siamois sismomètre interférentiel a mesurer les oscillations des intérieurs stellaires
DESCRIPTION
SIAMOIS Sismomètre Interférentiel A Mesurer les Oscillations des Intérieurs Stellaires Seismic Interferometer A? to Measure Oscillations in the Interior of Stars CONCLUSION / DISCUSSION. Scientific programme. Many targets (solar like oscillations, other pulsators…). Cf Don’s talk - PowerPoint PPT PresentationTRANSCRIPT
15/05/2006 kickoff meeting / conclusion 1
SIAMOIS Sismomètre Interférentiel A Mesurer les Oscillations des Intérieurs Stellaires
Seismic Interferometer A? to Measure Oscillations in the Interior of Stars
CONCLUSION /DISCUSSION
15/05/2006 kickoff meeting / conclusion 2
Scientific programme
• Many targets (solar like oscillations, other pulsators…). Cf Don’s talk
• Other, further targets: precise selection criteria are required to optimize the preparatory work
for airmass < 2 opposite to the Sun in June range [15-21 h] to be avoided
except if declination is ‘very negative’
• Too many targets?
• Further simulations are required- synthetic spectra performances (other types than FV or GV)- Doppler signature in specific cases: for example g modes of Dor targets
• Scientific specifications (which duty cycle for which target)
15/05/2006 kickoff meeting / conclusion 3
Dome C
• Constraints due to the site- Transportation- Temperature- No laboratory- Setup (very) limited
• Environmental constraints
• Discussion with IPEV / Experience of LUAN
15/05/2006 kickoff meeting / conclusion 4
Inputs/simulations
• Better estimate of the duty cycle (2nd wintering, E. Aristidi): during the winter nights, during N months after and before.
• Measurement/estimation of sky brightness: photon noise limited performance for V = 5 vsky > 17/ ’’2
• Performance for magnitudes fainter than 5 (): faint target+rapid oscillation limited performances
• Performance for low fringe contrasts
15/05/2006 kickoff meeting / conclusion 5
Communication (1)
• Unique advantage of Dome C:only ground-based site providing 3-month long (100 days !) observations
• For specific targets, 3 months or 3 x 1 month?
• Only ground-based site providing a duty cycle about 80-90%, much better than 70% (WET)
• Fourier tachometer: successful principle of GONG (in use for > 12 years)
• Core program/additionnal program
• Possible evolution: simultaneous multi-targets
15/05/2006 kickoff meeting / conclusion 6
Communication (2)
• SIAMOIS COROT • SIAMOIS SONG • SIAMOIS future project
• Link with IPEV, IPY
• ARENA: federation of scientific projects to be operated at Dome C(meeting: June 14-16, IAP)
• Next conferences (COROT, UAI, Vienna workshop)
• Conclusion of the kickoff meeting ANR
• We need a logo!