    Foundation Design:

    Axial load(P) Xi Yi P*Xi P*Yi

    KN m m KNm KNm

    A1 281.495 0 0 0 0

    A2 455.267 1.736 0 790.344 0

    B1' 331.816 -1.7 2.741 -564.087 909.508

    B1 358.054 0 2.819 0 1009.35

    B2 620.749 1.736 2.819 1077.62 1749.89C1' 269.977 -3.184 5.23 -859.607 1411.98

    C1 369.228 0 5.509 0 2034.08

    C2 514.543 1.736 5.639 893.247 2901.51

    3201.129 1337.52 10016.3

    Xi Yi X Y qu

    m m m m KN/m2

    A1 0 0 -0.51 -3.25 99.694

    A2 1.736 0 1.23 -3.25 93.330

    B1' -1.7 2.741 -2.21 -0.509 98.548B1 0 2.819 -0.51 -0.431 92.106

    B2 1.736 2.819 1.23 -0.431 85.742

    C1' -3.184 5.23 -3.69 1.98 97.288

    C1 0 5.509 -0.51 2.259 84.865

    C2 1.736 5.639 1.23 2.389 78.151

    L 6.05 m

    B 5.94 m

    X(load) 0.418 m

    Y(load) 3.129 m

    x cg 0.51 m

    y cg 3.25 m

    Column

    Column

    Required data:

    Case considered=1.5(DL+LL)

    Total design factored load=3201.129KN

    Safe soil bearing capacity=100KN/m2

    Concrete grade M20

    Steel grade Fe500

  • 7/25/2019 Mat Autosaved

    2/3

    ex X-x -0.09217 m

    ey Y-y -0.121 m

    Mx (P)*ey -387.351 KNm

    My (P)*ex -295.059 KNm

    Ix 105.6656m

    Iy 109.6153m4

    qu1

    89.08 -3.66582 x -2.69177 y

    Moment calculation and depth check

    Longest span in X axis 3.184 m

    Longest span in y axis 3.226 m

    Mu (w*l^2)/10 0.000 KNm

    Mu MulimMu 0.36*fck*b*xu,max(d-0.42xu,max)

    d > 0 mm

    Mu (w*l^2)/10 0.000 KNm

    Mu MulimM

    u 0.36*f

    ck*b*x

    u,max(d-0.42x

    u,max)

    d > 0 mm

    Punching check

    at B2 (one face edge)

    Pu 620.749 KN

    Permissible shear stress 0.25fck 1118KN/m2

    d 0.255 m

    at A2 (two face edge)

    Pu 455.267 KNPermissible shear stress 0.25fck 1118KN/m2

    d 0.375 m

    at B1 (Interior)

    Pu 358.054 KNm

    Permissible shear stress 0.25fck 1118KN/m2

    d 0.157 m

  • 7/25/2019 Mat Autosaved

    3/3

    Taking Maximum of all

    d 0.375 m

    d 0.4 m (for safety)

    Cover 0.05 m

    D 0.45 m

    Calculation of bar

    Mu 103.75 KNm

    ast 620.31mm2

    Provide 12mm dia. Bars

    spacing 182.2314649 mm

    taking

    spacing 175 mm