    An Expanded Role of the Rack in theFuture-Proofing of a Data Center

  • 7/28/2019 Bill Santucci

    2/34

    Cyclical nature of the Datacenter industry

    Server Capacities increase (Compute Density)

    Power Demands increase (Power Density)

    Cooling Capacity depleted (Cooling Capacity)

    Each trend has an impact on the needs of the enclosure.

  • 7/28/2019 Bill Santucci

    3/34

    The traditional role of the enclosure:

    Simple Protection for Mounted Equipment

    Security / Restricted Access to Equipment

    Internal Cable Management

    Flood Cooling or Hot / Cold Aisle Deployment

    Overview

  • 7/28/2019 Bill Santucci

    4/34

    Todays role of the Data Center enclosure:

    Intelligent security systems

    Power & real time monitoring

    Cable Management internal & external of Enclosure

    Cooling considerations / designs

    Integral part of the building infrastructure

    Overview

  • 7/28/2019 Bill Santucci

    5/34

    Future-Proofing = Planning

    A unique best practice is to select a single enclosure platform whichwill allow you to utilize a number of accessories and techniques whenand where needed throughout the lifespan of your data center.

    From a traditional low density deployment in a traditional hotaisle/cold aisle to the use of a closed loop water cooled system, thisapproach will allow your data center to grow, as needed without

    removing any equipment (or enclosures) from service during datacenter upgrades.

    The right platform can outlive the data center itself allowing you tofuture-proof your enclosure requirements.

    The enclosure must be an integral part of the Data Center design.It must not be thought of as an accessory to be purchased after theData Center is designed or constructed.

  • 7/28/2019 Bill Santucci

    6/34

    Future-Proofing = Planning Advanced cooling techniques:

    Ducted Cooling, Containment, Enclosure Heat Exchangers,

    Economized Cooling, all need special considerations.

    Flood cooling or Open Hot Aisle / Cold Aisle are costly & inefficient.

    ASHRAE new IT equipment intake Temp. Range

    Allows you to raise your Temp. set point = cost reductions

    only when measures are taken to eliminate recirculation / bypass air flow

    2004 Version 2008 Version

    Low End Temp. 68 F (20 C) 64.4 F (18 C)

    High End Temp. 77 F (25 C) 80.6 F (27 C)

    Low end Moisture 40% RH 41.9 F D.P. (5.5 C)

    High End Moisture 55% RH 60% RH & 59 F D.P. (15 C)

  • 7/28/2019 Bill Santucci

    7/34

    A unique bestpractice is to select asingle enclosureplatform which willallow you to utilize anumber of accessories

    and techniques whenand where neededthroughout the lifespanof your data center.

    Future-Proofing

    Appl ications that are server only the 24 wide enclosure is recommended

    48 Deep enclosures becoming a trend for high density applications with 4 or more PDUs

    Enclosure Size Considerations

  • 7/28/2019 Bill Santucci

    8/34

    Power Considerations: Type of PDU

    Unmonitored Monitored

    IP addressable Remote shutdown Event notification

    Type of power 110 or 220 VAC

    3 phase Most cost effective

    Mounting options Mounting bracket

    Button mount Snap-fit mount

    Physical Space Requirements

    Qty of PDUs Up 4 or more in one rear corner

    Monitored PDU

    Unmonito red PDU

    UniversalMountingBrackets

  • 7/28/2019 Bill Santucci

    9/34

    Grounding protection for your equipment: Isolated vertical copper bus bars to fully ground the equipment Fully ground the enclosure to a common ground

    Grounding the cabinet does not ground the equipment

    Electrically Isolated Mounting

    Enclosure Doors & Panels

    to be Electrically connectedto common ground

    PowerConsiderations:

  • 7/28/2019 Bill Santucci

    10/34

    Cable Management Considerations:Outside the Enclosure:

    The enclosure can eliminate the need for suspended cable troughs

  • 7/28/2019 Bill Santucci

    11/34

    Cable Management Considerations:Outside the Enclosure:

    The enclosure can eliminate the need for suspended cable troughs

  • 7/28/2019 Bill Santucci

    12/34

    Overhead Cable Management

    Enclosures Can Provide Mounting Surfaces :

    Ladder Rack Adapter Brackets

    Overhead Cable Troughs

  • 7/28/2019 Bill Santucci

    13/34

    Cable Management Considerations:Inside the Enclosure

    Vertical Cable Troughs

  • 7/28/2019 Bill Santucci

    14/34

    Cable Management Considerations:Inside the Enclosure

  • 7/28/2019 Bill Santucci

    15/34

    Cooling Considerations

  • 7/28/2019 Bill Santucci

    16/34

    Cooling ConsiderationsHot Aisle / Cold Aisle

  • 7/28/2019 Bill Santucci

    17/34

    Preventing BypassSeal the Gaps, for Conditioned Air

    Sealing access-holes in raised floorMaintains static pressure in raised floor and reduces amount ofparticulate build-up under raised floor

    Filler / Blanking Panels

    prevents re-circulation and by-pass air within the enclosure above &below the equipment

    Brush Grommet KitsPrevents by-pass airflow around the equipment within the enclosureby sealing the rails to the side panels & still have cable access.

    Raised Floor

    Cable Access Grommets

    Tool less Filler Panels

    Brush Grommet Kit

  • 7/28/2019 Bill Santucci

    18/34

    Side to Side airflow

    30 wide enclosure with internal side panels Provides cable management along outside of rails

    Side Airflow Plenum Kit Creates a side intake for equipment Exhausts hot air toward the hot-aisle

    Kit assembly Air dam installed along exhaust rail (top to bottom) Air dam installed along front and rear

    intake side (with a channel in front air intake)

    Air dam constructed of brush grommet provides cable management

    Kit is fully customizable Supports multiple side-to-side airflow

    equipment in the same enclosure.

    intake sideexhaust si de

    Cisco 9500 MDS @ 80o F

  • 7/28/2019 Bill Santucci

    19/34

    Cooling Considerations

    Standard Hot Aisle / Cold Aisle

    Front & Rear Vented Doors

    (Optional fan assisted.)

    63 - 68 F in Cold Aisle

    65 - 72 F at server intake

    90 - 95 F at server exhaust

    Approx: 4 6 Kw. load / enclosure

    Recirculation from exhaust back to theintake causing the CRAC units to be

    less efficient as they have to cool all ofthe white space first.

  • 7/28/2019 Bill Santucci

    20/34

    Standard Cold Aisle / Ducted Exhaust

    Front Vented Door / Solid Rear Door

    (Optional fan assisted)

    63 - 68 F in Cold Aisle

    65 - 72 F at server intake

    90 - 95 F at server exhaust

    Approx: 5 -7 Kw. load / enclosure

    The return air temp is increased whichincreases the CRAC unit efficiency. The whitespace of the room does not get heated from theHot aisle recirculation. Therefore the CRACunit can run at a lower setting (cost savings)and still achieve the same Cold Aisle temps.

    Cooling Considerations

  • 7/28/2019 Bill Santucci

    21/34

    Cooling Considerations

    Plenum Air manager / Ducted Exhaust

    Front Vented Door / Solid Rear Door

    (Optional fan assisted)

    68 - 72 F in white space

    60 - 65 F at server intake

    90 - 95 F at server exhaust

    Approx: 8-12 Kw. load / enclosureThe return air temp is increased whichincreases the CRAC unit efficiency. The whitespace of the room does not get heated fromthe Hot aisle recirculation. Therefore theCRAC unit can run at a lower setting (costsavings) & achieve

    Less perf tiles are required to cool the whitespace only. The intake air is forced through anadjustable Air diverter directly from theCRAC.

    Having an adjustable opening allows the raisedfloor pressure to be maintained throughout theData Center.

  • 7/28/2019 Bill Santucci

    22/34

    kW ratings are dependant upon the Data Center CRAC units in a Passive System

    Localized Optional Rack Fans can be installed for a Active System

    Heat Load Dissapation of the Enclosure within a Data Center is directly Dependant upon the CoolingCapacity of the CRAC units and Method of the Delivery & Return Airflow.

    Cooling Efficiency is related to the separation of the Conditioned Air from the Hot Exhaust by variousmethods based upon the specific Data Center Environment.Also the elimination of Bypass Airflow of the Conditioned air will increase Cooling Efficiency.

  • 7/28/2019 Bill Santucci

    23/34

  • 7/28/2019 Bill Santucci

    24/34

    Cooling Considerations

    Ducted Intake / Ducted Exhaust

    Solid Front Door / Solid Rear Door68 - 72 F in white space

    60 F at server intake

    90 - 95 F at server exhaust

    Approx: 15 plus Kw. load / enclosure

    The return air temp is increased whichincreases the CRAC unit efficiency. The whitespace of the room does not get heated fromthe Hot aisle recirculation. Therefore theCRAC unit can run at a lower setting (costsavings) & achieve

    Even less perf tiles are required to cool thewhite space only. The intake air is completely

    contained and is able to be adjusted at theCRAC unit level.

    This concept can be done on slab floor as well.

    Less CapEX for building.

  • 7/28/2019 Bill Santucci

    25/34

    Cooling Considerations

    A Rear Door Heat Exchanger

    Aftermarket Accessory

    Can be passive or active (with fans)

    REMOVES HEAT ONLY!

    DOES NOT COOL EQUIPMENT!

    This specialty solution only deals with theheat which builds up behind the servers inthe rear of the enclosure.

    These doors are made by a number of coolingcompanies and they act as a heat sinkdispersing heat passing from the rear of theenclosure across the heat exchanger.

    A quantity of cold water passes through thedoor. The heat in the rear of the enclosure istransferred to the water and the closed loopremoves that heat from the enclosure.

  • 7/28/2019 Bill Santucci

    26/34

    Cooling Considerations

    A Rear Door Heat Exchanger

    This concept requires significant cost andinfrastructure improvements, to include asource for chilled water, a coolant distributionunit and all the costs associated with plumbingconnections and installation.

  • 7/28/2019 Bill Santucci

    27/34

    Cooling Considerations

    A Closed Loop Water Cooled

    EnclosureManufactured by a number of companies asa specialty enclosure or an aftermarketaccessory designed for installation instandard product.

    Offers a complete closed loop solution whereheat is extracted from the rear of the enclosure

    via fans and channeled via a plenum to a heartexchanger mounted in the bottom of theenclosure.

    Cold water not only serves as a heat sink butas the fans drive the air across the heatexchanger, it becomes cooled and is thenforced up a plenum chamber in the front of theenclosure to deliver conditioned air to the front

    of the servers and equipment mounted in theenclosure..

    As is the case with the rear door product, thisconcept requires significant cost andinfrastructure improvements, to include asource for chilled water, a coolant distributionunit and all the costs associated with plumbing

    connections and installation.

  • 7/28/2019 Bill Santucci

    28/34

    Cooling ConsiderationsA Closed Loop Water Cooled Enclosure

  • 7/28/2019 Bill Santucci

    29/34

    Cooling ConsiderationsA Closed Loop Water Cooled Enclosure

  • 7/28/2019 Bill Santucci

    30/34

    Cooling Considerations

    Containment

    Many times cooling challengescan not be met by simplyexpanding infrastructure oradding additional CRAC units.

    The strategy behindcontainment is to eithercapture as much conditionedair as possible or to Isolate &

    exhaust as much hot air aspossible within the data centerspace.

    In this concept, the goal is tocreate a contained pool ofconditioned air in the cold aisle.

    The air will fall to the lowest

    point in this contained space,focusing it where it is mostneeded; in front of the mountedequipment.

  • 7/28/2019 Bill Santucci

    31/34

    Cooling ConsiderationsContainment

    In addition to end of aisle doors, there arealso a number of products which offer

    containment across aisles, panels whichmount to the top of the enclosures andcontainment curtains which hang from theceiling.

    It is important to be familiar with theparticular building and fire code standardsbefore completely closing off a grouping of

    enclosures, either for hot or cold aislecontainment

  • 7/28/2019 Bill Santucci

    32/34

    Future-Proofing

    From a traditional low densitydeployment in a traditional hotaisle/cold aisle to the use of airmanagement accessories andchimneys to maximize ambient

    conditions, to a closed loopwater cooled system, thisapproach will allow your datacenter to grow, as neededwithout removing anyequipment (or enclosures) from

    service during data centerupgrades.

  • 7/28/2019 Bill Santucci

    33/34

    Future-Proofing

    The right platform, able toaccept a variety ofaccessories in bothpassive and activeconfigurations, canoutlive the data centeritself allowing you tofuture-proof youroperations.

  • 7/28/2019 Bill Santucci

    34/34

    ProtectPrimary Use Severs or Patching, or both determines size.

    Deeper & wider enclosures accommodate larger servers (84H X 30W X 48D.)

    RMU Vertical space requirements.Platform considerations Ease of Use; rail adjustability, Door & side panelaccess/removal.

    Power

    Enclosure Density as it relates to demand, available power and ready access

    Estimated Power usage; PDU mounting requirements, size.Grounding Locations.

    CableAllow for a growing variety of Cable Management options/techniques.

    CoolDevelop Airflow paths internal & external.

    Achieve Hot & Cold Air separation within the enclosure.Utilize Aisle Containment Options to maximize ambient conditions.Allow for unique applications like Side-to-Side Air Flow equipment.