shift2rail entreprise commune européenne appels à ... · shift2rail entreprise commune...
TRANSCRIPT
Shift2Rail Entreprise commune européenne
Appels à propositions 2020
Matinée d’information
Shift2Rail State of Play
Giorgio TRAVAINI
Head of Research & Innovation
S2R Joint Undertaking
0
50
100
150
200
250
300
350
400
450
500
8 FoundingMembers
19AssociatedMembers
Open Calls
AN OPEN and ACTIVE
ORGANISATION
Valu
es a
s a
t 1 S
ept
2016 in M
illion E
UR
*incl. at least 120M€ of additional activities
Railway - System of SystemsIP1 Cost-efficient and Reliable Trains, including high-capacity trains and high speed trains
IP2 Advanced Traffic Management and Control System
IP3 Cost-efficient, Sustainable and Reliable High Capacity Infrastructure
IP4 IT Solutions for Attractive Railways Services
IP5 Technology for Sustainable and Attractive European Rail Freight
CCA Cross Cutting Activities
TimetableForward / backwardAccelerate - brake
Operation Rolling Stock
Infrastructure
IPx: looking beyond S2R currently planned technology applications and integrating them with disruptive innovations
• Concepts for the autonomous railway vehicles “train-centric”• Disruptive technologies impacting automation systems and
maintenance• industry 4.0 (automated industry and industry as a service),
railway clouds and decentralised ownership • A.I. for railways Digital solutions
S2R System Architecture and Conceptual Data Model : 1. comprehensive model/architecture, technologies
and strategy for implementation of a new encompassing railway system approach
2. aligning all ongoing modelling initiatives in terms of modelling principles and digital data integration
Activities just launched
Going for global performance definitely
requires to master, design and simulate
the Railway System as a whole
definition of an overall architecture
Annual Work Plan 2020 topics and S2R Programme specificities
Giorgio TRAVAINI
Head of Research & Innovation
S2R Joint Undertaking
The S2R Programme implementation
The S2R MAAP*
• is a collaborative long-term investment planning document, which now also contains an Executive View (Part A) providing the S2R vision and Capabilities
• translates strategic R&I priorities for the Railway sector – as per S2R Master Plan - into concrete R&I activities, milestones and deliverables
• contains the description of R&I activities worth an estimated value of about EUR 777 million
• is a living document (new version for Part B)• enables the preparation of result-oriented Annual Work Plans and Calls
for Proposals or Tenders• grants awarded for the actions(Projects) should aim to implement
part(s) of the MAAP
* multi-annual action plan
AWP 2020 S2R Programme specificities
Million of EUR Total Members only Open to non-
Members
Value of the Call for Proposals R&I 146.6 123.8 22.8
S2R Maximum Co-funding 75.4 55.4 20
In-Kind Contribution 71.2 68.4 2.8
No of topics 19 8 11
Value of Call for tender R&I 4.4 0 4.4
No of topics 3 0 3
Value of Prizes 0.5 0 0.5
No of topics 4 0 4
• Standard H2020 eligibility conditions:
• 'Research and Innovation Actions' (RIA) and 'Innovation Actions' (IA): Minimum three legal entities established in minimum three different Member States or an Associated Countries
• 'Coordination and Support Actions' (CSA): one or more legal entity(ies) established in a Member State or in an Associated Country
Other entities from countries outside a Member State or Associated Country may participate to the open calls, but are, in principle, not eligible for funding unless there is a reciprocal agreement in place with that country or the applicant can demonstrate that the entity has unique resources that render its participation essential for the project to go ahead successfully
• Additional conditions of S2R (Art 9(5) of H2020 RfP & Art. 17 S2R Regulation):
• Calls for members: Open only to members of the S2R JU and their affiliated entities
• Open calls: Open only to entities that are not members or affiliated entities of members of the S2R JU
who can participate?
10
• Who are the affiliated entities of the S2R JU members?
• Any legal entity that is under the direct or indirect control of a member (or, in the case of consortia, a constituent entity of the consortium), or under the same direct or indirect control as the member (or constituent entity of the consortium), or that is directly or indirectly controlling a member (or constituent entity of the consortium)
• The control may take in particular either of the following forms:
• direct or indirect holding of more than 50% of the nominal value of the issued share capital in the legal entity concerned, or of a majority of the voting rights of the shareholders or associates of that entity or
• the direct or indirect holding, in fact or in law, of decision-making powers in the legal entity concerned.
• The following relationships between legal entities do not constitute control relationships:
• the same public investment corporation, institutional investor or venture-capital company has a direct or indirect holding of more than 50% of the nominal value of the issued share capital or a majority of voting rights of the shareholders or associates;
• the legal entities concerned are owned or supervised by the same public body.
11
who can participate?
Thank you for your attention
• Applicable funding rates for the open calls:
• Funding rate depending on the type of action:
• Up to 100% of eligible costs for 'Research and Innovation Actions' (RIA) and for 'Coordination and Support Actions' (CSA)
• Up to 70% for 'Innovation Actions' (IA), except non-profit organisations (up to 100%)
• One project = One funding rate for all beneficiaries / activities in the grant*
*However, if non-profit organisations are in an IA together with for-profit organisations, their eligible costs will be reimbursed according to the different reimbursement rates specified above
The reimbursement rates apply to all forms of costs, including indirect costs (overheads): 25% flat rate (calculated on the basis of eligible direct costs, excluding direct sub-contracting costs)
funding rates
13
Overview of the standard call process
5 months max. 3 months max.
Invitation to grant
preparationGrant signatureCall deadline
Proposal EvaluationGrant Agreement
PreparationPrefinancin
gsubmission
Accession GA
H2020 max. duration to Grant signature:
Maximum five months from call closure date to end of evaluation - until the date of informing applicants
Maximum three months to prepare grant agreement from the date of inviting (informing) applicants until the signature of the grant agreement
Maximum eight months from call closure - until the signature of the grant agreement
8 months maximum
AWP S2R Programme specificitiesHow to read the topic acronyms
Topic number -
IPTopic name
Type of action
and expected
TRL
Value of action
(*)
EUR
Maximum S2R
co-funding (*)
EUR
Other contributions
from non-Members
(*)
EUR
S2R-OC-CCA-
01-2020
Noise &
Vibration
RIA
TRL 3/4950,000 950,000 0
Number of topic
Who can applyOC (open call)CFM (call for member)
Which area(IP/CCA)
RIA – Research & Innovation Action (100%)Innovation Action (70%)
Technology Readiness Level
Number IP1 IP2 IP3 IP4 IP5 CCA IPX
CFM topic 2 1 1 1 1 1 1
OC topic 3 2 3 1 1 1
Linked tender topic 1 1 1
Technology Readiness Levels definition
Where a topic description refers to a TRL, the following definitions apply, unless
otherwise specified:
• TRL 1 – basic principles observed
• TRL 2 – technology concept formulated
• TRL 3 – experimental proof of concept
• TRL 4 – technology validated in lab
• TRL 5 – technology validated in relevant environment (industrially relevant
environment in the case of key enabling technologies)
• TRL 6 – technology demonstrated in relevant environment (industrially relevant
environment in the case of key enabling technologies)
• TRL 7 – system prototype demonstration in operational environment
• TRL 8 – system complete and qualified
• TRL 9 – actual system proven in operational environment (competitive
manufacturing in the case of key enabling technologies; or in space)
Programme approach, future/current projects• EACH PROJECT contributes to the achievement of the Master Plan and the
MAAP objectives
• EACH PROJECT is part of a programme and cooperation with other projects must be ensured Through the collaboration and input to the JU Members, EACH PROJECT will support the realization of long-term S2R technological demonstrations or innovative break-through
• Particular attention is given to ensure that there is no duplication of work between EACH PROJECT and current/future R&I activities
• EACH PROJECT results are taken into consideration for the next annual work plans to ensure sufficient complementarity and coherence
Complementarity & Collaboration Agreement
1. Complementary is defined at topic level
2. Complementarity between topics is compulsory established inthe Grant Agreement (need for a Collaboration Agreement)
3. IP/CCA SteCos, high level synchronization points: Project Coordinators may attend the SteeCo meetings as observer and IP Coordinators cooperate with project coordinator to foster/promote synergies
4. S2R Programme Managers: Central Contact Point for both projects
Complementarity & Collaboration Agreement
Issues to be tackled in the Collaboration Agreement (COLA) (examples/non-exhaustive list)
• Rules for collaboration, “who does what?”; Point of Contacts etc.
• Handling review of documents
• Agreement on action to be performed by both sides + linked timing (e.g. project A provides “user requirements” by M6 to project B; project B provides input by M18 to project A project A uses input for deliver their deliverable 2.3).
• Participation to restricted meetings (for specific purpose) or to public meetings (including Advisory Groups, etc…).
IP1: Planning of activities per TD
Ongoing: PIVOT, PIVOT2, NEXTGEAR
Finished: Roll2Rail, Mat4RailOngoing: PIVOT, PIVOT2, CARBODIN
2019 2020 2021 2022 …Finished: Roll2Rail, Run2Rail
2018 2019 2020 2021 2022
TD1.2 Train Control and Monitoring System Demonstrator2015 2016 2017 2018 2019 2020 2021 2022 …
Finished: Roll2Rail, CONNECTA, SAFE4RAIL
…
TD1.4 Running Gear Demonstrator2015 2016 2017 2018
TD1.1 Traction Systems demonstrator
AWP 2020: OC
AWP 2020: OC
AWP 2020: CFM, OC
TD1.3 Carbody Shell Demonstrator
2015 2016 2017 2018 2019 2020 2021 2022 …Finished: Roll2Rail, PINTA
Ongoing: CONNECTA-2, Safe4RAIL-2
AWP 2020: CFM, OCOngoing: PINTA2
2015 2016 2017
IP1: Planning of activities per TD
Finished: Roll2Rail, CONNECTA, SAFE4RAIL, PINTA
2016 2017 2018 2019
2018
Ongoing: PIVOT, PIVOT2, CARBODIN
2019 2020 2021
2020 2021 2022
Ongoing: PIVOT, PIVOT2, CARBODINFinished: Roll2Rail, Mat4Rail
AWP 2020: CFM
TD1.8: HVAC2015 2016 2017 2018 2019 2020 2021 2022 …
Finished: PIVOT
TD1.7: Train Modularity In Use (TMIU)2015
Ongoing: PIVOT2
…
2022 …
TD1.6: Doors and Access Systems Demonstrator2015 2016 2017 2018 2019 2020 2021 2022 …
2015 2016 2017
TD1.5 Brake Systems Demonstrator
Ongoing: PIVOT, PIVOT2
Topic
number -
IP
Topic nameExpected
TRL
Type of
action
Maximum S2R
Co-funding
EUR
Complementarity
S2R-OC-IP1-01-2020
Support to Development of next generation of Traction systems
3 RIA 2,300,000
S2R-CFM-IP1-01-2020: Demonstrators for the next generation of traction systems,smart maintenance, virtual validation and eco-friendly Heating, Ventilation Airconditioning and Cooling (HVAC) and Technical research on battery and hydrogen powered regional trains
IMPACT-2 (GA 777513)
S2R-OC-IP1-02-2020
Network and end-device equipment forthe validation of the next generation of TCMS
6/7 IA 4,600,000 S2R-CFM-IP1-02-2020: Validation
of new technologies for the TCMS X2RAIL-3 (GA 826141)
S2R-OC-IP1-03-2020
Innovative technologies for Carbodiesand Running Gear of the future
5/6 RIA 2,420,000 PIVOT2 (GA 881807)
IP1: Open Calls 2020
S2R-0C-IP1-01-2020: Support to Development of next generation of Traction systems (TD1.1)• Research on 3D additive manufacturing and new manufacturing technologies for traction components - TRL 3
• Research on Wireless Dynamic Charging for urban vehicles based on SiC semi-conductors – TRL3
• Investigations on reliability of traction components and lifetime mechanisms – TRL4
• Research on Big Data, Artificial Intelligence (AI) applied to Traction systems smart and predictive maintenance – TRL4
S2R-OC-IP1-02-2020: Technical solutions for the next generation of TCMS• Antenna installation study to optimize transmission/reception in Wireless TCMS
• Functional Distributed Framework related research activities and Subsystem functions adapted to Application Profiles –TRL6
• Safety and Cybersecurity studies, methodology and tools to support SIL4 application.
• Development of equipments (TRL 6-7) to support the CFM demonstrators.
S2R-OC-IP1-03-2020: Innovative technologies for Carbodies and Running Gear of the future• Inspection methods for new materials adapted for the maintenance in railway environment (TRL4-5)
• Development of new elastomeric materials with enhanced lifetime for running gear application (TRL3-4)
• Development of new Journal Bearings with enhanced LCC and lifetime (TRL3-4)
AWP 2020, targets and content – IP1
IP2: Planning of activities per TD
Finished: ASTRail
AWP 2020: CFM, OCOngoing: X2Rail-2, GATE4Rail
Finished: ASTRail
Ongoing: X2Rail-1, X2Rail-3, MOVINGRAILAWP 2020: CFM, OC
TD2.4: Fail-Safe Train Positioning (including satellite technology)2015 2016 2017 2018 2019
AWP 2020: CFM, OC
Finished: MISTRAL
TD2.3 Moving Block2015 2016 2017 2018 2019 2020 2021 2022 2023
Finished: ASTRail
TD2.2: Railway network capacity increase (ATO up to GoA4 – UTO)2017 2018 2019 2020 2021 20222015 2016 2023
Ongoing: X2Rail-1, X2Rail-4, SMART2
TD2.1: Adaptable communications for all railways (quality of service, interfaces
to signalling)2017 2018 2019 2020 2021 2022 20232015 2016
Ongoing: X2Rail-1, X2Rail-3, EMULRADIO4RAIL
2020 2021 2022 2023
IP2: Planning of activities per TD
TD2.7: Formal methods and standardisation for smart signalling systems2015 2016 2017 2018 2019 2020 2021 2022 2023
2017 2018 2019 2020 2021 2022 2023
Finished: VITE
AWP 2020: CFMOngoing: X2Rail-1, X2Rail-3, GATE4Rail
Ongoing: X2Rail-2, ETALON, X2Rail-4
TD2.5: On-board Train Integrity 2015 2016 2017 2018 2019 2020 2021 2022 2023
TD2.6: Zero on-site testing (control command in lab demonstrators)2015 2016
Finished: ASTRail
Ongoing: X2Rail-2, 4SECURAIL
Ongoing: X2Rail-3, MOVINGRAIL
AWP 2020: CFM
TD2.8: Virtually – Coupled Train Sets (VCTS)2015 2016 2017 2018 2019 2020 2021 2022 2023
IP2: Planning of activities per TD
Ongoing: X2Rail-1, ETALON, X2Rail-4
Finished: CYRAIL
AWP 2020: CFM
TD2.11: Cyber Security2015 2016 2017 2018 2019 2020 2021 2022 2023
2021 2022 2023
2015 2016 2017 2018 2019 2020 2021 2022 2023
Ongoing: X2Rail-2, X2Rail-4, OPTIMA
TD2.10: Smart radio-connected all-in-all wayside objects2015 2016 2017 2018 2019 2020
Ongoing: X2Rail-1, X2Rail-3, 4SECURAIL
TD2.9: Traffic management evolution
Topic
number -
IP
Topic nameExpected
TRL
Type of
action
Maximum S2R
co-funding
EUR
Complementarity
S2R-OC-
IP2-01-
2020
Modelling of the Moving
Block system specification
and support for Railway
Minimum Operational
Performance Standards
3/4 RIA 1,340,000
S2R-CFM-IP2-01-2020: Completion of
activities for Adaptable Communication,
Moving Block, Fail safe Train
Localisation (including satellite), Zero on
site Testing, Formal Methods and Cyber
Security
X2RAIL-3 (GA 826141)
S2R-OC-
IP2-02-
2020
Study on alternative
bearers and on
communication protocols
4/5 RIA 350,000 S2R-CFM-IP2-01-2020
X2RAIL-3 (GA 826141)
IP2: Open Calls 2020
• S2R-OC-IP2-01-2020: Modelling of the Moving Block system specification and support for Railway Minimum Operational Performance Standards, TRL 3
Within the framework of the Moving Block the proposal has to carry out the following work:
To create semi-formal or formal models of the Moving Block systems, using the Formal Method methodologydeveloped in X2RAIL-2, in order to examine the system behaviour, and check for additional hazards arising fromthe use of Moving Block.
To create semi-formal or formal models of the enhancements to the Moving Block architectures, as proposed bythe “Future Moving Block Architectures” topic within the project S2R X2Rail-3.
Within the framework of the Fail Safe Train Localisation, the proposal has to carry out the following work:
• Definition and Development of Railway Fault Detection and Exclusion (FDE) algorithms for coping with railway system and local feared events in the context of both mono/dual constellations and mono/dual frequencies
• Definition and Development of Data Fusion algorithms among different possible technologies such as for example EGNSS, IMU, Kinematics, Digital Map suitable for providing a safe position in the position domain along with the associated integrity
• Select candidate techniques and algorithms for the implementation of a Proof of Concept
• Test and assess performances in a real or simulated railway environment
• Contribution to the definition of the Railway Minimum Operational Performance Standards and the trade-off analysis about the use of the Standard SBAS (e.g. EGNOS) augmentation systems
AWP 2020, targets and content – IP2
• S2R-OC-IP2-02-2020: Study on alternative bearers and on communication protocols, TRL 4/5
For what concerns the study of the communication bearers the action shall: Describe the alternative bearers from a technology perspective; Qualify the benefits and challenges of the bearers, taking into account operational and
economic considerations; Compare the expected communication characteristics with well-established wireless
technologies Provide recommendations and classification.
For what concerns the study of the communication protocols the action shall:
• Identify the appropriate transport protocol for ensuring communication characteristics and capabilities during application development
• Analyse the different options for the transport layer (UDP, TCP, SCTP , etc.) and the application layer protocols (HTTP, QUIC, SIP, etc.) with the aim to narrow the selection for certain application requirements, qualifying the protocols in terms of technology features like flexibility, latency and prioritization as well as operational considerations including engineering and implementation complexity, monitoring and debugging capabilities;
• Analyse the security of the transport and application layer with using the secure version of protocols, e.g. SFTP or SCP instead of FTP, or HTTPS instead of HTTP or combining the protocols with application security.
AWP 2020, targets and content – IP2
IP3: Planning of activities per TD
TD3.1 Enhanced Switch & Crossing System2015 2016 2017 2018 2019 2020 2021 2022 …
Finished: In2Rail, IN2TRACK
AWP 2020: CFM
2015 2016 2017 2018 2019 2020
TD3.4 Next Generation Track System
Finished: In2Rail, IN2TRACK2021 2022
AWP 2020: CFM
Ongoing: IN2TRACK2
Ongoing: IN2TRACK2
Ongoing: IN2TRACK2
2022 …
TD3.3 Optimised Track System
2016 2017 2018 2019 2020 2021 2022Finished: In2Rail
AWP 2020: CFM, OCOngoing: IN2TRACK2
2015
TD3.2 Next Generation Switch & Crossing System2015 2016 2017 2018 2019 2020 2021
Finished: In2Rail, S-CODE
…
AWP 2020: CFM
…
IP3: Planning of activities per TD
Ongoing: IN2TRACK2, Assets4Rail
2019 2020 2021
TD3.6 Dynamic Railway Information Management System (DRIMS)2015 2016 2017 2018 2019 2020 2021
2022 …
AWP 2020: CFM
2015 2016 2017 2018
2022 …
TD3.5 Proactive Bridge and Tunnel Assessment, Repair and Upgrade2015 2016 2017 2018 2019 2020
TD3.8 Intelligent Asset Management Strategies (IAMS)
TD3.7 Railway Integrated Measuring and Monitoring System (RIMMS)
2021 2022 …2015 2016 2017 2018 2019 2020
AWP 2020: OC
AWP 2020: OC
Finished: In2Rail, IN2TRACK
Finished: IN2SMART, IN2DREAMS
Finished: In2Rail, IN2SMART, MOMIT
Finished: In2Rail, IN2SMART
2022 …
Ongoing: IN2SMART2
Ongoing: IN2SMART2, Assets4Rail
Ongoing: IN2SMART2
2021
IP3: Planning of activities per TD
Ongoing: FAIR Stations, In2Stempo
2021 2022 …
TD3.11 Future Stations2015 2016 2017 2018 2019
2015 2016 2017 2018 2019 2020
…
Ongoing: IN2STEMPO
2020 2021 2022
Finished: In2Rail, In2Dreams
Ongoing: IN2STEMPO, FUNDRES
…
TD3.10 Smart Metering for Railway Distributed Energy Resource Management System
2015 2016 2017 2018 2019 2020Finished: In2Rail
2022
TD3.9 Smart Power Supply2021
Topic number - IP Topic nameExpected
TRL
Type of
action
Maximum S2R
Co-funding
EUR
Complementarity
S2R-OC-IP3-01-2020Next Generation Track Transition Zones
5/6 RIA 1,350,000
S2R-CFM-IP3-01-2020: Research into optimised and future railway infrastructure
IN2TRACK-2 (GA 826255)
S2R-OC-IP3-02-2020
Technology Development for Railway SystemsAsset Management
4/5 RIA 1,710,000 IN2SMART-2 (881574)
S2R-OC-IP3-03-2020
Advanced tools and equipment: collaborative robots &wearable mobile Machines
5/6 RIA 2,700,000 IN2SMART-2 (881574)
IP3: Open Calls 2020
S2R-0C-IP3-01-2020: Next Generation Track Transition Zones• Detailed design and technical specification for physical transition zone demonstrators (->CFM)
• Protypes and small-scale demonstrators of next generation transition zone components and sub-systems - TRL5
S2R-OC-IP3-02-2020: Technology Development for Railway Systems Asset Management (TD3.6)- (EUfunding: 1,710,000 €)
• Prescriptive data analytics tools to implement a Decision Support System, with man in the loop, for IAMS – TRL4-5
• Multi-objective decisions’ optimization tools for IAMS – TRL 4-5
S2R-OC-IP3-03-2020: On track machines shift to collaborative robots (TD3.8)- (EU funding: 2,700,000 €)• Development of standalone demonstrator of an improved existing plant (machines and equipment) by
integrating robot technology (Robot Operating System) to support future inspection and execution ofmaintenance actions – TRL 5-6
• Development and validation of a prototype of exoskeleton suitable for outside conditions which can perform aset of different maintenance task– TRL 6-7
AWP 2020, targets and content – IP3
IP4: Planning of activities per TD
AWP 2020: CFM
AWP 2020: CFM
Ongoing: CONNECTIVE, SPRINT, RIDE2RAIL
TD4.4 Trip Tracker
…
…
2017
TD 4.1 Interoperability Framework
TD4.2 Travel Shopping
TD4.3 Booking and Ticketing
…
…
2022
2018
2021
2021 2022
2020
2015 2017
201920182015
2020
2020
2020 2021 2022
20222021
AWP 2020: CFM
AWP 2020: CFM
2015 2018
20192016
2016
Finished: IT2RAIL, Co-Active
2016 2017
2017
2019
Finished: IT2RAIL, GOF4R, ST4RT
20182016 2019
Finished: IT2RAIL, Co-Active
Finished: IT2RAIL, ATTRACkTIVE
2015
Ongoing: MaaSive, RIDE2RAIL
Ongoing: MaaSive, RIDE2RAIL
Ongoing: My-TRAC, MaaSive, RIDE2RAIL
IP4: Planning of activities per TD
AWP 2020: CFM
Finished: IT2RAIL
AWP 2020: CFM, OC
Ongoing: COHESIVE, SPRINT, Shift2MaaS
TD4.5 Travel Companion
Ongoing: CONNECTIVE
…
2020
…
TD4.6 Business Analytics
iTD4.7 Integrated Technical Demonstrator
2015
20222015
2016
2016 2021
20182017
2020
AWP 2020: CFM
…2021 20222017 20192016 20182015
Ongoing: My-TRAC, MaaSive, RIDE2RAIL
2019
2019
2022
2017 2018
Finished: IT2RAIL, ATTRACkTIVE
2020 2021
Finished: IT2RAIL
IP4: Open Calls 2020
Topic
number -
IP
Topic nameExpected
TRL
Type of
action
Maximum S2R
Co-funding
EUR
Complementarity
S2R-OC-
IP4-01-
2020
Supporting the
implementation of
the IP4 multimodal
transport
ecosystem
6/7 IA 2,000,000
S2R-CFM-IP4-01-
2020: Enhanced end-
user centric travel
ecosystem
COHESIVE
(GA777599)
CONNECTIVE (GA
777522)
OC: Complementary Travel Expert Services , TRL 6-7
Criteria for multi-modal travel planning:
Research and definition of categories for the whole trip or legs of the trip (i.e. environmental aspects,comfort, specific needs for disabled people, traffic conditions, other, etc.)
Development of algorithms to propose quantitative estimates
Ride-Sharing in a multi-modal journey context:
• Research on how to ensure successful ride-sharing to complete first/last mile of multimodal trips based on a sample of existing passengers (behavioral studies)
• Development of applications running “as a service”, acting as crowd-based Travel Service Provider (i.e. algorithms and proof of concept for ride-sharing incl. offering, ticketing, settlement, validation and tracking) and as part of the Travel Companion through integration of specific modules for (car) seat offer management, validity checks of Entitlements/Tokens generated, etc.
• Research on algorithms for optimal synchronization of sharing mobility solutions and other transportation modes with the rail service and for optimal matching between drivers - riders within a ride-sharing system, for the first/last mile solution of a rail-based multimodal journey.
AWP 2020, targets and content – IP4 2/2
CCA: Planning of activities per TD
Ongoing: IMPACT-2
Fin: IMPACT-1, NEAR2050
WA1 Long-term needs and socio-economic research & SPD's2015 2016 2017 2018 2019 2020 2021 2022 …
WA2 KPI method and integrated assessment…
AWP 2020: Tender
Finished: Roll2Rail, IMPACT-1
Ongoing: Tender KPIs, IMPACT-2
WA3 Safety, Standardisation, Maintanance, Materials, Virtual Certification2015 …2016 2017 2018 2019
20192015 2016 2017 2018
2021 2022
2020 2021 2022
2020Finished: PLASA, GoSAFE RAIL, SMaRTE
Ongoing: IMPACT-2, PLASA-2
CCA: Planning of activities per TD
AWP 2020: OC
WA5 Energy and sustainability2020
…
2021 2022 …
WA6 Human Capital2015 2016 2017
Ongoing: IMPACT-2
20212020
…
WA4 Smart Planning, I2M2015 2016 2017
2018
Tender HC, SMaRTE
20222019
Ongoing: FINE-2, TRANSIT
Finished: Roll2Rail, PLASA, GoSAFE RAIL
Finished: Roll2Rail, DESTINATE, FINE 1, OPEUS
Ongoing: IMPACT-2, PLASA-2, FINE-2
2019
2019 2020 2021 20222018
2015 2016 2017 2018
Topic
number -
IP
Topic nameExpected
TRLType of action
Maximum S2R
co-funding
EUR
Complementarity
S2R-OC-
CCA-01-
2020
Noise & Vibration 3/4 RIA 950,000 FINE-2 (881791)
CCA: Open Calls 2020
S2R-OC-CCA-01-2020: Noise and Vibration
Ground vibration:
• To develop a commonly accepted, practical and validated prediction tool for ground vibrationimpact studies during environmental impact assessment of new or upgraded railway projects.
New Technologies Auralisation and Visualisation:
• The development of a fully functional system for auralisation and visualisation based onphysically correct synthesized railway noise and interfaces to a virtual reality visualisationsoftware.
• The tool shall be able to meet three basic main requirements:
Demonstration of the results of the work on noise reduction in the S2R JU.
Demonstration of vehicle performance for customers and development engineers
Demonstration of the acoustic situation and the effect of noise mitigation measures inlarge-scale projects preferable with an interface to commercial 3D Visualisation software
AWP 2020, targets and content - CCA
IPX: Ongoing activities2018:
• (OC) FLEX-RAIL forecast evolution of key fundamental technologies & technical risks
• (OC) MVDC-ERS next generation DC power electrification systems, renewable sources
• (OC) B4CM develop blockchain testbed for rail
• (OC) TER4RAIL investigate new opportunities for innovative research, cross-fertilizationfrom other disciplines
2019:• (OC) Translate4Rail braking language barriers, predefined standardised messages driver-
traffic manager
• (OC) RAILS investigating Artificial Intelligence for rail automation, predictive maintenanceand defect detection, traffic planning and capacity optimisation
• (CFM) LinX4Rail develop a railway Functional System Architecture and Conceptual Data Model (CDM)
Topic
number -
IP
Topic name Expected TRL Type of action
Maximum S2R co-
funding
EUR
Complementarity
S2R-OC-
IPX-01-
2020
Innovation in
guided transport- CSA 250,000 -
IPX: Open Calls 2020
S2R-OC-IPX-01-2020: Innovation in guided transport - (EU funding: 0.25M€)
• Define the enhanced / innovative modes in term of: Concept of operations
Safety cases
Functional specification
Operational conditions and testing methodologies / environment.
• Identify the potential transferability and synergies with Railways solutions,processes and procedures in general, and in particular for a technologicalperspective with the S2R innovations (Technology Demonstrators and IPx activities).
AWP 2020, targets and content
Thank you for your attention