Critical Power & Cooling Services Division - 2008 3
G7K planning Emea-Lam
5/2008
Sales forcetraining Emea
Expert sales training
02/08 7/20086/2008
Opening of quotes : unitary and // modular
Opening of order intake : unitary and
// modular
3/08 4/08
Financial tools dispatched
First deliveries Emea/Lam : unitary
and // modular
8/2008 ........9/2008 3/2009 4/2009
Opening of order intake : // with CSS
First deliveries Emea/Lam
: // with CSS
In April 2009 are also included :
Modular up till 8
Eco-mode
Frequency converter
4
Design
Technological design
Mastered quality
Critical Power & Cooling Services Division - 2008 5
Techological design :
Brand new digital electronics
Integrated electronics, fewer components
Topology derivated from Galaxy 5000
Fixed frequency 5 kHz, 4kHz
Transformerless topology
Output sizing : PF = 0,9
Air cooling with heat pipes
All fan redundancy (at 25°c) and fault detection
Critical Power & Cooling Services Division - 2008 6
Technological design :topology
Neutre
SCHEMA PROXIMA
LEM1
LEM2
LEM3
Vdc_neg
Vdc_pos
+Vbatt
-Vbatt
LN LEM5
Li_Util
CS ond
F6
F5
F4
LE2
C4
C5
C6
TN2
DJ Batt
UT
ILIS
AT
ION
cde CS ond
alim
alim
+15/-15V+ mesure
alim
TI util
Li_F_Ond
RE
SE
AU
2
NEUTRE
CSR2
Li_R2
RCR2
F7
RE
SE
AU
1
Q1
u_res1
F1
F2
F3
Q5N
alim
autoalimCS
Q3BP
Q4S
alim
Filt
res
CE
M
Filt
res
CE
M
Filt
res
CE
M
LE1
u_ctrl_1
K1
K2
C1 C3C2
L1
L2
L3
TI1
TI2
TI3
TI5
TI7
F8
F9
C7
C8
C9
R7
R8
R9
Vi_Ond
comp DC
TI4
TI coup
C2R2
C1
R1
TN1
mise en //
TI6
LS1
LS2
LS3
ImutLEM
LEM6
LEM7
LEM8
LE
M4/
4'
LB1
LB2
Hacheur Batterie
reversiblePFC onduleur
Bras Neutre
Pré-charge
capas DC
Filtrage courant
PFC
Critical Power & Cooling Services Division - 2008 7
Technological design:What is where ?
Power supplies boards
Input and output static switches
Input filters
Control command boards
Charger
IGBT Rectifier
IGBT Inverter
DC Caps
Critical Power & Cooling Services Division - 2008 8
Techological design:Why a transformerless topology ?
Best solution to maximise the triptic : Need of 3% thdi Dc Bus at 800 v no need of output
transformer.
footprint
EfficiencyCosts
Save cost Save footprint Experience with Comet, Galaxy 3000, Galaxy 5000 Up to date topology
Is it the only topology without transformer ?
Critical Power & Cooling Services Division - 2008 9
Techological design:Transformer less issue
450 v230 v
400 v
Voltage elevator
Choke for smoothing
Sinus
Supressing H3 and H5 (triangle/zigzag)
Galvanic isolation between M1 input
and output
G6K The truth about G6K output transformer
No use : DC voltage is 800
v
Still exists
Higher IGBT ratings (cheaper
and cheaper)
Have to add one transformer at the
output
Galaxy 7000
Critical Power & Cooling Services Division - 2008 10
Low frequency disturbances : Lightning :over voltage
Transformer will lower the impact of over
voltage.
PWGalaxy 5000
In input EMC filter:capacitor Phase earth
+common mode choke lower the
impact of over voltage
High frequency disturbances : « arcing »
The inverter transformer will play no role and will transmit all
disturbances EMC filter includes device for better
protection
Phenomenoms
Techological design:Transformer less issue : at the input level
Critical Power & Cooling Services Division - 2008 11
DC voltage at the output of the UPS caused by a problem of electronic
regulation
Transformer can suppy up till 5 %
PWGalaxy 5000
DC current at the output of the UPS (power supply with
only one diode)
Electronic regulates to have no DC voltage.
If electronic trouble, inverter transformer is saturated, the inverter is overloaded and transfer to by-pass
G5K can supply up till 10% of DC Current
Electronic regulates to have no DC voltage.
If electronic trouble, control loop orders a transfer to by-pass
UPS inverter fault between phase or on DC Bus
Only electronic regulation can guaranty the non
transmission to the load
Only electronic regulation can guaranty the non
transmission to the load
Phenomenoms
Techological design:Transformer less issue : at the UPS level
Critical Power & Cooling Services Division - 2008 12
Short circuit capacities
PWGalaxy 5000
Short circuit is divided upon 2 legs at the primary of the transformer
IGBT are bigger and able to provide excellent results
Check tableCheck table
Transformer can be used to adapt the output voltage
Electronics can sets up precisely
Electronics can set from -3 to +3% the output voltage
Transfo with Delta Y widings suppresses these
harmonics : smaller inverter IGBT ratings
Higher IGBT ratings
Harmonics coming from the load, mainly H3
Phenomenoms and beliefs
Techological design:Transformer less issue : at the output level
13
Galaxy 7000 Characteristics
Mechanical Electrical Communication Architectures
Critical Power & Cooling Services Division - 2008 14
Mechanical characteristics:
1400 mm
1900 mm
1800 mm1800 mm
712 1 012 1 412400
UPS
Empty battery cabinets&
Auxiliary cabinets
I P
2
0
250 – 300 – 400 kVA 500 kVA
Critical Power & Cooling Services Division - 2008 15
Mechanical characteristics:
1 012 1 412
Centralised Static switches
External maintenance by-passI
P
2 0
1800 mm1800 mm 1800 mm1800 mm 1800 mm1800 mm1 012 1 412 2 424
800 kVA 1 200 kVA 2 000 kVA
800 kVA 1 200 – 2000 kVA
Critical Power & Cooling Services Division - 2008 16
Mechanical characteristics:centralised static switch
800 kVA
1 200 kVA 2000 kVA
1 012 mm
1 412 mm
Critical Power & Cooling Services Division - 2008 17
Mechanical characteristics:Easy to install and connect
Back to the wall : footprint savings
490 mm : large distance to bend cables
Connecting switches in the same place than all the other 3 phases UPS
Long solid terminal blocks: easy connection
Ready for TNC, TNS, TT, IT : same product, just connect differently the neutral.
> 1000 mm
18
Galaxy 7000 Characteristics
Mechanical Electrical Communication Architectures
Critical Power & Cooling Services Division - 2008 19
Electrical performances:Input AC Normal
No need of neutral at the input : no need of extra transformer
Safety of connection
shortage up till 3 ms without going to battery thanks to capacitors sizing
3 phases 250v / 470v 45 to 65 Hz Phase rotation detection
3 phases 250v / 470v 45 to 65 Hz Phase rotation detection
Zone Back-feed
250 V 380 V 470 V
Voltage AC Normal
70%
100%
Nominal power
Advantages
Critical Power & Cooling Services Division - 2008 20
Electrical performances :IGBT rectifier
No disturbance of upstream electrical network
Lower rating for cables breakers
Fully compliant with genset
THDI < 5 % (with Thdv between 3 to 4%) Power factor > 0,99
THDI < 5 % (with Thdv between 3 to 4%) Power factor > 0,99
Thdi (%)
Load level
Advantages
25% 50% 75% 100%
5%
6%
8%
11%
Critical Power & Cooling Services Division - 2008 21
Electrical performances :IGBT rectifier
No Genset overloads whatever the sequence
When running on Genset : Customisable maximum current customisable max bat. recharging current* Soft start (customisable time for ramp-up)* Sequential re-start
When running on Genset : Customisable maximum current customisable max bat. recharging current* Soft start (customisable time for ramp-up)* Sequential re-start
Advantagestemps
courant
I PFCI batterie
PFC nominal current ramp duration
PF
C a
llow
ed c
urre
nt s
tep
Transfert Batterie à Réseau AC NormalTransfer from battery to MainsCurrent
Time
temps
courant
I PFC
I hacheur batterie
PFC nominal current ramp duration
PF
C a
llow
ed c
urre
nt s
tep
Impact de chargeLoad step
I battery chopper
Current
Time
Critical Power & Cooling Services Division - 2008 22
Electrical performances :Charger
Availability Easy to manage Increase battery life expectancy
Advantages
Floating Automatic test, manual test, Autonometer Recharging voltage according to
temperature Independant electronic for Monitoring and
regulation (NF C58-311) Input on relay card to stop the charger if
battery room ventilation fault (NFC15-100) Management of 2 CB to control the
charger DC Ripple voltage <1%
Critical Power & Cooling Services Division - 2008 23
Electrical performances:batteries
Flexibility N° of blocks Back-up times : up till 8 hours
Availability Fast recharging
Sealed, vented lead-acid, Ni-cad
From 44 to 48 blocs
Floating voltage : from 600 to 654 v
Circuit breaker protection to avoid deep discharge
AdvantagesEx. pour Cos phi charge = 0.9 Durée de la recharge (0.1C10)
Temps d’autonomie 5min 10min 15min 20min 30min 250kVA 4h 6h 6h 7h 8h 300kVA 4h 5h 7h 7h 8h 400kVA 4h 6h 7h 6h 9h 500kVA 4h 6h 7h 7h 9h
Ex. pour Cos phi charge = 0.9 Durée de la recharge rapide (0.3C10)
Temps d’autonomie 5min 10min 15min 20min 30min 250kVA 2h 3h 3h 3h 4h 300kVA 2h 2h 3h 3h 4h 400kVA 2h 3h 3h 3h 4h 500kVA 2h 3h 3h 3h 4h
Re-charging time
Boosted re-charging time
Autonomy
Autonomy
Ex. for 0,9 load Cos phi
Ex. for 0,9 load Cos phi
Critical Power & Cooling Services Division - 2008 24
Electrical performances :Power according to temperature
Improvement due to digital electronic
Automatic adjustment
More power, more overloads
Nominal load level %
T°c20° 25°c 30°c 35°c
100
%
10
2,5
105
1
07,5
500 kVA400 kVA300 kVA250 kVA
513 kVA410 kVA308 kVA256 kVA
525 kVA420 kVA315 kVA263 kVA
538 kVA430 kVA323 kVA269 kVA
Critical Power & Cooling Services Division - 2008 25
Electrical performances:output
Quality of energy flexibility
all type of loads set the precise voltage for long
lengths of cables
380-400-415-440v set-up at +-3% 50 ou 60 Hz +/-0,001Hz (auto regulation) Regulation : static : +/-1% on load impact : +/-2% (100ms) THDU< 2% (linear loads) THDU < 3% (non linear loads)
Constant active power up till 0,9 leading PF , at 25°c.
380-400-415-440v set-up at +-3% 50 ou 60 Hz +/-0,001Hz (auto regulation) Regulation : static : +/-1% on load impact : +/-2% (100ms) THDU< 2% (linear loads) THDU < 3% (non linear loads)
Constant active power up till 0,9 leading PF , at 25°c.
Advantages
Critical Power & Cooling Services Division - 2008 26
1,00
1,10
1,20
1,30
1,40
1,50
1,60
1,70
1,80
1,90
2,00
0,1 1 10 100 1000 10000 100000
Time in S
20°C 30°C 35°C 40°C
Electrical performances :output : overloads
Thermal overload 150% for 1minute125% for 10 minutes
Operating at 35° permanently
Thermal overload 150% for 1minute125% for 10 minutes
Operating at 35° permanently
1.25 In / 10min
1.5 In / 30sec
Critical Power & Cooling Services Division - 2008 27
Electrical performances:output: short circuit capacities
Short circuit capacities Valid for 150 ms
Short circuit capacities Valid for 150 ms
Check what breaker it can trip
250kVA 300kVA 400kVA 500kVA Fc sous 380V 2.86 2.38 2.38 2.6 Fc sous 400V 3 2.51 2.51 2.74 Fc sous 415V 3.12 2.60 2.60 2.84
Advantages
Helps discrimination Energy availability
Critical Power & Cooling Services Division - 2008 28
Electrical performances:High efficiency (120 kVA)
Efficiency (%)
Load level 25% 50% 75% 100%
92
9
3
94
95
92,2
93,6
94,3
94
94,5
94 94,293,7
250-300 kVA
400-500 kVA
Advantages
Contributes to lower the TCO Allows to reduce sizing of air
conditioning or ventilation of the UPS room
29
Galaxy 7000 Characteristics
Mechanical Electrical Communication Architectures
Critical Power & Cooling Services Division - 2008 30
Local Communication:comfort & safety for the right decisions
High resolution : 1/4 VGA (320x240) Intuitive menus 2500 events time stamping Step by step help for manipulations On/Off button operational even if
comunication board is faulty.
3 levels of information
General, by Led:
Mimic diagram for operational status:
Detail by the large display
Main menubutton
Help button
Critical Power & Cooling Services Division - 2008 31
Local Communication:Qualitative information for good management
Choose the welcoming screen Alarm when going over a
customisable load level Manage the statistics :
Average load level Number of overloads Number of switch to batteries Time spent on batteries Number of switch to by-pass Time spent on by-pass
Manage a parallel configuration Total output measures Measures of any UPS in the
configuration from any UPS
Specific alarms to connect with bloc by bloc battery monitoring
Individual Life cycle monitoring for DC and AC capacitors, fans, batteries
Update with statistics menus in the user manual
Critical Power & Cooling Services Division - 2008 32
Remote communication:Hot plug hardware
Industrial Network Mangement card: (option)
ETHERNET 10/100BT + JBUS/RS485/RS232
Supervise through web browser Interface with SNMP supervision Instructions for shutdown Notify alarms through e-mail Interface with Environement
sensor for T° and Humidity monitoring
Feed a BMS
Network Mangement card (option):
ETHERNET 10/100BT + BUS/RS485/RS232+ Modem
Supervise through web browser Interface with SNMP supervision Instructions for shutdown Notify alarms through e-mail Interface with Environement
sensor OR feed a BMS Modem for remote Telservice
Should be replace at the end of 2009 by common Platform exAPC &MGE
66069 :standardAlarm relay card
Critical Power & Cooling Services Division - 2008 33
Remote communication:Softwares
Critical Power & Cooling Services Division - 2008 34
EPM v.2: all the EPM v.1 features and more:
3-Phase systems details embedded in EPM + log of 3-ph. data
Support of « UPS multi-modules configur. and high availability UPS architectures » with « power flow views »:
- hot-standby redundancy- modular parallel - parallel with centralised bypass- parallel with STS … etc.
Additional views and graphical tools:- automatic map view- building view…
Available Q1’06
Remote communication:EPM Software EPM v.1:
Critical Power & Cooling Services Division - 2008 35
Communication performancesRemote : UPS general power off
Shuts UPS down shuts mains 2 static switch off
(customisable on or off) Shuts PFC off shuts charger off opens baterry Circuit breaker
Compliant with the UPS standard Compliant with sensitive application
recommandation (hospitals)
Advantages
36
Galaxy 7000 Characteristics
Mechanical Electrical Communication Architectures
Critical Power & Cooling Services Division - 2008 37
Architectures and running modesUnitary versions
Unitary Frequency converterUnitary Eco Mode
Not running in parallel mode
Hot Standby
Running in parallel mode
Critical Power & Cooling Services Division - 2008 38
Architectures and running modeParallel versions : up till 8 units
Modular parallelling Power extension
Critical Power & Cooling Services Division - 2008 39
Architectures and running modeWith Upsilon STS
40
Galaxy 7000 Catalogue
Critical Power & Cooling Services Division - 2008 41
The options
Available today, batch 1 Backfeed mains1 and 2, M1 & M2 common Communication boards Isolation transformers External by-Pass cubicles :
– 800 kVA
– 1200 kVA
– 2000 kVA Battery circuit breaker kit : IP32 Top entry
Available in april 2006, batch 2
Battery coupling pre-equiped battery blocs for
battery monitoring
Critical Power & Cooling Services Division - 2008 42
Standards and certifications
Normes
Construction et sécurité CEI 62040 1-2 / CEI 60950
Performances et topologie CEI 62040-3 / EN 62040-3
CEM immunité CEI 61000-4-2 / EN 62040-2 niveau 4 (décharges électrostatiques : 15 KV air, 8 kV contact)CEI 61000-4-3 / EN 62040-3 niveau 3 (champs électro magnétiques rayonnés : 10 V/m)CEI 61000-4-4 / EN 62040-2 niveau 4 (transitoires rapides : 4 kV sur câbles secteur)CEI 61000-4-5 / EN 62040-2 niveau 4 (onde de choc forte énergie : 2 kV couplage entre lignesCEI 61000-4-6 / EN 62040-2 niveau 3 (immunité conduite : 10 Veff sur câbles secteur)CEI 61000-4-8 / EN 55024 niveau 4 (immunité rayonnée : 30 A/m)
CEM émission CEI 62040-2 : C3 distribution contrôlée en standard / C2 classe A en option
Harmoniques CEI 61003-2 / CEI 61003-4
Conception fabrication ISO 14001 / ISO 9001
Certification et marquage CE / LCIE