~4 metrovancouver .,. SERVICES AND SOLUTIONS FOR A LIVABLE REGION
October 20, 2017
Gord Tycho Senior Planner Vancouver Fraser Port Authority 100 The Pointe, 999 Canada Place Vancouver, BC V6C 3T4 VIA EMAIL: Gord.Tycho@portvancouver.com
Dear Mr. Tycho:
Liquid Waste Services
Project Delivery Divisian Tel. 604 436 6924 Fax 604 436 6714
File: CP-18-05-LNG-SU Ref: 22992444
Re: Conveyance for North Shore Wastewater Treatment Plant Project Draft Project and Environmental Permit Application (PER No. 16-164)
The Greater Vancouver Sewage and Drainage District (GVS&DD) is undertaking a secondary treatment upgrade program on the North Shore, as required by Metro Vancouver's Integrated Liquid Waste and Resource Management Plan (ILWRMP) and the new federal Wastewater Systems Effluent Regulations (WSER). The North Shore Wastewater Treatment Plant (NSWWTP, formally known as Lions Gate Secondary Wastewater Treatment Plant) will replace the existing Lions Gate Wastewater Treatment Plant (LGWWTP), which was commissioned in 1961 and provides primary treatment to the 200,000 residents in the North Shore municipalities of West Vancouver, the City of North Vancouver and the District of North Vancouver as well as the Squamish Nation and the Tsleil-Waututh Nation. The NSWWTP Program comprises design and construction of the new secondary wastewater treatment plant, design and construction of interconnection works between the LGWWTP and NSWWTP (the conveyance system), and decommissioning of the existing LGWWTP. The enclosed draft application submission will address the Project Environmental Review (PER) for the elements of the conveyance system on the Fraser Vancouver Port Authority (the port authority) property.
The conveyance system includes the following:
• a new wastewater pump station,
• a new forcemain from the new pump station to the NSWWTP,
• a new effluent pipe from the NSWWTP to the existing LGWWTP outfall,
• an extension of trunk sewer system from the LGWWTP to the new wastewater pump station, and
• various other sewer connections and trunk sewer extensions to facilitate the conveyance of wastewater from the District of North Vancouver and Squamish Nation to the NSWWTP.
The new pump station and sections of the new forcemain, effluent pipe, and trunk sewer are within the port authority jurisdiction.
23581637
4330 Kingsway, Burnaby, BC, Canada VSH 4GB • 604-432-6200 • www.metrovancouver.org
Greater Vancouver Regional District • Greater Vancouver Water District• Greater Vancouver Sewerage and Drainage District • Metro Vancouver Housing Corporat'on
Gord Tycho, Vancouver Fraser Port Authority Conveyance for North Shore Wastewater Treatment Plant Project
Draft Project and Environmental Permit Application (PER No. 16-164) Page 2 of 3
The work will be procured using Design-Build methodology. The GVS&DD will engage in a competitive selection process in order to retain a single entity (Project Co) to design, build, and commission the work. To meet the secondary effluent date of December 31, 2020, the Design-Build schedule is expected to be aggressive. The purpose of the two stage PER application is to reduce the schedule risk required by the application process. The draft PER application will provide the baseline for the project, and Project Co will submit the final PER application prior to construction. The Design-Build procurement has the following schedule milestones:
• issuance of RFQ in June of 2017 - completed
• issuance of RFP in September of 2017 - completed
• award of the RFP in May of 2018
• construction start in summer of 2018
• construction completion in fall of 2020
The following table correlates the checklist requirements from Port Metro Vancouver with the location in this application where the requirement is addressed:
Checklist Description Included in this Location Section Submission
2 General Scope Yes Appendix A
Operations Yes Appendix A
Construction and/or Demolition Yes Appendix A 3 Location Plan Yes Appendix B, Sketch 01
Site Plan Yes Appendix B, Sketch 02
Buildings, Structures and Equipment Yes Appendix B, Sketch 2A
Marine Structures Yes Appendix B, Sketch 03 - 18
Lot Grading and Utilities Yes Appendix B, Sketch 19
Lighting Plan Yes Appendix B, Sketch 20 - 23
Parking and Access Yes Appendix B, Sketch 24 -25
Rail Yes Appendix B, Sketch 21 4 Geotechnical Report Yes Appendix C
Stormwater Pollution Prevention Plan Yes Appendix D
Traffic Impact Study Yes Appendix E
Noise Study Yes Appendix F
Air Assessment Yes Appendix G
Energy Efficiency Study Yes Appendix H
View and Shade Impact Analysis Yes Appendix I Construction Environmental Yes AppendixJ Manae:ement Plan Soil Management Plan Yes Appendix K
Assessment of Effluent Discharge Yes Appendix L
Fire Safety Plan Yes Appendix M
23581637
Gord Tycho, Vancouver Fraser Port Authority Conveyance for North Shore Wastewater Treatment Plant Project
Draft Project and Environmental Permit Application (PER No. 16-164) Page 3 of 3
5 Aboriginal Consultation Requirements Yes
Stakeholder Consultation Requirements Yes
Port Community Liaison Committees Yes
Ora Construction Communications Yes Plan ut a Drawings an Yes Assessment
Phase 1 Environmental Site Assessment Yes
CNR Crossing Application Appendix p
Please do not hesitate to contact me (604-432-6407) or Joan Liu (604-451-6188) if you have any questions or concerns.
J 7 ~ ;?_/ -;::.
t / c. . ~ .. -----
Paul A.J. Dufault, M . .En(, P. Eng., LEED A.P. Project Manager - North Shore Wastewater Treatment plant
PD/MF/JL
Encl: Appendices
23581637
~~ metrovancouver '18" SERVICES AND SOLUTIONS FOR A LIVABLE REGION
October 20, 2017
Gord Tycho Senior Planner Vancouver Fraser Port Authority 100 The Pointe, 999 Canada Place Vancouver, BC VGC 3T4 VIA EMAIL: Gord. Tycho@portvancouver.com
Dear Mr. Tycho:
FILE COPY liquid Waste Services
Project Delivery Division Tel. 604 436 6924 Fax 604 436 6714
File: CP-18-05-LNG-SU Ref: 22992444
Re: Conveyance for North Shore Wastewater Treatment Plant Project Draft Project and Environmental Permit Application (PER No.16-164)
The Greater Vancouver Sewage and Drainage District (GVS&DD) is undertaking a secondary treatment upgrade program on the North Shore, as required by Metro Vancouver's Integrated Liquid Waste and Resource Management Plan (ILWRMP) and the new federal Wastewater Systems Effluent Regulations (WSER). The North Shore Wastewater Treatment Plant (NSWWTP, formally known as Lions Gate Secondary Wastewater Treatment Plant) will replace the existing Lions Gate Wastewater Treatment Plant (LGWWTP), which was commissioned in 1961 and provides primary treatment to the 200,000 residents in the North Shore municipalities of West Vancouver, the City of North Vancouver and the District of North Vancouver as well as the Squamish Nation and the Tsleil-Waututh Nation. The NSWWTP Program comprises design and construction of the new secondary wastewater treatment plant, design and construction of interconnection works between the LGWWTP and NSWWTP (the conveyance system), and decommissioning of the existing LGWWTP. The enclosed draft application submission will address the Project Environmental Review (PER) for the elements of the conveyance system on the Fraser Vancouver Port Authority (the port authority) property.
The conveyance system includes the following:
• a new wastewater pump station,
• a new forcemain from the new pump station to the NSWWTP,
• a new effluent pipe from the NSWWTP to the existing LGWWTP outfall,
• an extension of trunk sewer system from the LGWWTP to the new wastewater pump station, and
• various other sewer connections and trunk sewer extensions to facilitate the conveyance of wastewater from the District of North Vancouver and Squamish Nation to the NSWWTP.
The new pump station and sections of the new forcemain, effluent pipe, and trunk sewer are within the port authority jurisdiction.
23581637 4330 Kingsway, Burnaby, BC, Canada VSH 4GB • 604-432-6200 • www.metrovancouver.org
Greater Vancouver Regional District • Greater Vancouver Water District •Greater Vancouver Sewerage and Drainage District •Metro Vancouver Housing Corporation
Gord Tycho, Vancouver Fraser Port Authority Conveyance for North Shore Wastewater Treatment Plant Project
Draft Project and Environmental Permit Application (PER No. 16-164) Page 2 of 3
The work will be procured using Design-Build methodology. The GVS&DD will engage in a competitive selection process in order to retain a single entity (Project Co) to design, build, and commission the work. To meet the secondary effluent date of December 31, 2020, the Design-Build schedule is expected to be aggressive. The purpose of the two stage PER application is to reduce the schedule risk required by the application process. The draft PER application will provide the baseline for the project, and Project Co will submit the final PER application prior to construction. The Design-Build procurement has the following schedule milestones:
• issuance of RFQ in June of 2017 - completed
• issuance of RFP in September of 2017 - completed
• award of the RFP in May of 2018
• construction start in summer of 2018 • construction completion in fall of 2020
The following table correlates the checklist requirements from Port Metro Vancouver with the location in this application where the requirement is addressed:
Checklist Description Included in this location Section Submission
2 General Scope Yes Appendix A
Operations Yes Appendix A
Construction and/or Demolition Yes Appendix A 3 Location Plan Yes Appendix B, Sketch 01
Site Plan Yes Appendix B, Sketch 02
Buildings, Structures and Equipment Yes Appendix B, Sketch 2A
Marine Structures Yes Appendix B, Sketch 03 - 18
Lot Grading and Utilities Yes Appendix B, Sketch 19
Lighting Plan Yes Appendix B, Sketch 20 - 23
Parking and Access Yes Appendix B, Sketch 24 -25
Rail Yes Appendix B, Sketch 21 4 Geotechnical Report Yes Appendix C
Stormwater Pollution Prevention Plan Yes Appendix D
Traffic Impact Study Yes Appendix E
Noise Study Yes Appendix F
Air Assessment Yes Appendix G
Energy Efficiency Study Yes Appendix H
View and Shade Impact Analysis Yes Appendix I Construction Environmental Yes AppendixJ Mana!!ement Plan Soil Management Plan Yes Appendix K
Assessment of Effluent Discharge Yes Appendix L
Fire Safety Plan Yes Appendix M
23581637
5
Gord Tycho, Vancouver Fraser Port Authority Conveyance for North Shore Wastewater Treatment Plant Project
Draft Project and Environmental Permit Application (PER No. 16-164) Page 3 of 3
Aboriginal Consultation Requirements Yes
Stakeholder Consultation Requirements Yes
Port Community Liaison Committees Yes
Ora Construction Communications Yes Plan ut a Drawings an Yes Assessment
Phase 1 Environmental Site Assessment Yes
CNR Crossing Application Appendix p
Please do not hesitate to contact me (604-432-6407) or Joan Liu (604-451-6188) if you have any questions or concerns .
. .. . . ··--, __ ,,_,.. ... /;? /__,...-/.-::/ __,, .. /
p~:i::::~g~-=--~--~~ ..... ·~=--.,,,::---· Project Manager - North Shore Wastewater Treatment plant
PD/MF/JL