The history of White House Company participation in the oil and gas industry dates back to
year 1988 it was working by several sister companies: Quantum Technologies, IES, and Diali
Company. In 2013, the owners of these companies established a new specialized company in the
sectors of oil and gas under the name of White House.
قبل من لعمت تكانحيث م1988 عام الى والغاز النفط قطاع في األبيض الدار شركة نشأة تاريخ يعود
معا فيلكن . ديالي وشركة ،Quantum Technologies، IES: لها مثل الشقيقة الشركات من العديد
شركة مسمى تحت والغاز النفط قطاعات في متخصصة جديدة شركة الشركات هذه أصحاب أنشأ ،2013
.الدار البيضاء للتجارة و التعاقدات
Since White House has founded been with its sister companies, a league of a highly qualified
engineers have involved in number of projects, which lay in different fields of industry ranging
from rehabilitation or replacement of a control system in small production factories and power
plants, supplying specialized equipments and projects for the refineries, processing all project
phases planning, procurement, design, erection and commissioning. Client’s goals of economy
and quality can be achieved through adopting the most modern equipments and engineering
techniques in all phases of project execution.
مجموعة كبيرة من و تسخير تم توظيف ،لها الشقيقة الشركات مع اءبيضال شركة الدار أن وجدت منذ
أو تأهيل إعادة من بدءا مختلفة ةيصناع مجاالت المشاريع في من عدد في عاليا تأهيال المؤهلين المهندسين
تجهيز المعدات و المشاريع الطاقة، توليد ومحطات الصغيرة االنتاج مصانع في التحكم ةنظامأ استبدال
تركيبال تصميم،ال ،و التوريد التخطيط، مثل: عيراالمشتلك مراحل جميع تجهيزكذلك و الخاصة بالمصافي،
-
Page 3 of 69
على إستخدام عتمادباإل والجودة خالل الوفر اإلقتصادي من المستخدم النهائي أهداف تحقيق ويمكن. لهندسةوا
.المشروع تنفيذ مراحل جميع في الهندسية والتقنيات الحديثة المعدات
White House evolved from an engineering services company to an integrated solution
provider. White House is capable of handling all parts of the job required by clients, starting
from review, solution development, planning, budgeting study, procurement, supervision,
erection (civil, mechanical, and electrical), testing, commissioning, and maintenance.
الدار شركة. المتكاملة حلولال لتوفير هندسية خدمات اتشرك خالل من اءالبيض شركة الدار طورتت
وتطوير عةمراج من بدءا ،المستخدم النهائي يطلبها التي لاعماأل جميع مع التعامل على قادرة اءالبيض
المدنية مثل األعمال) بيصأعمال التنو واإلشراف، والمشتريات، الميزانية، ودراسة التخطيط، ،الحلول
.والصيانة ،الهندسة ،فحصو ال واالختبار ،(والكهربائية والميكانيكية،
Our mainly services including a professional technical support is given for making huge
projects for plant oil. White House has many engineers and technicians to work for the technical
construction, which will help our customer to customize systems to create the optimal solution
for precise needs of our customers. White House has success to cooperate with Iraqi ministries
and governmental companies to win many tenders in Iraq.
في قطاع مةضخ مشاريع لتنفيذ المهنية نيالتق الدعم خدمات من الخدمات الرئيسية التي نقدمها تتضمن
والتي ،التقنية لمشاريعا بناء أجل من للعمل والفنيين المهندسين من العديد الديه اءبيضال الدار. يةلنفطالحقول ا
الدار. ءالعملل الدقيقة االحتياجات لتلبية ىالمثل ولالحل لخلق أنظمتهم تخصيصفي العمالء تساعد سوف
كسبو ةالعراقي الحكومية والشركات الوزارات مع التعاون في النجاحعديد من قصص ديها الل اءبيضال
.العراق في المناقصات من العديد
-
Page 4 of 69
White House mission is to be classified as the number one trading company in the Iraq
market. It is our objective to lead our company to a new horizon on an international level that
goes along with our willingness and strong desire of our management to obtain such high
ranking in the business world. The company will be able to achieve its mission via the leverage
over its business relationships and stakeholders' satisfaction.
سوقال يف واحد رقم تجارية شركةال أنها على تصنف أن هولشركة الدار البيضاء الرسالة األساسية
و رغبتنا مع بجن إلى جنبا يسير الدولي المستوى على جديد أفق إلى شركتنا لقيادة هدفنا هو ذلك. يالعراق
قادرة ستكون شركةال فإنلذلك . الاألعم عالم في العالية المرتبة هذه على للحصول إدارتنا من قويةال رغبةال
المصلحة أصحاب رضاالوصول إلى و قوية تجارية عالقات بناء على القدرة خالل من رسالتها تحقيق على
.و العمالء
MMiissssiioonn SSttaatteemmeenntt
Developing a modern industry can be obtained according to latest international engineering
standards by incorporating latest innovative and economical technologies in industry and by
utilizing a modern foreign expertise to escalate local expertise proficiency and knowledge base.
دمج اللخ منو ليةالدو الهندسية المعايير ألحدث وفقا عليه الحصول يمكن الحديثة الصناعة تطويرإن
لرفع و تأهيل ةالحديث األجنبية الخبرات من واالستفادة الصناعة في قتصاديةاأل و المبتكرة التقنيات أحدث
.همرفامع و زيادة المحلية الخبرات و الكفاءة
-
Page 5 of 69
HHiissttoorryy
The White House Co. has been founded by league of engineers with high graduation degrees
in electronic, automation and industrial computing systems, enriched with a long experience in
designing, developing, and maintaining automatic control systems in different Iraqi factories,
industrial planets, power production planets and power transmission networks.
ي ف عاليةفنية درجة الذين هم على المهندسين منمن قبل مجموعة تأسس شركة الدار البيضاء
اء تلك و زاد ثر الصناعية، الحوسبة وأنظمة والميكانيكية إللكترونيةتخصصات مختلفة مثل الهندسة ا
المختلفة ةقيالعرا المصانع في اآللي التحكم أنظمة وصيانة وتطوير تصميم في طويلةال خبرةالتخصصات ال
.الكهربائية الطاقة نقل وشبكات الطاقة إنتاجحقول و الصناعية الحقول
White House has executed since 1988 number of projects ranges from small and medium
subcontracts with other large contracting companies to large projects which involve more than
90 projects.
إلى متوسطةوال الصغيرة المشاريع من تتراوح المشاريع من عددا 1988 عام منذ شركة الدار البيضاء نفذت
.مشروعا 90 من أكثر يزيد عددها إلى التي الكبيرة المشاريع
-
Page 6 of 69
GGeenneerraall SSuuppppllyy LLiinneess && CCoovveerreedd IInndduussttrriieess::
The company is mainly dealing with supplying, importing and distributing of various
kinds of products in oil and gas sector as well of power generators products from USA, Europe,
Asia, Middle East, and Far East. Now days, we are one of the leading suppliers to Iraq in the
following sectors:
وكذلك والغاز النفط قطاع في المنتجات من مختلفة أنواع وتوزيع واستيراد توريد في أساسا تهتم الشركة
. األقصى لشرقوا األوسط، والشرق وآسيا وأوروبا األمريكية المتحدة الواليات من المنتجات الطاقة مولدات
:ةالتالي القطاعات في لعراقإلى ا الموردين كبار من واحد نعد نحن يام،األ هذه
• Petrochemical.
• Oil & Gas Production & Processing.
• Manufacturing
• Minerals & Fertilizers.
• Products for quality laboratories.
• Field and control room Instrumentations.
• DCS, PLC, SCADA & Field bus Control systems.
• Electrical and Instrumentation laboratories and Hand held Instruments.
• Chemical Quality laboratories instruments.
-
Page 7 of 69
PPrroojjeeccttss ((IIEESS))
Our main activities are to sell the products & services of manufacturers, suppliers and
service organizations in Iraq on commission basis. Governments / semi-government
organizations and industries float international tenders from time to time for import of products
& services and we participate in such tenders on behalf of our manufacturers, suppliers and
service organizations. Our capabilities include:
في خدميةال اتالشركو ةوالمورد المصنعة الشركات من والخدمات المنتجات بيع هي الرئيسية أنشطتنا
خاصةخارجية الال المناقصاتب آلخر وقت منحيث نقوم بالمشاركة . العمولة بإستخدام سياسة العراق
هذه ثلم في نشارك ، حيثوالخدمات المنتجات الستيرادالعراقية الحكومية شبه/ الحكوماتالشركات ب
:ما يلي قدراتنا شملوت. الخدمية والمنظمات الشركات المنتجة و المصنعة باسم المناقصات
Crude Oil Booster Pumps
Chemical injection system
Power distribution panels & junction boxes
Control cables
-
Page 8 of 69
Instruments and accessories
Hot Oil Unit for the Oil Plant Control and Refinery Systems.
Drilling Machinery: Drilling Rig Components; Drill String and Accessories; Power
system and control.
Pipelines: Casing and Tubing; Line Pipes; Drill pipes.
Wellhead Equipments: Well head and Tubing head; Wellhead and X-mas Trees; Sucker
Rod.
Solid Control System: Shakers, Centrifugal Pumps and etc.
Well Control System: BOP, Manifold, Valves & BOP Control System and etc.
Complete Safety Equipments
TrigridMax Dehydrator/Desalter Package
Supply of Control Systems based on DCS, PLC, and SCADA.
• Supply of Emergency Shutdown Systems.
-
Page 9 of 69
• Supply of Supervisory and Plant Information Systems.
• Specification of pneumatic instrumentation, electronic analogue and digital
instrumentation, process computers and distributed control systems.
•Corrective, preventive, predictive, proactive maintenance of automation systems to ensure
production continuity.
• Power Plant Optimization
• Control System Upgrades
Integrated PLC, DCS, and HMI Control Systems
• Comprehensive Instrumentation, Controls and Electrical Designs
• Integrated PLC, DCS, and HMI Control Systems
• Project Development
• Operations Manuals
• Operating Training
-
Page 10 of 69
Main Reference List: The list below shows some projects and clients that we have developed
many projects with them (Diali Company):
من يدالعد بتطوير ناقم لذينال والعمالء المشاريع بعض أدناه القائمة توضح: لبعض المشاريع التي تنفيذها لرئيسيةا قائمةال
(:ديالي شركةمن خالل ) معهم المشاريع
الكسك، رقم العقد أمالحمشروع وحدات إزالةP.O. 2726 2008\5\22، بتاريخ
مصافي الشمال المستفيد النهائي: وزارة النفط العراقية، شركة
الشركة المتعاقدة: شركة الحي العصري، الشركة المجهزة: شركة الدار البيضاء )ديالي سابقا(
البضاعة الموردة: وحدات تجفيف و إزالة أمالح
(CAMERON (Formerly NATCO, United Kingdomالمنشأ:
-
Page 11 of 69
-
Page 12 of 69
مشروع وحدات إزالة أمالح الكسك، رقم العقدP.O. 2726 2008\5\22، بتاريخ
المستفيد النهائي: وزارة النفط العراقية، شركة مصافي الشمال
بقا(الشركة المتعاقدة: شركة الحي العصري، الشركة المجهزة: شركة الدار البيضاء )ديالي سا
الحرارية مبادالتالبضاعة الموردة:
API Schmidt-Bretten GmbH, Germanyلمنشأ:
-
Page 13 of 69
مشروعWET CRUDE OIL TREATMENT UNIT رقم العقد ،P.O. 10-
2011\2\6، بتاريخ 4081
نفط ميسانالمستفيد النهائي: وزارة النفط العراقية، شركة
Italyالمنشأ: الشركة المتعاقدة: شركة ديالي،
Indirect Water Bath Heatersالبضاعة المجهزة:
SRI Sitesالشركة المجهزة:
-
Page 14 of 69
o 2011\2\9اريخ ، بت4142 101-85مشروع توريد ضاغطات هواء، رقم العقد
نفط الجنوبالمستفيد النهائي: وزارة النفط العراقية، شركة
الشركة المتعاقدة: ديالي، المنشأ: أمريكي
.FITZ TORQUE CONVERTORS INCالشركة المجهزة:
-
Page 15 of 69
-
Page 16 of 69
-
Page 17 of 69
مشروع توريد براغيStuds & boltsقد ، رقم العP.O. 2761 2010، بتاريخ
مصافي الشمالالمستفيد النهائي: وزارة النفط العراقية، شركة
Caspian Corporation UKالشركة المتعاقدة:
الشركة المجهزة: شركة الدار البيضاء
Cooper and Turner, UKالمنشأ:
-
Page 18 of 69
-
Page 19 of 69
-
Page 20 of 69
-
Page 21 of 69
توريد معدات سالمة، رقم العقد مشروعP.O. 2665 2009، بتاريخ
مصافي الشمالالمستفيد النهائي: وزارة النفط العراقية، شركة
الشركة المتعاقدة: ديالي، المنشأ: النمسا
Mercanta, Austriaالشركة المجهزة:
-
Page 22 of 69
-
Page 23 of 69
-
Page 24 of 69
مالح الكسك، رقم العقد مشروع وحدات إزالة أP.O. 2726 2008\5\22، بتاريخ
المستفيد النهائي: وزارة النفط العراقية، شركة مصافي الشمال
بقا(الشركة المتعاقدة: شركة الحي العصري، الشركة المجهزة: شركة الدار البيضاء )ديالي سا
الكيميائية المواد حقن وحداتالبضاعة الموردة:
Positive Metering Systems International, UKلمنشأ:
-
Page 25 of 69
مشروعDCS Control System For Lube Oil Plant رقم العقد ،P.O. 5145/B بتاريخ ،
2014
الجنوب مصافيالمستفيد النهائي: وزارة النفط العراقية، شركة
الشركة المتعاقدة: ديالي
(InvenSys (Foxboroالشركة المجهزة:
USAأ: المنش
-
Page 26 of 69
مشروع توريد زيوت، رقم العقدP.O. 3025 2014\1\25، بتاريخ
-
Page 27 of 69
الشمال مصافيالمستفيد النهائي: وزارة النفط العراقية، شركة
عمانالمنشأ: سلطنة الشركة المتعاقدة: شركة الدار البيضاء،
Shellالشركة المجهزة:
-
Page 28 of 69
ABB, USA, Switchgears.
-
Page 29 of 69
مشروع وحدات إزالة أمالح الكسك، رقم العقدP.O. 2726 2008\5\22، بتاريخ
المستفيد النهائي: وزارة النفط العراقية، شركة مصافي الشمال
بقا(الشركة المتعاقدة: شركة الحي العصري، الشركة المجهزة: شركة الدار البيضاء )ديالي سا
المياه وغسل لخاما النفطالبضاعة الموردة: مضخات
Deep Blue Pump Company, Netherlandsلمنشأ:
-
Page 30 of 69
Haff-Dichtungen GmbH, Germany, Spiral Wound Gaskets
-
Page 31 of 69
-
Page 32 of 69
مشروعWET CRUDE OIL TREATMENT UNIT رقم العقد ،P.O. 10-4081 ، 2011\2\6بتاريخ
-
Page 33 of 69
نفط ميسانالمستفيد النهائي: وزارة النفط العراقية، شركة
Germanyالمنشأ: الشركة المتعاقدة: شركة ديالي،
KSB Crude Oil Pumpsالشركة المجهزة: البضاعة المجهزة و
-
Page 34 of 69
2011\4\25، بتاريخ 4031-09-69، رقم العقد طن 15000توريد إسمنت آبار نفطية مشروع
نفط الجنوبالمستفيد النهائي: وزارة النفط العراقية، شركة
شركة دياليالشركة المتعاقدة:
شركة إسمنت ريسوت، سلطنة عمانالمنشأ:
توريد مشروعFittings and Seamless Pipes رقم العقد ،P.O. 2582 2008، بتاريخ
مصافي الشمالالمستفيد النهائي: وزارة النفط العراقية، شركة
الشركة المتعاقدة: شركة الحي العصري
الشركة المجهزة:شركة الدار البيضاء
InterPipe , Ukraineالمنشأ:
Crude Oil Pumpsالبضاعة المجهزة:
توريد مشروعDigital Radio Link رقم العقد ،SOM-41-07-9048-01 2009، بتاريخ
لشمالنفط االمستفيد النهائي: وزارة النفط العراقية، شركة
OROK FZCOالشركة المتعاقدة:
الشركة المجهزة:شركة الدار البيضاء
HRF , Australiaالمنشأ:
-
Page 35 of 69
رقم العقد طن 1000إسمنت آبار نفطية توريد مشروع ،SOM-69-07-5017-01 بتاريخ ،
2009
نفط الشمالالمستفيد النهائي: وزارة النفط العراقية، شركة
OROK FZCOالشركة المتعاقدة:
الشركة المجهزة:شركة الدار البيضاء
شركة إسمنت ريسوت، سلطنة عمانالمنشأ:
توريد قطع غيار مشروعRadar Tank Gauge System 5011، رقم العقد/B بتاريخ ،
29\11\2010
مصافي الجنوبالمستفيد النهائي: وزارة النفط العراقية، شركة
OROK FZCOالشركة المتعاقدة:
ة:شركة دياليالشركِة المجهز
SAAB Resemount المنشأ:
-
Page 36 of 69
The following a snapshot on projects executed by White House and its sister companies:
Design, development and Installation of a new PLC control system (LGIS GLOFA
GM4) for packing unit in Baghdad Pepsi factory. (2005).
Rehabilitation, Expansion and Commissioning of an old RTU (ASEA DS803) also
adding a new PLC channel to transfer the operation data of the new generating unit
(40 VA) added at Old Samawa Substation, also executing all needed electrical and
civil work related to.
Commissioning of SFC and SEE systems for generating units (3rd and 4th with 150
MVA each) Baiji Gas Generation Station. (2005).
-
Page 37 of 69
Rehabilitation, maintenance and commissioning of control system (Siemens STEP7-
300 PLC) of the water treatment unit at South Baghdad Generation Station. (2005).
SCADA system Replacement (SCADA Master and Telemetry Units) of the central
electrical power production network of Iraq, the work include:
• Site assessment all 132 KV substations in Iraq central region. Assessments made
to define requirements to replace old equipments and to design new equipments
installation.
-
Page 38 of 69
• Removing old units and performing all civil and mechanical work to install new
equipments (RTU, PLC, UHF, MUX, PW, Line Tuners and Battery Chargers) in
substations.
• Installing the new equipments supplied by Siemens due to modified design and
modifying the installation site to the operation conditions of the new equipments.
• Issue design documents, as built documents and commissioning documents.
• Design and Implement civil, mechanical, electrical, and decoration work to build
the new Central Regional Control Center (CRCC) master system.
• Install the new SCADA master system (Siemens Spectrum Power3 SCADA)
supplied by Siemens and performing all hardware, software, and database
modifications and commission the SCADA system.
• Retuning unit’s parameters to accomplish information transfer and commission
the whole system.
-
Page 39 of 69
• The work involves also the issue of weekly time schedule to execute activities
concurrently in multiple sites and to perform document management, quality
management, human and materialized resources for the project. Holding
educational and training courses inside and outside the company for the project
staff, and establishing a relation and coordination between parties involved in the
project including the Ministry of Electricity (MoE), the work started from October
2005 to May 2007.
New SCADA system of southern power production network Commissioning. The
work involves:
-
Page 40 of 69
• Reinstall the new SCADA Master system (Siemens Spectrum power SCADA) at
the Southern Regional Control Center (SRCC), power up and modifying
hardware, software and database.
• Retuning parameters and commissioning telemetry units at substations (RTU,
PLC, Local HMI, and Battery Charger).
• Commission the overall SCADA system.
• The work involves also issue the weekly time schedule to execute activities
concurrently in multiple sites. Perform document management, quality
management, human and materialized resources for the project. Holding
educational and training courses inside and outside the company for the project
staff, and establishing a relation and coordination between parties involved in the
project including the Ministry of Electricity (MoE), the work started at October
2006 to May 2007.
Rehabilitation control system of core forming machine (two machines) in White
House Electrical Manufacturing State Co., the project involves redesigning the
control system based on Siemens Step7 PLC (the old system based on Mitsubishi
PLC), replacing sensors and actuators also rewire the control signals.
Consultancy and Supervision on civil and mechanical work of a 127 GSM network
sites for Korek Telecom Baghdad GSM network project (phase 1), the work involves
development and management over the work plan, establishing quantities and
activities tables for civil and mechanical work activities, testing and inspection of
towers concrete base and steel structure.
Design, Installation and commissioning of Korek Telecom Baghdad GSM network
(127 GSM network sites – phase 1) the work involves:
• Installing Ericsson GSM equipments (Indoor and Outdoor)
1. Ericsson RBS (BTS), 2000 Generation.
2. Ericsson BBS, 2000 Generation.
-
Page 41 of 69
3. Kathrein Azimuth antenna.
• Installing Ericsson MW equipments
1. Minilink MW Equipments, E Series.
2. Minilink MW antenna.
3. Ericsson Radio RAU (15/25/21 GHz, 18/25/21 GHz, 18/35/31
GHz, 38GHz).
GE Mark V control system document review, wiring, testing and commissioning
support of Al-Najaf New 2 X 125 GTPP. The work includes (but not limited to)
Turbine Control Compartment TCC (GE Mark V), Balance Of Plant BOP (SIEMENS
S7 PLC System), Fuel Treatment (West Falia), Water Treatment, Fuel Storage Tanks
and field instruments (2009). White House scope of work involves, but not limited to:
• Review all wiring documents and correcting as necessary.
• Laying, wiring, termination, tagging, testing, continuity check and loop check of
all control cables and low voltage power cables in the plant.
• Provide commissioning team support.
• Issue as-built documents of the control system wiring.
Cabling, Testing, and Commissioning Support for Sulaimanyia 4x125 MW GTPP
OVATION® DCS (Distributed Control System) (2009). The work includes but not
limited to:
-
Page 42 of 69
• Lay, termination and tagging of all cables between OVATION cabinets and
related Marshalling cabinets.
• Check the signals continuity between Ovation Cabinets and MCs.
• Checking the loops between the DCS and the DB server, (DCS loop Check).
• Highway Networking, this includes the Ethernet network for the Ovation DCS
highway between network cabinet and the system drops (controllers and
workstations).
• GPS antenna and GPS clocks installation
Design, Program development, Installation and Commissioning of a Center to Center
Communication Module based on ICCP TASE 2.0 link between Mosul Dam Control
Center and the NDC SCADA (Iraqi National Dispatch Center) (2009). The work
includes:
-
Page 43 of 69
• Upgrading the existing SCADA of Mosul Dam to comply with ICCP protocol,
and adding an OPC client module to Mosul Dam SCADA, to communicate with
the SISCO OPC Server for ICCP (AX-S4 ICCP).
• Configure the ICCP server module of ABB Ranger SCADA of the NDC and
building the necessary DB files to define Mosul Dam links and data (includes the
configuration of the DB and Bailey Utility BUN).
Corporate with Ministry of Electricity MoE Team on configuring and commissioning
the ICCP link between NDC and Northern Regional Control Center (NRCC), and the
ICCP link between NDC and Central Regional Control Center (CRCC) (2009).
Design, Supply, Insulation and Commissioning of a Data Logger System for the 2nd
and 4th thermal generation unit at Baiji Thermal Generation Station. The system
based on Siemens STEP 70-400 Series PLC technology, with HMI Siemens WinCC
7.0 SP1. A new wiring installed based on the new design, and an HMI application
developed to monitor and report around 1000 input signals for each unit (2009).
-
Page 44 of 69
EExxppeerrttiissee
The company staff had a good experience in industry, and energy production automation
through their involvement in many rehabilitation and development projects in Iraqi Ministry of
Industry (MoI) and Ministry of Electricity (MoE) such:
• Replacement and enhancement of SCADA systems of electrical dispatch centers in middle
south and north of Iraq. The work involved reverse engineering of existing systems,
designing a new SCADA system (hardware and software), implementing designed system
and integrates it into existing telemetry network. This work accomplished in the GSC State
Company (a contracting company of Iraqi Ministry of Industry and Minerals) laboratories.
The developed SCADA system (named GSCSCADA) installed and commissioned in
multiple sites such as National Dispatch Center (NDC) in Baghdad, Northern Regional
Control Center (NRCC) in Kirkuk, Mosul Dam Control Center (MDCC) in Mosul, and
Baghdad Distribution Control Center (BDC) in Baghdad.
• Control systems replacement and enhancement of in number of factories and industrial
planets. The work involves design, implementation, installation and commissioning. White
House staff plays the main role in many projects such design, implementation, installation,
and commissioning of a new PLC system. Such (Siemens STEP7 PLC and WinCC
Monitoring and Control) in Singar Cement Factory, design implementation installation and
commissioning of a new PLC system (LGIS GLOFA GM4 PLC system) in Kirkuk Cement
Factory and Kubesa Cement Factory, design implementation installation and
commissioning of a new PLC system (Allen Bradely ControlLogix PLC) in Wet Oil
Station in Northern Oil Company.
• Enhancement and replacement of automatic control units using dedicated microcontrollers
and modern intelligent electronics to replace old units or interface old systems into new
controllers. White House staff Leads number of such projects for GSC State Co. such
design and development of control unit on packing weighing system in Baiji Fertilizer
-
Page 45 of 69
Factory, design and development of a control unit for the bridge crane in Nasser Company,
design and development of a scan monitor for Kubesa cement Factory.
• Maintenance, rehabilitation and commissioning of control systems in number of industrial
planets. White House staff have a long experience with such projects such maintenance and
rehabilitation of SFC system of 1st unit at Baiji gas generation station, maintenance and
reprogramming the HMI system (Rockwell Monitoring and Control software for Allen
Bradely PLC system) at Mosul gas generation station, maintenance and rehabilitation of
control cards of Arc and Thermal furnaces at Nasser company.
SCADA & Telemetry: This is a very wide field which will be of great importance in near
future in Iraq.
Monitoring and Control of Remote Sites: White House is capable of design, development
and installation of local control and monitoring systems for electrical substations (low,
medium and high voltage), electrical power stations, water treatment stations, water
-
Page 46 of 69
pump stations, sewage treatment stations, sewage pump stations. White House is also
capable of design and development of equipments necessary to connect remote sites into
regional monitoring and control centers. White House is experienced with many
internationally known manufacturers in the field such, ABB, Siemens, LGIS, PHONIX
and RFL.
Industrial Plants and Processes Automation: White House is capable of design,
development and installation of automation solutions for industrial plants and factories,
these solutions range from simple single controller to PLC based control and Distributed
Control System (DCS). White House is experienced with all project phases, assessment,
process modeling, field instruments, signal transmitters, controllers, and monitoring and
control software. White House has been using many internationally known control
systems Siemens PLC systems, LGIS PLC systems, Allen Bradley PLC systems.
AAccttiivviittiieess
Execution for the following projects with Haroug (VEBA formary) Oil Operation (HOO) - Petro
Canada Partner-Libya.
1. Meter Bank PLC (Allen-Bradley), & Wonder ware (InTouch) SCADA. Ras Lanuf HOO
Terminal.2006
2. Jiskoot Oil samplers.12 Samplers distributed in 4 HOO fields (RasLanuf,Amal,Tibisti &
Jofra).2006-2007
3. SAAB Radar Tank Gauge system,13 Tank Guages in RasLanuf HOO Terminal.2005
4. Rotork valve's actuators.140 actuators in Ras Lanuf HOO Terminal.
5. SCADA Tank Farm upgrades Siemens simatic S7-300 ongoing.in Ras Lanuf HOO
Terminal.
6. Complete study for the following projects:
-
Page 47 of 69
Pump Station and SCADA Engineering Upgrade Study, Amal Field, HOO,
Libya.2009-2010.
Meter Bank Upgrade/Replacement Study, Ras lanuf- HOO, Libya.2009-2010.
RReesseeaarrcchh aanndd DDeevveellooppmmeenntt
White House has a qualified engineering staff experienced in analyzing any problem facing
the design engenderers in a project with genius solutions. In addition, they have a consistent plan
to introduce the new technologies and train the engineering staff on it to adopt it in the future
projects. The R&D team in White House is led by couple of engineers, who had an extensive
experience in lecturing and student projects supervision in Baghdad College of Engineering.
SSuupppplliieess,, SSeerrvviicceess aanndd SSoolluuttiioonnss
White House’s range systems supplies and services is characterized by highly specialized
offering and richness of pre-engineered solutions. White House controls engineers' diversified
project experience (i.e. designing PLC/HMI or DCS based platforms), and also provide
integrated control system solutions that are designed for the customer's specific plant
requirements. Our capabilities include:
• Supply of Control Systems based on DCS, PLC, and SCADA.
• Supply of Emergency Shutdown Systems.
• Supply of Supervisory and Plant Information Systems.
• Specification of pneumatic instrumentation, electronic analogue and digital
instrumentation, process computers and distributed control systems.
• Corrective, preventive, predictive, proactive maintenance of automation systems to
ensure production continuity.
-
Page 48 of 69
• Power Plant Optimization
• Control System Upgrades
Integrated PLC, DCS, and HMI Control Systems
• Comprehensive Instrumentation, Controls and Electrical Designs
• Integrated PLC, DCS, and HMI Control Systems
• Project Development
• Operations Manuals
• Operating Training
MMAAIINNTTEENNAANNCCEE AANNDD SSEERRVVIICCEESS
White House can provide after sales services in various forms including:
• Preventive Maintenance Support
• Telephone Support
• Emergency Support
• Continuous on site support
PPRROOJJEECCTTSS EEXXEECCUUTTEEDD IINN IIRRAAQQ ((QQuuaannttuumm))
Project: Modernization of interlock system for 3 air blowers in 3x sulfuric acid
production unit 1600 t/day each.
- Client: State Ent. For Phosphate
- Scope of Supply: Design & Engineering of system, Procurement of PLC system and
online monitoring devices. Installation, supervision & commissioning. Training of
customer personnel.
- Year: 1989
Project: Onsite assistance in commissioning new cement mill.
-
Page 49 of 69
- Client: State Company for Cement Al-Muthanna Cement Plant
- Scope of Supply: Commissioning of PLC system for all plants and offsite, training of
customer personnel on PLC system supplied
- Year 1988/1989
Project: Upgrade of Dewaxing filters interlock system.
- Client: Daura Refinery – Baghdad
- Scope of Supply: Procurements of PLC system assistance in program development
and configuration. Installation, supervision & commissioning.
- Year: 1990
Project: Reconstruction of sulfuric acid plant control room for line # 3.
- Client: State Ent. For Phosphate
- Scope of Supply: Procurement Instrumentation and control panels. Engineering of
control system and commissioning, Installation supervision.
- Year: 1991
Project: Reconstruction of temperature monitoring system for high tension motors in
the plant
- Client: State Company for Cement Karbala cement plant
- Scope of Supply: Detailed engineering design of upgraded system based on PLC
system, installation supervision and commissioning of system.
- Year: 1992
Project: Modernization of Salahuddin refinery #1 Control Room.
- Client: North refineries Company-Baiji
-
Page 50 of 69
- Scope of Supply: Procurement and delivery of 200 digital controllers and training of
customer personnel.
- Year 1998
Project: Upgrade of Field Transmitters.
- Client: South Refineries Basrah
- Scope of Supply: Procurement and delivery of Field instruments for the Boilers and
training of customer personnel.
- Year: 1999
Project: Upgrade of Dewaxing filters interlock system.
- Client: Daura Refinery - Baghdad
- Scope of Supply: Procurement and delivery of PLC system and training of customer
personnel.
- Year 1999
Project: Modernization of instrumentation W/shop.
- Client: Daura Refinery – Baghdad
- Scope of Supply: Supply of test equipments and accessories and training of customer
personnel.
- Year: 2000
Project: Modernization of Lube Oil plant Control room.
- Client: Daura Refinery – Baghdad
- Scope of Supply: Supply of digital controllers and training of customer personnel.
- Year: 2000
-
Page 51 of 69
Project: Temperature indication systems
- Client: Daura Refinery – Baghdad
- Scope of Supply: Supply of 286 T/C points temperature indication systems and
training of customer personnel.
- Year: 2000
Project: Instrumentation W/Shop modernization for south gas plant.
- Client: South Gas Co. – Basrah
- Scope of Supply: Supply of modern instrumentation laboratory, installation
supervision and training of customer personnel.
- Year: 2000
Project: Instrumentation W/Shop modernization for Rumailah Plant.
- Client: South Gas Co. – Basrah
- Scope of Supply: Supply of modern instrumentation laboratory and training of
customer personnel.
- Year: 2000
Project: Rehabilitation of 3 Boiler control system.
- South Refineries – Basrah
- Scope of Supply: Detailed engineering design of control system including burners
start up sequence, procurement of burner management components and associated
valves, control cabinet assembling, installation supervision and commissioning of
complete system.
- Year: 2001
-
Page 52 of 69
Project: Complete PLC system replacement.
- Client: Jordan Phosphate Mines Co
- Scope of Supply: Supply of new PLC system, supervision on installation &
commissioning and training of customer personnel.
- Year: 2001
Project: Modernization of instrumentation W/shop.
- Client: South Refineries, Basrah
- Scope of Supply: Detailed engineering, procurement, commissioning, training of
customer personnel.
- Year: 2002
Project: Supply of a new system for Temperature reading and logging based on modern
PLC system connected with control room display unit.
- Client: South Gas Co. Basrah
- Scope of Supply: Material supply system engineering, installation supervision and
commissioning, training of customer personnel.
- Year: 2002
Project: Pipeline system to supply crude oil to Yousifia power station, consisting of skid
mounted metering system, control valves and control instrumentation.
- Client: State Company for Oil Projects
- Scope of Supply: Detailed engineering, procurement, metering skid & control cabinet
assembling, installation supervision, commissioning, training of customer personnel.
- Year: 2003
-
Page 53 of 69
Project: Pipeline system to supply crude oil to Anbar power station, consisting of skid
mounted metering system, control valves and control instrumentation.
- Client: State Company for Oil Projects
- Scope of Supply: Detailed engineering, procurement, metering skid & control cabinet
assembling, installation supervision, commissioning.
- Year: 2003
Project: Oil products transportation bottleneck solving in the pumping and receiving
stations at Dewanya and Karkh.
- Client: State Company For Oil Projects (SCOP)
- Scope of Supply: Detailed engineering, procurement, metering skid & control cabinet
assembling, installation supervision, commissioning, training of customer personnel.
- Year: 2003
Project: Supply of Data Loggers.
- Client: South Gas Co. Basrah
- Scope of Supply: Supply of new AOIP Data log - 140.
- Year: 2005
Project: Rehabilitation of instrumentation & control system of 2 X Desalination trains.
- Client: Public electrical Co. San’aa, Yemen
- Scope of Supply: Detailed engineering, procurement, installation supervision,
commissioning, training of customer personnel
- Year: 2006
-
Page 54 of 69
Project: Supply of Positoners.
- Client: South Oil Co.
- Scope of Supply: Metso Pneumatic Positioners.
- Year: 2007
Project: Supply of Control and instrumentation cables.
- Client: NOC, Iraq.
- Scope of Supply: Cables, Junction boxes and Cable glands.
- Year: 2007.
Project: Graphic Data Acquisition units.
- Client: SRC, Iraq.
- Scope of Supply: FUJI Paperless recorders.
- Year: 2007
Project: Continuation of boiler revamping and upgrading of present control system to
fully automated.
- Client: South Refineries – Basrah
- Scope of Supply: Detailed engineering, procurement, installation supervision,
commissioning, training of customer personnel.
- Year: 2003 – 2008
Project: Supply of Lab Equipment.
- Client: Midland Refineries, Iraq.
- Scope of Supply: Stanhope-Seta Viscometer, colorimeter and spare parts.
- Year: 2008
-
Page 55 of 69
Project: Rehabilitation of Boiler No. 5.
- Client: North Gas Co. , Kirkuk-Iraq.
- Scope of Supply: Detailed engineering, procurement, installation supervision,
commissioning and training of customer personnel.
- Year: 2008
Project: SRC-Naphtha Loading Flowmeters
- Client: Barakat Al-Eiz.
- Scope of Supply: Engineering and Supplying of the required field instruments (Flow
Meter, TTs, TEs and PTs) and the flow computer device. Flow Computer
Programming.
- Year: 2010.
Project: Upgrading of Pumps Station Control System
- Client: Alnawahil Co. (End user: NOC).
- Scope of Supply: Engineering and supplying of an upgraded control system for an
existing Pumps Station by using Schneider automation Quantum PLC and Siemens
Wincc SCADA software.
- Year: 2010.
Project: Engineering & Procurement: Control System for Desalter plant
- Client: White House Co. / North Refineries Co.
- Scope of Supply: Control Panel, MCC, Field Instruments.
- Year: 2010.
-
Page 56 of 69
Project: Upgrading Basra Air Port Water treatment control system Client: AL-Abis for
general trading Scope of Supply:
- Engineering, supplying, programming, configuration and installation of the new
control system components such as Schneider Electric PLCs and I/O Modules and
SCADA work stations using Siemens Wincc SCADA software.
- Engineering works for the integration of the new components into the existing control
panels.
- Year: 2011
Project: KAFZA FUEL STORAGE TANKS FACILITY Client: DIG/SKA. Scope of
Supply:
- Designing, Engineering and Supplying of Control System, Cables, JBs.
- Engineering works of equipments and instruments.
- Supplying of Air Compressor, Tanks Breathing Valves. and field Instruments (PTs,
TTs, PGs and LTs and ultrasonic flow meters).
- Electrical system (Power, Lighting, earthling system, lightning protection and
Cathodic protection) engineering and design.
- Supplying of MCC, ATS and Capacitive Bank Panel including engineering works.
- Preparing P&ID and Logic diagrams and cause and effect table.
- Engineering of instruments installation, wiring and hookup drawings.
- Full designing and Engineering of KAFZA Facility pneumatic system.
- Year: 2011-2013.
MMaannuuffaaccttuurreerrss,, SSuupppplliieerrss && CCoonnttrraaccttoorrss
-
Page 57 of 69
Schneider Electric
Grenoble – France. Automation systems.
QuantumTech is an approved system integrator
for Schneider Electric.
FT. TECHNOLOGIES 3376 CARVERTON
LN ALPHARETTA , GA 30022
Exporter of spares and equipment for the oil and
Gas industry.
Metso Automation Neles-Jamesbury Valves
Division, Jebel Ali Free Zone, Dubai-U.A.E.
Metso is a global supplier of technology and
services in the process industries, including
mining, construction, recycling, pulp and paper,
power and oil and gas
Tecnodistribuzione Via Nataloni 27, 47900 Rimini –
Italy. Exporter of material and parts for the Refining
industry.
-
Page 58 of 69
Beamex Beamex Oy Ab Ristisuonraitti 10 FIN-68600
Pietarsaari FINLAND. Calibration laboratory and hand
held calibrators for Instruments
Stanhope-Seta London Street, Chertsey, Surrey
KT16 8AP England – U.K. Analytical Instruments and
equipment for laboratories of petroleum production and
refining. Analytical Instruments and equipment for
laboratories of petroleum production and refining.
Smar Equipamentos Ind. Ltda. Rua Dr.
Antonio Furlan Jr., 1028 14170-480 Sertãozinho
Sao Paulo – Brazil Pressure , Flow , Temperature
and other measuring instruments for the Petroleum
Industry . Field Bus systems.
PPrroossppeeccttss aanndd FFuuttuurree
White House looking to expand its future in two aspects:
First strengthening relationships with our customers through developing solutions prevent
them from spending extra money to integrate different systems or units involved in production
process or to integrate new technology into an old production line. Also by continuing our
service after project turned off to the customer by producing our consultancy and advice on how
-
Page 59 of 69
to enhance system performance and production process efficiency and introduce him to new
technologies which will beneficial for his production line.
Second expanding our experience in new fields of modern industry and energy fields, which
is crucial for modernization of the local industry and energy production planets. We are looking
forward to be a leading company in introducing technologies such alternative and renewable
energy, clean and economical industry.
-
Page 60 of 69
Appendix- Sample of executed Contracts, Projects,
Agencies
-
Page 61 of 69
-
Page 62 of 69
-
Page 63 of 69
-
Page 64 of 69
-
Page 65 of 69
-
Page 66 of 69
-
Page 67 of 69
-
Page 68 of 69
-
Page 69 of 69
Wh
ite
Ho
use
Co
mp
an
y
White House for Trading and Contracting
Jordan / Amman
Wasfi altal street, Gosha center 115, Bureau 201
PO.Box2433 Zip: 11953
Tel: +9626-5523448
Fax: + 9626-5527790
Mobile: + 962-786-880333
Email: [email protected]
Website: www.whitehouseoil.com
mailto:[email protected]://www.whitehouseoil.com/