    Material handling By PneumaticConveying Systems

    Presented By -Shivam Kumar Gupta (0800110089)

    Avinash Kumar (0800140023)

    Arun Kumar Gupta (0800113027)

    Rahul Saini (080014075)

    Under the Guidance of

    Prof. V.K. Gupta Sir

  • 7/31/2019 projet final 2012.pptx

    2/37

    6/7/12

    Material Handling is the movement,storage, control and protection of materials,

    goods and products throughout the process ofmanufacturing, distribution, consumption anddisposal.

    Material Handling

  • 7/31/2019 projet final 2012.pptx

    3/37

    6/7/12

    Pneumatic conveying is achieved bycreating a pressure differential along a

    pipeline and using the air that moves towardthe area of lower pressure to move bulkmaterial.

    Principle ofPneumatic conveying system

  • 7/31/2019 projet final 2012.pptx

    4/37

    Click to edit Master subtitle style

    6/7/12

    Following step involves in working ofPneumatic Conveying System.1. Air is blow through a air Blower.2. Powder materials stored in a

    Hooper .3. Then Air is go through pipe line to

    Transporter where air is mixedwith powder materials.

    4. Air inlet to Transporter via aValve.5. Then these mixture carried out

    where it is used .

    Working of Pneumatic Conveying

  • 7/31/2019 projet final 2012.pptx

    5/37

    6/7/12

    Feeding positive pressure systems is that the air leakagearising from the adverse pressure gradient can interferewith the flow of the material into the pipeline.

    Moisture contained present in powder material then it maychockthe pipe line.

    Problem with conventional PneumaticConveying System

  • 7/31/2019 projet final 2012.pptx

    6/37

    6/7/12

    The objective of the work was to developthe venturi feeding system to createautomatic suction effect, and to convey

    material further in the stream of air.

    Objective of Project

  • 7/31/2019 projet final 2012.pptx

    7/37

    Click icon to add picture

    6/7/12

    Principal of Venturi Feeder

    Venturi feeder workon the principle of

    reducing the pipelinecross sectional

    area in the regionwhere the material is

    fed from the supplyhopper.

  • 7/31/2019 projet final 2012.pptx

    8/37

    6/7/12

    Centrifugal Blower

    Power Rating

    680WDischarge Rate

    2.8m3/min

    RPM16000rev/min

    Main Components

  • 7/31/2019 projet final 2012.pptx

    9/37

    6/7/12

    Pipe Materials - Mild Steel

    Diameter - 65 mm

    Length - 5 m

    Application - To CarryPowder

    Materials

    Conveying pipes

  • 7/31/2019 projet final 2012.pptx

    10/37

    6/7/12

    There are 3 Throat pipeof Diameter

    20mm

    25 mm30 mm

    Throat

  • 7/31/2019 projet final 2012.pptx

    11/37

    6/7/12

    Differential Manometer

    Capable of measuring pressure Difference betweenconveying pipe to throat.

    Water and Air Mixture is Use.

  • 7/31/2019 projet final 2012.pptx

    12/37

    6/7/12

    Pipe Cutting- Cut the Pipe into many Pieces forthe fabrication of Pneumatic system.

    Steps of Working Procedure

  • 7/31/2019 projet final 2012.pptx

    13/37

    6/7/12

    Threading is done on theLathe Machine

    Threading is use to

    couple venturi to mainconveying line.

    Pitch of thread:- 3mm

    Thread:-V thread

    Threading

    P i f i

  • 7/31/2019 projet final 2012.pptx

    14/37

    6/7/12

    Sheet metal Cutting formanufacturing ofventure's Convergent andDivergent Part.

    Processing of venturi

  • 7/31/2019 projet final 2012.pptx

    15/37

    6/7/12

    Drawingon sheet metal

    Cut Sheet according toDrawing

    Bent Sheet into ConicalShape

    Now weld to formconvergent and divergent

    shape.

    Sheet Metal Development

  • 7/31/2019 projet final 2012.pptx

    16/37

    6/7/12

    Drawing

    Drawing is made by geometrical instrument(pencil , scalecompass , protector)

    1st venturi drawing detail:-

    1. Length of converge part:-55mm

    2. Diameter of throat:-20mm3. Length of throat:-45mm

    4. Length of divergent part:-90 mm

  • 7/31/2019 projet final 2012.pptx

    17/37

    6/7/12

    Continued.

    2nd venturi detail:-

    1. Length of converge part:-90 mm

    2. Length of throat:-85mm

    3. Length of divergent part:-130 mm

    4. Diameter of throat:-25mm

    3rd venturi detail:-

    1. Length of converge part:-45 mm

    2. Length of throat:-85 mm

    3. Length of divergent part:-60 mm

    4. Diameter of throat:-30mm

  • 7/31/2019 projet final 2012.pptx

    18/37

    6/7/12

    The venturi for the pull push type conveying systemdesigned considering general considerations :-

    Convergent cone venturi has a total included angle of211.

    Divergent cone has a total included angle lying between5 to 15.

    Diameter of throat varies from 1/3 to of the pipe

    diameter(Generally times diameter of pipe).After this consideration we use Pythagoras theorem to

    calculate the length of converge part and diverge part.

    How we fix the length of venturipart.

  • 7/31/2019 projet final 2012.pptx

    19/37

    6/7/12

    Drilling on Throat

    Drilling on Throat to makea passage to inlet powdermaterial.

    Another hole for pressuremeasurement byManometer.

  • 7/31/2019 projet final 2012.pptx

    20/37

    6/7/12

    Fabrication of venturi

    Welding :-

    Gas welding used to join converging throat & divergingpart of venturi.

  • 7/31/2019 projet final 2012.pptx

    21/37

    6/7/12

    Final shape of venturi

    Final Shape of Venturifor Suction of RawMaterial

    &Measurement OfPressure by Manometer.

  • 7/31/2019 projet final 2012.pptx

    22/37

    6/7/12

    Fabrication of conveying pipe

    Arc welding is used for joining the pipes

    Mild steel pipe is used for conveying the material.

  • 7/31/2019 projet final 2012.pptx

    23/37

    6/7/12

    Hopper

    No of Hopper -: One

    Shape-: Conical

    Use-: Feed the Powder Material From Hopper to Venturi

  • 7/31/2019 projet final 2012.pptx

    24/37

    6/7/12

    Socket

    No of Socket-: 2

    Material- : Mild steel

    Use- : Made Connection between Venturi & ConveyingPipes

  • 7/31/2019 projet final 2012.pptx

    25/37

    6/7/12

    Valve

    No of Valve-: One

    Use-: Regulate the air flow by Air Blower

  • 7/31/2019 projet final 2012.pptx

    26/37

    6/7/12

    Base

    Air Blower

    Pneumatic Pipes

    Venturi

    Manometer

    it all Placed on the Base Which made of Ply Wood..

  • 7/31/2019 projet final 2012.pptx

    27/37

    6/7/12

    Final assembly of pneumaticconveying system

    All parts of Pneumatic pipes , Venturi joined with thehelp of Valve and Socket .

    final Shape Placed on the Bed..

    R di

  • 7/31/2019 projet final 2012.pptx

    28/37

    6/7/12

    Venturi Bloweropening

    Head atinlet ofsystem(cm)

    Pressureat inlet

    Head atthroat ofsystem(cm)

    Pressureat throat

    System 1 1 57 1.069 12.9 0.974

    3/4 55.1 1.067 15.5 0.993

    1/2 37.5 1.049 33.5 1.000

    System 2 1 61.3 1.073 8.5 0.992

    3/4 55 1.067 15.5 0.998

    1/2 43.2 1.055 27.1 1.005

    System 3 1 53.4 1.065 17.2 0.991

    Reading

  • 7/31/2019 projet final 2012.pptx

    29/37

    6/7/12

    SYSTEM 1

  • 7/31/2019 projet final 2012.pptx

    30/37

    6/7/12

    SYSTEM 2

  • 7/31/2019 projet final 2012.pptx

    31/37

    6/7/12

    SYSTEM 3

  • 7/31/2019 projet final 2012.pptx

    32/37

    6/7/12

    It is clear the graph that suction at the throat sectionincreases with the blower opening.

    According to Graph, maximum suction pressure developfor system 1.

    It is maximum for full opening i.e. at full discharge.

    Comparison of Different VenturiSystem

  • 7/31/2019 projet final 2012.pptx

    33/37

    6/7/12

    The main advantage of pneumatic conveying system isthat material is transferred in close loop, there by

    preventing the environmental effect on the material andvice versa.

    In pneumatic conveying, power consumption is a functionof the system design, transfer rate, and convey length.

    Because compressed air is injected along the conveypipeline, the system automatically adjusts the compressed

    air distribution to break plugs when they occur.

    As there are less moving parts so less wear and tear ascompare to Belt Pulley System.

    Advantage to Other ConveyingSystem

  • 7/31/2019 projet final 2012.pptx

    34/37

    6/7/12

    The applications of pneumatic conveying systems can beseen in many industrial sectors. A list of industrial fieldswhere it has extensively been used is given below

    Chemical process industry

    Pharmaceutical industry

    Mining industry

    Agricultural industry

    Mineral industry

    Food processing industry

    Applications:-

  • 7/31/2019 projet final 2012.pptx

    35/37

    6/7/12

    Apparatus cost:-7000

    1. Blower:-2500

    2. MS pipe:-1000

    3. Base:-1000

    4. Valve:-500

    5. Socket:-500

    . Inspection cost:-1500

    1. Manometer:-1000

    2. Pressure gauge:-500

    . -

    Typical Cost analysis

  • 7/31/2019 projet final 2012.pptx

    36/37

    6/7/12

    The main conlusion of the work was to use venturi-feeding system for the pull push type pneumatic conveyingsystem, thereby developing the suction effect at the venturithroat. This will help to create the automatic suction of the

    material into the system through the inlet provided at thethroat. This system then can be operated by the singleperson and has numerous practical applications for theautomatic transportation of powdered and granular material.

    CONCLUSION