AND
BALUSTERS
27.EQUIPMENTS/APPARATUS
28.POWER SUPPLY
29.VENTILLATION
30.TELECOMMUNICATION
31.SYSTEM
32.SECURITY
33.FIRE PROTECTION
34.LANDSCAPING
35.WATER SUPPLY
36.CAR PARK
-
8/8/2019 Qestionnairre Project
5/19
37.SWIMMING POOL
38.LAWN/GRASS
39.MEDICAL FACILITY
(CLINIC)
40.STORAGE
11. How often do you carry out inspection, repair & replacement on each of these elements / services?KEYS: D=DAILY, W=WEEKLY, M=MONTHLY, Q=QUARTERLY, B=BI-ANNUALLY, A=ANNUALLY)
S/
N
Building Elements/Services in
the Sport complex.
Report Inspection Repair Replacement
D W M Q B A D W M Q B A D W M Q B A D W M Q B A
1 FENCE
2 WALLS
3 CONCRETE STRUCTURES
4 MAIN BOWL
5 PITCH/FIELD
6 TRACKS
7 SEATS
8 ROOF STRUCTURES
9 FLOOR SLAB
10 BEAMS/COLUMNS
11 GATES
12 DOORS
13 WINDOWS
14 CEILING
15 PAINTS/FINISHES(INTERNAL)
16 PAINTS/FINISHES
(EXTERNAL)
17 DRAINAGE
18 FLOOR FINISHINGS
19 FURNITURES
20 FIXTURES
21 WASTE MANAGEMENT
(DISPOSAL)
22 SANITARYFITTINGS/FIXTURES
23 ELECTRICAL APPLIANCES
24 ELECTRONICS
25 MECHANICAL APPLIANCES
26 RAILINGS AND BALUSTERS
27 RATES
28 POWER SUPPLY
29 VENTILLATION
30 TELECOMMUNICATION
SYSTEM
-
8/8/2019 Qestionnairre Project
6/19
31 SECURITY
32 FIRE PROTECTION
33 LANDSCAPING
34 WATER SUPPLY
35 OFFICES/CORPORATE
SUITES
36 SHOPS/KIOSKS37 CAR PARK
38 SWIMMING POOL
39 INDOOR GAMES HALL
40 GYMNASSIUM
41 LAWN/GRASS
42 MEDICAL FACILITY
(CLINIC)
43 STORAGE
12. How often are these facilities maintained?(KEYS: 1= 12 Times a year, 2= 6-11 Times a year, 3= 2-5 Times a year, 4= Once a year, 5= Less than once a year)
S/N Building Elements/Services in
the Sport complex.
1 2 3 4 5
1 FENCE
2 WALLS
3 CONCRETE STRUCTURES
4 MAIN BOWL
5 PITCH/FIELD
6 TRACKS
7 SEATS
8 ROOF STRUCTURES
9 FLOOR SLAB
10 BEAMS/COLUMNS
11 GATES
12 DOORS
13 WINDOWS
14 CEILING
15 PAINTS/FINISHES
(INTERNAL)
16 PAINTS/FINISHES
(EXTERNAL)
17 DRAINAGE
18 FLOOR FINISHINGS
19 FURNITURES
20 FIXTURES21 WASTEMANAGEMENT
(DISPOSAL)
22 SANITARY
FITTINGS/FIXTURES
23 ELECTRICAL APPLIANCES
24 ELECTRONICS
25 MECHANICAL APPLIANCES
26 RAILINGS AND BALUSTERS
-
8/8/2019 Qestionnairre Project
7/19
27 EQUIPMENTS/APPARATUS
28 POWER SUPPLY
29 VENTILLATION
30 TELECOMMUNICATION
SYSTEM
31 SECURITY
32 FIRE PROTECTION33 LANDSCAPING
34 WATER SUPPLY
35 OFFICES/CORPORATE
SUITES
36 SHOPS/KIOSKS
37 CAR PARK
38 SWIMMING POOL
39 INDOOR GAMES HALL
40 GYMNASSIUM
41 LAWN/GRASS
42 MEDICAL FACILITY (CLINIC)
43 STORAGE
-
8/8/2019 Qestionnairre Project
8/19
MAINTENANCE STAFF SECTION:
SECTION 3: THE LEVEL OF EFFECT OF ORGANISATIONALFACTORS THAT AFFECT FM
PERFORMANCE IN THE MAINTENANCE OF FACILITIES IN THE SPORT COMPLEXES.
13. Please rank each of the factors chosen above in the order of their relevance.
(Rank 1 5, 5 = Most effect, 4 = Effect, 3 = Average Effect, 2 = Low Effect 1 = Least effect).
Factors affecting FM Performance in Sport Complexes 1= least 2=low 3=average 4=effect 5=mos
effect
1.Funding
2.Organisational Structure
3.Political Factors
4.Ownership Types
5.Management Structure
6.Labour strength/competence
7.Vandalism
8.Security9.Competence of personnel
10.Users and Public behavior
11.Governments role
12.Resource allocation
13.maintenance level
14.Location
15.Bureaucracy
16.Decision making model
17.Implementation
18.Lack of planned FM model/strategy
19.Corruption
20..Level of Technological advancement
21.Technological development and know-how22.Use of poor quality components and materials
23.Lack of skilled personnel in FM and maintenance departments/org.
24.Complexity of design
25.Unavailability of spare-parts and materials due to inventoryinefficiency
26. Wilful vandalism
27. Delay in effecting repairs
28. Weather action
29. Non Availability of spare parts
30. Management Bureaucracy
31. Theft
32. Arson
33. Mis-use of facilities34. Poor funding
35. Over population of user
36. Non availability of skilful personnel.
37. Non availability of skilful personnel.
38. Inadequacy number of operational staffs
39. Ageing staff
40. Ageing staff
41. Users poor knowledge of facilities handling.
-
8/8/2019 Qestionnairre Project
9/19
SECTION 8: DECISION MAKING PROCESS EFFECT ON PERFORMANCE.
14. What decision making model/process is adopted by the management for the sport complex?Autocracy Horizontal chain of command Bureaucracy Vertical chain of command Democracy
None
15. How does this decision making process relate to the performance of the executing agency in the
maintenance of the sport complex?Very Ineffective performance e ineffective performance average effective performance
Effective performance Very effective performance
16. Who do you report to within your Sport organisation?
Minister/Commissioner for Sport Sport Committee
CEO/MD Property Director
Facilities Director Operational Director
HR Director Don't know/unsure
Finance Director
17. Who represents Facilities Management interests at Board level in your client organisation?
CEO/MD Property Director
Facilities Director Operational Director
HR Director Don't know/unsure
Finance Director
18. Would you say that decision making and implementation in the organisation is fraught with unnecessary
bureaucracy?
Yes No Dont know/unsure
19. Are all the decisions made eventually seen to their fruitful completion?
Yes No Dont know/unsure
SECTION 9: THE MAINTENANCE STRATEGY ADOPTED IN THE MANAGEMENT OF FACILITIES
IN THE SPORT COMPLEXES.
20. What are the maintenance strategies that are adopted in managing the facilities of the Sport Complex?
Planned maintenance Preventive Maintenance Condition Based Maintenance
-
8/8/2019 Qestionnairre Project
10/19
21. What level of importance is there between the maintenance/facility management of the complex and the
core activities
of the Organisation?Very Important Important Neutral Low Importance Not important
22. How does the maintenance strategy adopted relate to the performance of the facilities?Improved performance same performance low performance worse performance
23. What facility management strategy is adopted in the sport complex?Reactive Mgt. Pro-active Mgt. Planned reactive Mgt. None
24. How is the maintenance strategy adopted related to the facility management strategy in use at the
complex?
Very Ineffective performance Ineffective performance average performance
Effective performance Very effective performance
STADIUM CHARACTER
25. Please indicate as appropriate the design and use of the stadia.
Single Purpose Sport Stadium Multi Purpose Stadium Convertible Stadium Complex
25a. Please indicate the type of sport complex
Sport Stadium GamesPark Sports/Gaming Complex
25b. Does the Sport Complex include the following? (Tick all that apply)
Football Pitch Basket Ball Court Lawn tennis Court
Gymnasiums Table Tennis squash Court
Polo Ground Golf Course Swimming pool
Bicycle Velodrome Javelin Pitch Archery range
Volley Ball Court Boxing arena Martial Arts Arena
Rugby Field Base Ball Field Cricket Field
Hand Ball Pitch Hockey pitch Banks
Shops Shopping complexes Restaurants/Fast Foods
Conference/Meeting Halls Offices Car Parks
-
8/8/2019 Qestionnairre Project
11/19
26. What is the approximate Total Gross Floor Area of these properties?
Less than 1,000 sq m 10,001 - 50,000 sq m
1,001 - 5,000 sq m More than 50,000 sq m
5,001 - 10,000 sq m Don't know/unsure
STADIA OWNERSHIP STRUCTURE
27.Who owns the sport complex/facility?5.Facility Managers quality
Federal Govt State Govt Local Govt Corporation Private
29. Government ownership and management of facility is characterised by its political culture. Please rank
the underlisted in likert scale of 1-5 on how they affect performance of facility in your sport complex.
Government ownership factors affecting performance 1=mostleast
affecting
2=least
affecting
3=affecting 4=highly
affecting
5=
af
.Political Culture
1.Governent Policy Making2.Stakeholders consensus on policy
3.Resources
1.Direct allocation
2.partial funding
3.Resource allocation
4.Committment to see policy implemented
5.Co ordination
Government Policy
Government ownership factors affecting performance 1 2 3 4 5
.Political Culture
1.Governent Policy Making
2.Stakeholders consensus on policy
3.Resources
4.Committment to see policy implemented
5.Co ordination
Government Policy
1.Private Participation Programme
2.Government Partial farm lease.
Government Funding
1.Direct allocation
2.partial funding3.Resource allocation
4. Internal Generated Revenue.
5. Budget allocation
6. Sponsorship programmes
7. Stakeholders contribution.
-
8/8/2019 Qestionnairre Project
12/19
1.Private Participation Programme
2.Government Partial farm lease.
Government Funding
4.Internal Generated Revenue.
5. Budget allocation
6. Sponsorship programme
7. Stakeholders contribution
30. How would you rate the performances of your maintenance organisation?Above expectations As expected Below expectations
31. How does your organisation assess or evaluate performance?(Please tick all that applies).
Users satisfaction Benchmarks Post Occupancy Evaluation Key
Performance Index
Balance score card Ranking Statistical Quality Control
Range of Measures Building performance
-
8/8/2019 Qestionnairre Project
13/19
USERS SECTION:
32. PLEASE TICK AS APPROPRIATE AVAILABILITY OF THESE MINIMUM SERVICES REQUIRED BY
FEDERATION INTERNATIONALE DE FOOTBALL ASSOCIATIONS. (FIFA) IN THE SPORT COMPLEXES.
MINIMUM FIFA BENCHMARKS
REQUIRED IN THE SPORTCOMPLEX.
AVAILABILI
TYY
E
S
N
O
1.UNSCALEABLE
FENCE(2.5M)
2.SURVEILLANCE CAMERA
3.TURNSTILES AT ENTRANCE
4.ADEQUATE ACCESS
5.SIGNS AND DIRECTIONS
6.OPENABLE FIRE PROOFED
ACCESS GATE
7.COMFORTABLE SEATS
8.ROOF STRUCTURES OVERSEATS
9.FACILITY FOR SEARCHING
AT ENTRANCE
10.SAFE FIELD OF PLAY
FROM SPECTATORS
11.EMERGENCY ACCESS
POINT
12.FIRE PROOFED AND
PRESSURE RESISTANTDOORS
13.EVACUATION ROUTES
14.VEHICLE ENTRY POINT TO
FIELD OF PLAY15.SEPARATE FANS SECTORFOR OPPOSING TEAMS.
16.EASY ACCESS TO PUBLIC
CONVINIENCE
17.ADEQUATE SECURITY
ROOM
18.ADEQUATE PARKINGSPACE
19.FIRST AID CENTRES
20.DETENTION RMS FOR 20
PEOPLES
21.POLICE SECURITY RM.
22.VIDEO CAMERAS WITH ZOOM
FACILITIES CONTROLLED FROM
POLICERM.
23.GIANT SCREEN BOARD
24.PUBLIC ADDRESS SYSTEM
25.INT.TEL.NETWORKS.
26.FIRE HYDRANT/EXTINGUISHERS PTS.
27BUCKT OF SANDS AND FLAME
RETARDANT GLOVES IN THE
STADIA.
28.REGULAR POWER SUPPLY
29.CHIEF SECURITY OFFICER.
30.DEMARCATION OF RESTRICTEDAREA FRM PUBLIC AREA.
31.SECURITY CHECKS ATENTRANCE.
32.PROHIBITION OF DRINKING
PUBS.
33. DISPLAY OF DETAIL STADIA
PLAN.
34.DISPLAY OF STADIA CODE OF
CONDUCT.
35. REGULAR WATER FLOW.36.ADEQUATE STORAGE
37.MEDIA CENTRES.
38.COMFORT.VIP TERRACE
39.HOSPITALITY PARKING FORVIP.
-
8/8/2019 Qestionnairre Project
14/19
SECTION 6: USERS SATISFACTION OF FACILITIES PERFORMANCE IN THE SPORT
COMPLEXES.
Please rank the underlisted level of happiness in likert scale of 1-5 on how they relate to your
satisfaction on performance of facility in your sport complex.
33. How often do you carry out inspection, repair & replacement on each of these elements / services?KEYS: D=DAILY, W=WEEKLY, M=MONTHLY, Q=QUARTERLY, B=BI-ANNUALLY, A=ANNUALLY)
S/
N
Building Elements/Services in
the Sport complex.
Report Inspection Repair Replacement
D W M Q B A D W M Q B A D W M Q B A D W M Q B A
1 FENCE
2 WALLS
3 CONCRETE STRUCTURES
4 MAIN BOWL
5 PITCH/FIELD
6 TRACKS7 SEATS
8 ROOF STRUCTURES
9 FLOOR SLAB
10 BEAMS/COLUMNS
11 GATES
12 DOORS
13 WINDOWS
14 CEILING
User 1=very
much
unhappy
2=much
unhappy
3=happy 4=highly
happy
5=very
much
happy
1. Happy with works carriedout by operational staff?
2. Frequency of compliant by
user
3. Quality of works done byMTCE staff
4. Users opinion sought on
issue
5. Regularity of users survey
6. Level ofdisturbance/inconvenienceduring repair.
7. Turn Around Time. Time
taken t effect repair.
8. Operational staff attitude to
users of facilities.
9 General condition offacilities (AP: Appearance).
10. Functional condition of
facilities (in use)
11. Surrounding environment
-
8/8/2019 Qestionnairre Project
15/19
15 PAINTS/FINISHES
(INTERNAL)
16 PAINTS/FINISHES
(EXTERNAL)
17 DRAINAGE
18 FLOOR FINISHINGS
19 FURNITURES20 FIXTURES
21 WASTE MANAGEMENT
(DISPOSAL)
22 SANITARY
FITTINGS/FIXTURES
23 ELECTRICAL APPLIANCES
24 ELECTRONICS
25 MECHANICAL APPLIANCES
26 RAILINGS AND BALUSTERS
27 RATES
28 POWER SUPPLY
29 VENTILLATION30 TELECOMMUNICATION
SYSTEM
31 SECURITY
32 FIRE PROTECTION
33 LANDSCAPING
34 WATER SUPPLY
35 OFFICES/CORPORATESUITES
36 SHOPS/KIOSKS
37 CAR PARK
38 SWIMMING POOL
39 INDOOR GAMES HALL
40 GYMNASSIUM41 LAWN/GRASS
42 MEDICAL FACILITY
(CLINIC)
43 STORAGE
34. How often are these facilities maintained?(KEYS: 1= 12 Times a year, 2= 6-11 Times a year, 3= 2-5 Times a year, 4= Once a year, 5= Less than once a year)
S/N Building Elements/Services in
the Sport complex.
1 2 3 4 5
1 FENCE2 WALLS
3 CONCRETE STRUCTURES
4 MAIN BOWL
5 PITCH/FIELD
6 TRACKS
7 SEATS
8 ROOF STRUCTURES
-
8/8/2019 Qestionnairre Project
16/19
34. Does the stadium conform with the minimum benchmark?
Yes No
9 FLOOR SLAB
10 BEAMS/COLUMNS
11 GATES
12 DOORS
13 WINDOWS
14 CEILING
15 PAINTS/FINISHES(INTERNAL)
16 PAINTS/FINISHES
(EXTERNAL)
17 DRAINAGE
18 FLOOR FINISHINGS
19 FURNITURES
20 FIXTURES
21 WASTEMANAGEMENT
(DISPOSAL)
22 SANITARY
FITTINGS/FIXTURES
23 ELECTRICAL APPLIANCES
24 ELECTRONICS25 MECHANICAL APPLIANCES
26 RAILINGS AND BALUSTERS
27 EQUIPMENTS/APPARATUS
28 POWER SUPPLY
29 VENTILLATION
30 TELECOMMUNICATION
SYSTEM
31 SECURITY
32 FIRE PROTECTION
33 LANDSCAPING
34 WATER SUPPLY
35 OFFICES/CORPORATE
SUITES36 SHOPS/KIOSKS
37 CAR PARK
38 SWIMMING POOL
39 INDOOR GAMES HALL
40 GYMNASSIUM
41 LAWN/GRASS
42 MEDICAL FACILITY (CLINIC)
43 STORAGE
-
8/8/2019 Qestionnairre Project
17/19
ASSET UTILIZATION
Please indicate as appropriate the level of facility utilization in the stadia.
KEY: 1 = 10%-20%, 2 = 30%-40%, 3 = 50%-60%, 4 = 70%-80%, 5 = 90%-100%
TIMELINESS IN REPORT RESPONSE:
Please thick as appropriate response on time to complain.
35. How often does the management respond to complain?
Very often (within 24hours) Averagely Often ( Between 1 - 2days)
Fairly often (Between 2 4 days) Low often (Between 4 7 days)No response
36. How often are services effected when reported?
QuickModerateSlow
37. What is the rating of service quality rendered?High Medium Low
S/N Building Elements/Services in
the Sport complex.
1 2 3 4 5
1 WATER SPRINKLERS
2 MOWER3 FLOOD LIGHT
4 PITCH/FIELD
5 TRACKS
6 WATER TREATMENT PLANT
7 GYMNASTIC HALL
8 PLANTS/GENERATOR
9 SCORE BOARD
10 OFFICE BUILDINGS
11 TELECOMMS
12 VEHICLES
13 FURNITURES
14 LAWN TENNIS COURT
15 BASKETBALL COURT
16 BOXING RING
17 CAMERA
18 SWIMMING POOL
-
8/8/2019 Qestionnairre Project
18/19
FINANCIAL PERSPECTIVE SECTION:
SECTION 7. FUND AND BUDGETTING
38. How is your Organisation/Department funded?
Federal Govt State Govt Local Govt Corporate Bodies Private
Internal Revenue generation
39. Are funds regularly available for the operations of the organisations core activities?
Very regular Regular Average Irregular Very irregular
40. How adequate are the funds released to the organization?
Very inadequate Inadequate Average adequate Very adequate
41. Do the organization generate fund internally and use same towards running of the complex?
Yes No
42. What is the percentage contribution of the internally generated revenue to total annual spent on facility
maintenance?
Less than 20% between 20-39% between 40-59% between 60-79%
FACILITY MAINTENANCE BUDGET METHOD IN USE AT THE STADIA COMPLEXES.
43. Please indicate method/basis adopted for preparing the organization maintenance budget.
History based budgeting (past maintenance cost record)
Value based budgeting (flat rates multiplied by % value of building/replacement value.)
Analytical Calculation. (Considering variables like facility age, use and technical installations)
Budgeting by condition description
44. How effective is the budget method adopted?
Very ineffective Ineffective Average effective Effective Very effective
45. Please tick the approximate (% ) percentage of budget disbursed against request.
Less than 10% btw 10-30% btw 30- 50% btw 50-70% btw 70-100%
46. How regular are the budgets IGR (internal generated revenue)?
a) Once a year b) Twice a year c) Quarterly d) Once in Two years
-
8/8/2019 Qestionnairre Project
19/19
e) None of the above
47. what is the rate of increase of the budget allocation?
Less than 10% btw 10-30% btw 30- 50% btw 50-70% btw 70-100%
48. Does the cost of maintenance increase?
Yes No
49. What is the percentage of increase?
Less than 10% btw 10-30% btw 30- 50% btw 50-70% btw 70-100%